Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹66.9 LAdmitted-Finance | -1.10% | ₹66.9 L | L1 | Admitted-Finance |
| 2 | L2₹67.5 LAdmitted-Finance | -0.25% | ₹67.5 L | L2 | Admitted-Finance |
| 3 | L3₹67.5 LAdmitted-Finance | -0.20% | ₹67.5 L | L3 | Admitted-Finance |
Tender Value
₹79.8 L
EMD Value
₹5.4 L
Closing Date
8 Jun 2026, 3:00 pmClosed
Executive Engineer
Nagar Nigam Firozabad
Construction of RCC drain for drainage from water tank to Santoshi Traders in Ward No. 35 Lallu.
2026_DOLBU_1148317_28
05/PWD_15vitt_Rajvitt/2026-27
Open Tender
Civil Works
Firozabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,981
Municipal Corporation
₹5.4 L
4 Jul 2026
18 May 2026
8 Jun 2026
18 May 2026
8 Jun 2026
18 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil or silt (loam, clay or sand) including lift upto 1.50m and lead up to 30m and including filling watering and ramming of excavated earth in to the trenches or in to the space between the building and the side of foundation trenches or in to the plinth and removal and disposal of surplus earth as directed by the Engineer in charge up to a distance of 30m from the foundation trenches. (PWD SOR 2022-23, Chepter-4, Item No.251 ) | 1,280 | cum | 135 | ₹1,72,800 |
| 2 | Providing and laying cement concrete in 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 40mm nominal size) including supply of all materials, labour and T&P etc. required for completion of work and curing complete. including cost of form work in Foundation and floors. (PWD SOR 2022-23 Chapter No-05 Item No. 273 spec. No. 5.4.1 | 90 | cum | 4,200 | ₹3,78,000 |
| 3 | RCC work Providing and laying in position specified grade of reinforced cement concrete in Raft foundation, including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level in :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (PWD SOR 2022-23, Chepter-5, Item No. 5.1 ) | 140 | cum | 8,000 | ₹11,20,000 |
| 4 | R.C.C work in Wall (any thickness) including attached plasters, buttresses, plinth and string courses, fillers, columns, pillars, abutments, post and struts etc. including the cost of centering, shuttering, finishing and excluding reinforcement All work up to plinth level in 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) upto plinth level (PWDSOR 2022-23 Chapter No-05 Item No. 5.2spec. No. 5.2.2) | 270 | cum | 8,200 | ₹22,14,000 |
| 5 | R.C.C work Providing and laying in position specified grade of reinforced cement concrete, including the cost of centering, shuttering, finishing and excluding reinforcement All work up to plinth level in 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) (PWDSOR 2022-23 Chapter No-05 Item No. 5.1spec. No. 5.1.3) | 4.48 | cum | 7,450 | ₹33,376 |
| 6 | M.S or Iron work in plain work such as reinforced concrete or reinforced brick work (When not included in and an over all rates) brought to required shape as necessary of the work and including the suply of steel and its wastage bend, hooks and authorized over lapping shall be measured upto floor to level. (As per Analysis of Rate) | 406.71 | Qtl | 6,960 | ₹28,30,701.6 |
| 7 | M.S Speciefication Board including painting & writing | 1 | job | 4,590 | ₹4,590 |
| 8 | P/F of Inogration Granite stone including writing and | 1 | job | 10,380 | ₹10,380 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 11.04 MB
BOQ_2150131.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid