Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.1 LAccepted-Finance | ₹47.1 L | L1 | Accepted-Finance As per NIT work has been awarded to L2 30 percentage at L1 rate. |
| 2 | L1₹85.2 LAccepted-Finance 27E K B SARANI MALL ROAD KOLKATA 700081 | KOLKATA | KOLKATA | WEST BENGAL | 700081 | ₹85.2 L | L1 | Accepted-Finance As per NIT work has been awarded to L1 70 percentage. |
| 3 | L3₹83.2 LRejected-Finance | ₹83.2 L | L3 | Rejected-Finance L3 bidder. |
| 4 | L4₹84.4 LRejected-Finance | ₹84.4 L | L4 | Rejected-Finance L4 bidder. |
| 5 | L5₹84.8 LRejected-Finance | ₹84.8 L | L5 | Rejected-Finance L5 bidder. |
Tender Value
₹1.0 Cr
EMD Value
₹2.0 L
Closing Date
6 Sept 2019, 6:00 pmClosed
AGM (E-C)
Bagdogra Airport, Bagdogra
Misc Minor Capital Works at Bagdogra Airport during 2019 20
2019_AAI_30788_1
02/2019-20
Open Tender
Civil Works
Percentage
540 days
Bagdogra Airport
As per NIT
6 documents required · 6 mandatory
₹1,120
Airports Authority of India
₹2.0 L
17 Mar 2021
26 Aug 2019
17 Sept 2019
27 Aug 2019
6 Sept 2019
27 Aug 2019
27 Aug 2019 - 6 Sept 2019
Government eProcurement System Created By: Sujit Podder Created Date/Time: 20-Sep-2019 04:36 PM Tender Title: Misc Minor Capital Works at Bagdogra Airport during 2019 20 Tender ID: 2019_AAI_30788_1
Tender Inviting Authority: AGM (E-C)
Name of Work: Misc Minor Capital Works at Bagdogra Airport during 2019-20.
Contract No: 02/2019-20
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 M/s. A S Traders 10172840.00 -12.10 8941926.36 Eighty Nine Lakh Fourty One Thousand Nine Hundred and Twenty Six
2.00 R M SARKAR AND CO PVT LTD 10172840.00 -16.65 8479062.14 Eighty Four Lakh Seventy Nine Thousand Sixty Two
3.00 Chinmoyee Construction 10172840.00 4.38 10618410.39 One Crore Six Lakh Eighteen Thousand Four Hundred and Ten
4.00 B C Enterprise 10172840.00 -18.18 8323417.69 Eighty Three Lakh Twenty Three Thousand Four Hundred and Seventeen
5.00 M/s. DAS CON INDIA PRIVATE LIMITED 10172840.00 -22.00 7934815.20 Seventy Nine Lakh Thirty Four Thousand Eight Hundred and Fifteen
6.00 unison construction 10172840.00 5.50 10732346.20 One Crore Seven Lakh Thirty Two Thousand Three Hundred and Fourty Six
7.00 Paul Construction 10172840.00 -21.00 8036543.60 Eighty Lakh Thirty Six Thousand Five Hundred and Fourty Three
8.00 R N CONSTRUCTION CO 10172840.00 -17.00 8443457.20 Eighty Four Lakh Fourty Three Thousand Four Hundred and Fifty Seven
Lowest Amount Quoted BY: M/s. DAS CON INDIA PRIVATE LIMITED(7934815.20)
BOQ Summary Details Tender Title: Misc Minor Capital Works at Bagdogra Airport during 2019 20 Tender ID: 2019_AAI_30788_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 M/s. DAS CON INDIA PRIVATE LIMITED 7934815.20 L1
2 Paul Construction 8036543.60 L2
3 B C Enterprise 8323417.69 L3
4 R N CONSTRUCTION CO 8443457.20 L4
5 R M SARKAR AND CO PVT LTD 8479062.14 L5
6 M/s. A S Traders 8941926.36 L6
7 Chinmoyee Construction 10618410.39 L7
8 unison construction 10732346.20 L8
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .