Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC 11 239 BAJRANG NAGAR REWA | REWA | MADHYA PRADESH | 486001 | ₹1.5 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.5 Cr+₹3.4 L (2.26%)Rejected-Finance WARD NO 7 DAHIYA BHAGWANPUR DIST BEGUSARAI BIHAR 851134 | BEGUSARAI | BIHAR | 851134 | ₹1.5 Cr+₹3.4 L (2.26%) | L2 | Rejected-Finance high rate is not accepted |
| 3 | L3₹1.7 Cr+₹14.3 L (9.48%)Rejected-Finance | ₹1.7 Cr+₹14.3 L (9.48%) | L3 | Rejected-Finance high rate is not accepted |
| 4 | Not Admitted-Fee/PreQual/Technical 01 SORANA NAKUR SAHARANPUR UTTAR PRADESH 247232 | SAHARANPUR | UTTAR PRADESH | 247232 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.8 Cr
EMD Value
₹1.8 L
Closing Date
13 Sept 2022, 5:30 pmClosed
KS KUSHRE
OFFICE OF THE EE PHED
(JJM AND NAVEEN) Design and Construction of RCC OHT, Sumpwell and Laying and Jointing of Pipeline at vill. Khamhariya, Jargi (ChirpaniTola), Dungariya, Bakchheradona (Jamgaontola), Ghughra as per BOQ of Block Mandla, Mohgaon District Mandla
2022_PHED_219476_1
NIT No. 51/ProCell/EE /PHED/2022-23
Open Tender
Civil Works - Water Works
Percentage
270 days
OFFICE OF THE EE PHED
Please refer Tender documents.
3 documents required · 3 mandatory
₹12,500
₹1.8 L
25 Mar 2023
30 Aug 2022
15 Sept 2022
30 Aug 2022
13 Sept 2022
30 Aug 2022
eProcurement System Government of Madhya Pradesh Created By: Chitrabhushan Shivanshi Created Date/Time: 06-Oct-2022 05:51 PM Tender Title: (JJM AND NAVEEN) Design and Construction of RCC OHT, Sumpwell and Laying and Jointing of Pipeline at vill. Khamhariya, Jargi (ChirpaniTola), Dungariya, Bakchheradona (Jamgaontola), Ghughra as per BOQ of Block Mandla, Mohgaon District Mandla Tender ID: 2022_PHED_219476_1
Tender Inviting Authority: EE PHED MANDLA
Name of Work: Design and Construction of Retrofiting (JJM) and New Water Supply Schemes based on Costruction of RCC OHT, Sumpwell, Providing and Installation of Pump, Provission Three Phase Electic and House Hold Tap Cannection and Laying and Jointing of Pipeline at vill. Khamhariya, Jargi (ChirpaniTola), Dungariya, Bakchheradona (Jamgaontola), Ghughra as per BOQ of Block Mandla, Mohgaon District Mandla Including Cost of All Matarial and Labour with 90 Days Trail Run/Commissioning period of Successful Entire Scheme. .
Contract No: ee phed
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 H M S CONSTRUCTION COMPANY(GSTN-23GPIPS3540L1ZI) 18203000.00 -16.89 15128513.30 One Crore Fifty One Lakh Twenty Eight Thousand Five Hundred and Thirteen
2.00 TARA MACHINARY(GSTN-NA) 18203000.00 -15.01 15470729.70 One Crore Fifty Four Lakh Seventy Thousand Seven Hundred and Twenty Nine
3.00 m/s k k basal(GSTN-NA) 18203000.00 -9.01 16562909.70 One Crore Sixty Five Lakh Sixty Two Thousand Nine Hundred and Nine
Lowest Amount Quoted BY: H M S CONSTRUCTION COMPANY(15128513.30)
BOQ Summary Details Tender Title: (JJM AND NAVEEN) Design and Construction of RCC OHT, Sumpwell and Laying and Jointing of Pipeline at vill. Khamhariya, Jargi (ChirpaniTola), Dungariya, Bakchheradona (Jamgaontola), Ghughra as per BOQ of Block Mandla, Mohgaon District Mandla Tender ID: 2022_PHED_219476_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 H M S CONSTRUCTION COMPANY 15128513.30 L1
2 TARA MACHINARY 15470729.70 L2
3 m/s k k basal 16562909.70 L3
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .