| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.0 LAccepted-AOC DAFAI NO 3 JAMUNA COLLIERY DISTT ANUPPUR MP PIN 484444 | JAMUNA COLLIERY | ANUPPUR | MADHYA PRADESH | 484444 | L1 | Accepted-AOC Accepted due to lowest rate and fulfilling the technical criteria as per NIT. | |
| 2 | L2₹11.3 L+₹31,018 (2.82%)Rejected-Finance JAMUNA COLLIERY DIST ANUPPUR M P | JAMUNA COLLIERY | ANUPPUR | MADHYA PRADESH | 484444 | L2 | Rejected-Finance Rejected due to higher rate as per Tender Committee. | |
| 3 | L3₹13.0 L+₹2.0 L (17.8%)Rejected-Finance HOUSE NO 231 WARD NO 04 DHANPURI NO 3 DISTT SHAHDOL M P 484114 | DHANPURI | SHAHDOL | MADHYA PRADESH | 484114 | L3 | Rejected-Finance Rejected due to higher rate as per Tender Committee. |
Tender Value
₹21.2 L
EMD Value
₹26,500
Closing Date
17 Jun 2022, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Staff Officer (Civil)
Office of the Staff Officer (Civil), Jamuna Kotma Area. Phone - 9425531831
Providing Dust Barrier With Green Net at Top (20 Feet Height) Around CHP Area at Jamuna UGRO of Jamuna Kotma Area
2022_SECL_244889_1
SECL/JK/SO(C)/ETED/22-23/27
Open Tender
Civil Works - Others
Item Rate
120 days
JUGRO
Please Refer Tender Documents.
3 documents required · 3 mandatory
₹26,500
28 Aug 2022
26 May 2022
18 Jun 2022
26 May 2022
17 Jun 2022
27 May 2022
27 May 2022 - 8 Jun 2022
120 days
Amount
Item Description/ Heading
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. All kinds of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources: 6 graded stone aggregate 40 mm nominal size derived from natural sources).
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, ifnishing and reinforcement- All work up to plinth level : 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III)derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level : Thermo-Mechanically Treated bars of grade Fe-500D or more.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Centering and shuttering including strutting, propping etc. and removal of form for foundations, footings, bases of columns, etc. for mass concrete.
Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts.
Centering and shuttering including strutting, propping etc. and removal of form for lintels, beams, plinth beams, girders, bressumers and cantilevers
Brick work with Fly ash bricks of class designation 75 in superstructure above plinth level upto floor V level in all shapes and sizes in cement mortar 1:6 (1 cement : 6 coarse sand ).
12 mm cement plaster of mix : 1:6 (1 cement: 6 fine sand)
Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes.
Providing and fixing mild steel round holding down bolts with nuts and washer plates complete.
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work.
Colour washing such as green, blue or buff to give an even shade : New work (two or more coats) with a base coat of white washing with lime
Providing & fixing 3 mtr wide green net of HDPE material, UV stabilised, minimum 170 GSM (gram per sqm), ISI marked and of standard quality capable of stoping the coal dust from passing the net, fixed in frames including placing & stiching etc. all complete as approved by EIC.
Total impact of GST for the purpose of CTC
INDRAJEET GHOSH
SHREE SAI INFRA
stage.html
html • 0.04 MB
techsummary_252977.pdf
PDF • 5.45 MB
finsummary_252977.pdf
PDF • 2.78 MB
LOI.pdf
PDF • 3.67 MB
finance_252977.pdf
PDF • 0.24 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .