| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.9 LAccepted-AOC | 1 | Accepted-AOC lowest amount quotted | |
| 2 | 2₹7.0 L+₹7,981.52 (1.15%)Rejected-AOC KANIYANUR PANCHAYAT | 2 | Rejected-AOC highest amount quotted |
| Sl No | Description | Qty | Unit | SPR TRADERS L2 | M RAVIANAND L1 |
|---|---|---|---|---|---|
| 1.00Construction of Bus Shelter at Kavanur Panchayat in Thimiri Block | |||||
| 1.01 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 15.25 | Cum | 263.78 ₹4,023 Lowest | 263.78 ₹4,023 Lowest |
| 1.02 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 5.59 | Cum | 5,505.2 ₹30,774 Lowest | 5,505.2 ₹30,774 Lowest |
| 1.03 | Supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 10.8 | Cum | 450 ₹4,860 | 386.45 ₹4,174 Lowest |
| 1.04 | Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications for etc Complete | 12.43 | Cum | 6,185.63 ₹76,887 Lowest | 6,185.63 ₹76,887 Lowest |
| 1.05Supplying & Erecting centering for sides & soffits including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle etc Complete | |||||
| 1.06 | upto GL | 11.35 | Sqm | 547.5 ₹6,214 Lowest | 547.5 ₹6,214 Lowest |
| 1.07 | above GL | 78.65 | Sqm | 1,095 ₹86,122 Lowest | 1,095 ₹86,122 Lowest |
| 1.08 | Supply and fabrication of steel including cost and conveyance and all labour charges etc. complete. | 1.15 | MT | 92,000 ₹1,05,800 | 91,910.02 ₹1,05,697 Lowest |
| 1.09 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete | 9.44 | Cum | 9,402.7 ₹88,761 Lowest | 9,402.7 ₹88,761 Lowest |
Tender Value
Refer Docs
EMD Value
₹7,000
Closing Date
6 Feb 2026, 3:00 pmClosed
Block developement officer
Block developement office
Construction of Bus Shelter at Kavanur Panchayat in Thimiri Block
2026_RDTN_650641_1
A2/1883/2024
Open Tender
Civil Works
Item Wise
180 days
Block developement office
Construction of Bus Shelter at Kavanur Panchayat in Thimiri Block
2 documents required · 2 mandatory
₹0
₹7,000
Block developement office
23 Sept 2026
3 Feb 2026
6 Feb 2026
3 Feb 2026
6 Feb 2026
3 Feb 2026
3 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of Bus Shelter at Kavanur Panchayat in Thimiri Block | |||||
| 1.01 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 15.25 | Cum | 263.78 | ₹4,022.64 |
| 1.02 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 5.59 | Cum | 5,505.2 | ₹30,774.07 |
| 1.03 | Supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 10.8 | Cum | 386.45 | ₹4,173.66 |
| 1.04 | Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications for etc Complete | 12.43 | Cum | 6,185.63 | ₹76,887.38 |
| 1.05 | Supplying & Erecting centering for sides & soffits including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle etc Complete | - | - | - | - |
| 1.06 | upto GL | 11.35 | Sqm | 547.5 | ₹6,214.13 |
| 1.07 | above GL | 78.65 | Sqm | 1,095 | ₹86,121.75 |
| 1.08 | Supply and fabrication of steel including cost and conveyance and all labour charges etc. complete. | 1.15 | MT | 91,910.02 | ₹1,05,696.52 |
| 1.09 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete | 9.44 | Cum | 9,402.7 | ₹88,761.49 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
kavanur.pdf
Tender Documents • 0.44 MB
BOQ_780117.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .