Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-AOC 22A SOUTH BEACH ROAD TUTICORIN 01 | L1 | Accepted-AOC L1 | |
| 2 | L2₹3.8 L+₹11,200 (3.04%)Rejected-AOC 4 9 2 ETTAYAPURAM ROAD NEAR A P C MAHALAKSHMI COLLEGE TUTICORIN 2 | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | VEL ENGINEERING | SNS MECHATRONICS |
|---|---|---|---|---|---|
| 1.00 | Rewinding and replacing of worn out bearing in window AC / Split AC and fan motors including the cost of new bearing, copper wire, to & fro charges and consumables. [Retrieved material will be retained by the contractor]. | 60 | Nos | 2,31,000 ₹2,72,580 | 2,22,000 ₹2,61,960 Lowest |
| 2.00 | Renewal of shaft and replacement of bush by bearings including the cost of new bearings in window AC / Split AC fan motors including cost of new shaft, bearing, to and fro charges and consumables | 20 | Nos | 56,000 ₹66,080 | 54,000 ₹63,720 Lowest |
| 3.00 | Replacement of worn out bearings in window AC / Split AC fan motors and overhauling of the motors including the cost of new bearings, and consumables. | 40 | Nos | 66,000 ₹77,880 | 64,000 ₹75,520 Lowest |
| 4.00 | Less:
The cost of retrieved copper (this copper scraped to be retained by the Contractor) | 60 | Nos | 27,000 ₹31,860 Lowest | 28,800 ₹33,984 |
Tender Value
Refer Docs
EMD Value
₹2,900
Closing Date
2 Jan 2026, 2:00 pmClosed
CE/TTPS
O/o CE/TTPS
TTPS Operation Circle MPMII ACP Rewinding, Replacement of shaft bush bearing of window AC Split AC fan motors at various operation location for the period from 01.04.2026 to 31.03.2027
2025_EB_634282_1
CE/SE/O/TTPS/Spec.No.67/26-27
Open Tender
Maintenance Works
Item Rate
365 days
TTPS
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹2,900
Yes
CE/TTPS
13 Mar 2026
20 Dec 2025
3 Jan 2026
20 Dec 2025
2 Jan 2026
20 Dec 2025
20 Dec 2025
Rewinding and replacing of worn out bearing in window AC / Split AC and fan motors including the cost of new bearing, copper wire, to & fro charges and consumables. [Retrieved material will be retained by the contractor].
Renewal of shaft and replacement of bush by bearings including the cost of new bearings in window AC / Split AC fan motors including cost of new shaft, bearing, to and fro charges and consumables
Replacement of worn out bearings in window AC / Split AC fan motors and overhauling of the motors including the cost of new bearings, and consumables.
Less: The cost of retrieved copper (this copper scraped to be retained by the Contractor)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
BOQ_758964.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .