| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.1 CrAccepted-AOC 4 | ₹20.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹20.5 CrRejected-AOC KOLHAPUR | KOLHAPUR | KOLHAPUR | MAHARASHTRA | ₹20.5 Cr | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | M/S Triveni Construction L2 | M/S Shivparvati Construction Sangli L1 |
|---|---|---|---|---|---|
| 1.00 | Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing off unsuitable or excess stuff as directed all sorts of soils. | 5,946.57 | Cubic Metre | 130.65 ₹7.8 L | 130.65 ₹7.8 L |
| 2.00 | Picking the road surface including sectioning, excetra complete. (Black topped surface) | 1,100 | Square Metre | 48.3 ₹53,130 | 48.3 ₹53,130 |
| 3.00 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing to proper grade and camber, applying and brooming requisite type of screening / binding material to fill the interstices of coarse aggregate, watering and compacting with Vibratory roller to the required density. - By Mechanical Means - Grading II Using Screening type-B (11.2 milimetre Aggregate) | 92.5 | Cubic Metre | 2,985.85 ₹2.8 L | 2,985.85 ₹2.8 L |
| 4.00 | Providing and constructing 50 milimetre thick modified penetration macadam road surface including all materials, preparing the existing road surface, spreading 40 milimetre stone metal layers 100 percent crusher broken metal with conical crusher plant, heating and spraying the bitumen of of specified grade at the rate of 1.75 kilogram per square metre, spreading 12 milimetre size chips, compacting with three wheel static roller having weight 8 to 10 metric tonnes to achive the desired degree of compaction as per technical specification Clause 506, excetra complete. Excluding picking of existing water bound macadam surface. (Using VG-30 bulk bitumen) | 1,233.33 | Square Metre | 248.7 ₹3.1 L | 300 ₹3.7 L |
| 5.00 | Providing and constructing 50 milimetre thick modified penetration macadam road surface including all materials, preparing the existing road surface, spreading 40 milimetre stone metal layers 100 percent crusher broken metal with conical crusher plant, heating and spraying the bitumen of specified grade at the rate of 1.75 kilogram per square metre, spreading 12 milimetre size chips, compacting with three wheel static roller having weight 8 to 10 metric tonnes to achive the desired degree of compaction as per technical specification Clause 506, excetra complete, including applying tack coat of specified grade bitumen at the rate of 0.30 kilogram per square metre on existing bitumen surface. (Using VG-30 bulk bitumen) | 44,208 | Square Metre | 350 ₹1.5 Cr | 348 ₹1.5 Cr |
| 6.00 | Proving and laying bituminous macadam using crushed aggregates of grading-I premixed with bituminous binder, transported to site with vehicle tracking system, laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction for 80 / 100 milimetre compacted thickness with 3.3 percent specified Bitumen (Asphalt Grade 60/70). - Using 80 tonnes per hour Batch mix type hot mix plant with Supervisory Control and Data Acquisition, Sensor Paver, vibratory roller ( VG-30 bulk bitumen rates are considered to arrive at rates) | 8,724.17 | Cubic Metre | 9,800 ₹8.5 Cr | 8,390 ₹7.3 Cr |
| 7.00 | Open Graded Premix Surfacing- Providing and Laying OGC 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates premixed with bituminous binder transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction but excluding prime / tack and Seal coat. For Bitumen of specified grade--USING Batch mix type hot mix plant with SCADA, Paver and Vibratory roller( over BT Surface) (VG-30 bulk bitumen rates are considered to arrive at rates) including waste plastic to be used in bituminous treatment as per IRC Sp-98 -2013 @ 8% by weight of bitumen | 1,74,483.33 | Square Metre | 250 ₹4.4 Cr | 275 ₹4.8 Cr |
| 8.00 | Providing and applying tack coat on the prepared surface, heating by flames in boiler and spraying bitumen with sprayer. On dry / hungry black topped surface at the rate of 3.0 killogram per 10 square metre. (Using VG-30 bulk bitumen) | 3,48,966.67 | Square Metre | 25.4 ₹88.6 L | 33 ₹1.2 Cr |
| 9.00 | Providing bituminous type-A liquid seal coat on bituminous surface including supplying all materials and bitumen of VG-30 grade, preparing existing road surface, heating and applying bitumen at the rate of 0.98 kilogram per square metre by mechanical means, spreading chips and rolling by static roller having weight 8 to 10 metric tonne, excetra complete. | 1,74,483.33 | Square Metre | 93.65 ₹1.6 Cr | 107 ₹1.9 Cr |
| 10.00 | Supplying hard murum / kankar at the road site, including conveying and stacking, excetra complete. | 5,040.26 | Cubic Metre | 697.6 ₹35.2 L | 800 ₹40.3 L |
Updated dates
Tender Value
₹19.4 Cr
EMD Value
₹9.8 L
Closing Date
25 Apr 2026, 5:55 pmClosed
Executive Engineer P. W. (South) Dn. Kolhapur
Executive Engineer P. W. (South) Dn. Kolhapur, Near Head Post Office, Opp. Residecny Club, Tarabai Park 416003
Improvement and Widening to Vengurla Amboli Naganwadi Shinoli Belgaon Road SH 180 KM 67/200 to 110/400 Tal Chandgad Dist Kolhapur
2026_PWDRP_1295066_1
E Tender Notice No 01 For 2026-27
Open Tender
Civil Works - Roads
12 days
Chandgad
Please refer Tender documents.
4 documents required · 4 mandatory
₹6,000
₹9.8 L
Office of the Superintending Engineer, PWD Kolhapu
2 Jun 2026
15 Apr 2026
27 Apr 2026
15 Apr 2026
25 Apr 2026
15 Apr 2026
20 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing off unsuitable or excess stuff as directed all sorts of soils. | - | Cubic Metre | - | - |
| 2 | Picking the road surface including sectioning, excetra complete. (Black topped surface) | - | Square Metre | - | - |
| 3 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing to proper grade and camber, applying and brooming requisite type of screening / binding material to fill the interstices of coarse aggregate, watering and compacting with Vibratory roller to the required density. - By Mechanical Means - Grading II Using Screening type-B (11.2 milimetre Aggregate) | - | Cubic Metre | - | - |
| 4 | Providing and constructing 50 milimetre thick modified penetration macadam road surface including all materials, preparing the existing road surface, spreading 40 milimetre stone metal layers 100 percent crusher broken metal with conical crusher plant, heating and spraying the bitumen of of specified grade at the rate of 1.75 kilogram per square metre, spreading 12 milimetre size chips, compacting with three wheel static roller having weight 8 to 10 metric tonnes to achive the desired degree of compaction as per technical specification Clause 506, excetra complete. Excluding picking of existing water bound macadam surface. (Using VG-30 bulk bitumen) | - | Square Metre | - | - |
| 5 | Providing and constructing 50 milimetre thick modified penetration macadam road surface including all materials, preparing the existing road surface, spreading 40 milimetre stone metal layers 100 percent crusher broken metal with conical crusher plant, heating and spraying the bitumen of specified grade at the rate of 1.75 kilogram per square metre, spreading 12 milimetre size chips, compacting with three wheel static roller having weight 8 to 10 metric tonnes to achive the desired degree of compaction as per technical specification Clause 506, excetra complete, including applying tack coat of specified grade bitumen at the rate of 0.30 kilogram per square metre on existing bitumen surface. (Using VG-30 bulk bitumen) | - | Square Metre | - | - |
| 6 | Proving and laying bituminous macadam using crushed aggregates of grading-I premixed with bituminous binder, transported to site with vehicle tracking system, laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction for 80 / 100 milimetre compacted thickness with 3.3 percent specified Bitumen (Asphalt Grade 60/70). - Using 80 tonnes per hour Batch mix type hot mix plant with Supervisory Control and Data Acquisition, Sensor Paver, vibratory roller ( VG-30 bulk bitumen rates are considered to arrive at rates) | - | Cubic Metre | - | - |
| 7 | Open Graded Premix Surfacing- Providing and Laying OGC 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates premixed with bituminous binder transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction but excluding prime / tack and Seal coat. For Bitumen of specified grade--USING Batch mix type hot mix plant with SCADA, Paver and Vibratory roller( over BT Surface) (VG-30 bulk bitumen rates are considered to arrive at rates) including waste plastic to be used in bituminous treatment as per IRC Sp-98 -2013 @ 8% by weight of bitumen | - | Square Metre | - | - |
| 8 | Providing and applying tack coat on the prepared surface, heating by flames in boiler and spraying bitumen with sprayer. On dry / hungry black topped surface at the rate of 3.0 killogram per 10 square metre. (Using VG-30 bulk bitumen) | - | Square Metre | - | - |
| 9 | Providing bituminous type-A liquid seal coat on bituminous surface including supplying all materials and bitumen of VG-30 grade, preparing existing road surface, heating and applying bitumen at the rate of 0.98 kilogram per square metre by mechanical means, spreading chips and rolling by static roller having weight 8 to 10 metric tonne, excetra complete. | - | Square Metre | - | - |
| 10 | Supplying hard murum / kankar at the road site, including conveying and stacking, excetra complete. | - | Cubic Metre | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.32 MB
BOQ_2225202.xls
BOQ • 0.25 MB
01_01.pdf
Tender Documents • 3.72 MB
Download all tender documents and submit your bid