Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical GANGYAL JAMMU | Accepted-Technical found ok |
| 2 | Accepted-Technical 37 B PHASE 3 INDUSTRIAL ESTATE GANGYAL JAMMU | Accepted-Technical found ok |
| 3 | Accepted-Technical INDUSTRIAL ESTATE DIGIANA JAMMU | Accepted-Technical found ok |
| 4 | Accepted-Technical | Accepted-Technical found ok |
Tender Value
Refer Docs
EMD Value
₹3,100
Closing Date
17 Aug 2026, 2:00 pmClosed
XEN MID JAMMU
MID JAMMU
enit 49 dated 07 aug 2026
2026_IFC_319999_1
MID/J/e-NIT/2026-27/49
Open Tender
Repair and Maintenance Works
Item Wise
10 days
gidder gallian
as per tender notice, sbd
8 documents required · 8 mandatory
₹200
Executive Engineer MID JAMMU
₹3,100
24 Aug 2026
7 Aug 2026
18 Aug 2026
7 Aug 2026
17 Aug 2026
7 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1repair to pumping machinery of pumping unit-III and other allied works at LIS GiddarGalian | |||||
| 1.01 | Carriage and shifting of 3 cusecx10meters discharge HC pump, 20 HP motor and foot valve of 8” dia. of unit-III by way of dismantling from base frame and decoupling from motor shifting to nearest road side by head load using manual labour, loading in mechanical transport, carriage to workshop for repairs After complete repairs back shifting of pump to site of installation at Giddar Galian. The job includes labour charges, hire charges of vehicle (to & fro)/carriage, loading and unloading & all the tools and tackles required for executing the works.
Repairs to 3 cusecx10meters discharge pump at workshop by way of extraction of damaged parts. The job involves repair to impeller by way of brazing, turning and finishing to size. Repair to pump shaft by way of re-metaling, turning and finishing to required size. P/F of new gland bushes (GM/SS)-02 Nos., impeller wearing rings-02 Nos., check /lock nuts 02 Nos, bearing No. 6305-02Nos ,new CI gland sets 02 nos and guides 02 nos The job includes replacement of gland packing, greasing, oil packing, and cost of material and labour charges.
Dismantling of the damaged 20 HP motor and extracting the rotor from stator at workshop. Repairs to rotor by way of rebuilding, turning of the rotor shaft and finishing to bearing size, making new keyway for coupling, P/F of new bearings-6309, 6310 and sleeves (DE & NDE). P/F of bearing end cover plate 01No. Complete varnishing of motor and the keeping the stator assembly on the oven to dry it to make it moisture free. Complete greasing of the bearings and assembling the rotor and stator. Complete job includes cost of material, labour charges and testing of motor on no load.
Repair to coupling pulley by way of re-metaling, turning and machining the worn out portion of coupling pulley. Providing and fitting of new coupling bolts, nuts and rubber bushes of appropriate size after extracting the old damaged worn out coupling bolts. The job involves boring of coupling pulley and cutting of key ways as per requirement. P/F of cotter set as per sample for fixing of coupling pulley on the shaft of pump and motor.The job includes cost of material, hire charges of tools and tackles required for the job including labour and carriage charges.Installation of the repaired pump on base frame by p/f of new required nuts, bolts/ studs, with proper greasing of motor and alignment after coupling it with motor by providing and fitting of new coupling nuts and bolts along with rubber bushes. The job also involves aligning of suction and delivery end and fitting them with pump body by p/f of rubber sheet joint along with new nuts and bolts Complete job includes cost of material, labour charges and testing on full load.
Repair to foot valve of 8” f of unit No III by way of Dismantling of suction line and extracting the suction pipe along with foot valve from the canal dismantling the foot valve at site, providing and fitting of leather sheet cut to size along new nuts and bolts of required size. Fitting the foot valve with suction pipe by P/F of rubber sheet joint along with new nuts and bolts of required size. Lowering down the suction pipe with foot valves in the canal and the aligning the suction pipe with other portion of suction and fitting it by P/F of rubber sheet joints along with new nuts and bolts at site. Also repair to auto control panel/ starter of unit No III by way of providing and fitting of current overload relay, on/off relay assembly and thermal relay after extracting out the old damaged ones at LIS Giddar Galian. Complete job includes cost of material including rebate on old material, labour charges, charges for tools and tackles required for execution of work at LIS Giddar Galian. | - | Job | - | - |
| 1.02 | Rebate on Old Parts | - | Job | - | - |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
SBD49.pdf
Additional Documents • 0.59 MB
BOQ_1061936.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .