Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 LAccepted-AOC | L1 | Accepted-AOC ok | |
| 2 | L2₹5.7 L+₹952.32 (0.17%)Rejected-AOC | L2 | Rejected-AOC Reject |
| Sl No | Description | Qty | Unit | K bose L2 | MUTHULAKSHMI L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation of pipe line trench and depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, black cotton soil, hard red earth shales murram ordinary gravel stony earth and earth mixed with 50% of a fair size boulders and hard gravelly soil including refilling the trenches with excavated earth etc., Complete complying with standard specification. | 18 | Cum | 200 ₹3,600 | 198 ₹3,564 Lowest |
| 2.00 | Earth work excavation of pipe line trench and depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, black cotton soil, hard red earth shales murram ordinary gravel stony earth and earth mixed with 50% of a fair size boulders and hard gravelly soil including refilling the trenches with excavated earth etc., Complete complying with standard specification. | 2 | Cum | 310 ₹620 Lowest | 310 ₹620 Lowest |
| 3.00 | Earth work excavation of pipe line trench and depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, black cotton soil, hard red earth shales murram ordinary gravel stony earth and earth mixed with 50% of a fair size boulders and hard gravelly soil including refilling the trenches with excavated earth etc., Complete complying with standard specification. | 2.5 | Cum | 5,630 ₹14,075 | 5,628 ₹14,070 Lowest |
| 4.00 | Earth work excavation of pipe line trench and depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, black cotton soil, hard red earth shales murram ordinary gravel stony earth and earth mixed with 50% of a fair size boulders and hard gravelly soil including refilling the trenches with excavated earth etc., Complete complying with standard specification. | 305.42 | Sqm | 711 ₹2,17,153.62 | 710 ₹2,16,848.2 Lowest |
| 5.00 | Earth work excavation of pipe line trench and depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, black cotton soil, hard red earth shales murram ordinary gravel stony earth and earth mixed with 50% of a fair size boulders and hard gravelly soil including refilling the trenches with excavated earth etc., Complete complying with standard specification. | 43 | Cum | 7,065 ₹3,03,795 | 7,060 ₹3,03,580 Lowest |
| 6.00 | Earth work excavation of pipe line trench and depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, black cotton soil, hard red earth shales murram ordinary gravel stony earth and earth mixed with 50% of a fair size boulders and hard gravelly soil including refilling the trenches with excavated earth etc., Complete complying with standard specification. | 1.5 | Cum | 8,210 ₹12,315 | 8,209 ₹12,313.5 Lowest |
| 7.00 | Supplying and delivery of 90mm HDPE (PN6) pipe including all cost and coveiyance chagres etc., Complete complying with standard specification. | 180 | Kgs | 95 ₹17,100 | 93 ₹16,740 Lowest |
| 8.00 | Lowering of HDPE Pipe with specials into trench to require slope, gradient, alignment and testing to required pressure including cost and conveyance of all materials and labour charges to site etc., complete | 7.35 | Sqm | 310 ₹2,278.5 | 306 ₹2,249.1 Lowest |
Tender Value
₹7 L
EMD Value
₹7,000
Closing Date
16 Oct 2025, 3:00 pmClosed
Executive officer, Mallankinaru TP
15, West car street, Mallankinaru
Construction of Small Culvert at ward No.7 Anna nagar in Mallankinaru Town Panchayat.
2025_DTP_604873_2
Roc.No.47/2025
Open Tender
Civil Works
Works
90 days
Mallankinaru
Class IV
2 documents required · 2 mandatory
₹0
₹7,000
16 Oct 2025
6 Oct 2025
16 Oct 2025
6 Oct 2025
16 Oct 2025
6 Oct 2025
Amount
Earth work excavation of pipe line trench and depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, black cotton soil, hard red earth shales murram ordinary gravel stony earth and earth mixed with 50% of a fair size boulders and hard gravelly soil including refilling the trenches with excavated earth etc., Complete complying with standard specification.
Earth work excavation of pipe line trench and depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, black cotton soil, hard red earth shales murram ordinary gravel stony earth and earth mixed with 50% of a fair size boulders and hard gravelly soil including refilling the trenches with excavated earth etc., Complete complying with standard specification.
Earth work excavation of pipe line trench and depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, black cotton soil, hard red earth shales murram ordinary gravel stony earth and earth mixed with 50% of a fair size boulders and hard gravelly soil including refilling the trenches with excavated earth etc., Complete complying with standard specification.
Earth work excavation of pipe line trench and depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, black cotton soil, hard red earth shales murram ordinary gravel stony earth and earth mixed with 50% of a fair size boulders and hard gravelly soil including refilling the trenches with excavated earth etc., Complete complying with standard specification.
Earth work excavation of pipe line trench and depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, black cotton soil, hard red earth shales murram ordinary gravel stony earth and earth mixed with 50% of a fair size boulders and hard gravelly soil including refilling the trenches with excavated earth etc., Complete complying with standard specification.
Earth work excavation of pipe line trench and depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, black cotton soil, hard red earth shales murram ordinary gravel stony earth and earth mixed with 50% of a fair size boulders and hard gravelly soil including refilling the trenches with excavated earth etc., Complete complying with standard specification.
Supplying and delivery of 90mm HDPE (PN6) pipe including all cost and coveiyance chagres etc., Complete complying with standard specification.
Lowering of HDPE Pipe with specials into trench to require slope, gradient, alignment and testing to required pressure including cost and conveyance of all materials and labour charges to site etc., complete
K bose (BID ID -1489474)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .