Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹69,750.81Admitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹72,482.34+₹2,731.53 (3.92%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹73,722.18+₹3,971.37 (5.69%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹82,333.27+₹12,582.46 (18.0%)Admitted-Finance | L4 | Admitted-Finance |
Tender Value
₹98,000
EMD Value
₹1,960
Closing Date
18 Jul 2026, 4:00 pmClosed
XEN REW Kathua
XEN REW Kathua
Construction of Lane from the H/o Dimple Kumar upto Tanki Bawa Brifa Nath Sohal Pyt Kootah Block Hiranagar
2026_RDPR_315462_7
e-NIT No.99/REW/K of 2026-27 Dated 10/07/2026
Open Tender
Civil Works
Percentage
90 days
Hiranagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹1,960
4 Aug 2026
10 Jul 2026
18 Jul 2026
10 Jul 2026
18 Jul 2026
10 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means over areas (Exceeding 30 em and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed excavated earth upto 1 mtr from 'cutting edge, disposed earth to be levelled and neatly dressed in : | 4.3 | m3 | 479.3 | ₹2,060.99 |
| 2 | Providing and laying in position 1:5:10mix in 40mm size mix excluding the cost of centring and shuttering- All work upto plinth level. | 2.18 | m3 | 4,826.5 | ₹10,521.77 |
| 3 | Providing and laying in position cement concrete of Mix 1:3:6 excluding the cost of centring and shuttering- All work upto plinth level. | 9 | m3 | 5,733.6 | ₹51,602.4 |
| 4 | Supply and Dumping of stones | 3.87 | m3 | 937.4 | ₹3,627.74 |
| 5 | 12mm Cement plaster of mix in 1:4 mix | 12.55 | m2 | 283.8 | ₹3,561.69 |
| 6 | Centering and Shuttering including strutting, propping etc and removal of form for - Foundations: footings, bases of columns etc. for mass concrete. | 44.61 | m2 | 286.35 | ₹12,774.07 |
| 7 | PCC flooring in M15 flooring 1:2:4 ( 1 cement: 2 coarse sand :4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry, excluding the cost of nosing of steps etc. complete. | 2.09 | m2 | 562.15 | ₹1,174.89 |
| 8 | Carriages of sand + Bajri for 10 kms | 17.27 | m3 | 279.04 | ₹4,819.02 |
| 9 | Carriages of sand + Bajri for 100mtrs head load | 17.27 | m3 | 244.36 | ₹4,220.1 |
| 10 | Add cost of sign board incld painting and writing | 1 | nos | 2,500 | ₹2,500 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.64 MB
BOQ_1023454.xls
BOQ • 0.29 MB
Cor99.pdf
PDF • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .