| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.9 LAccepted-AOC 144 A THOTTIPALAYAM MUTHUR ERODE 638 105 | TIRUPPUR | TAMIL NADU | 638105 | ₹14.9 L | L1 | Accepted-AOC Work order issued |
| 2 | L2₹15.7 LRejected-Finance FIRST FLOOR 360 1 GREEN CITY KONDARASAMPALAYAM CHITHRAVUTHANPALAYAM DHARAPURAM TK TIRUPPUR 638657 | TIRUPPUR | TAMIL NADU | 638657 | ₹15.7 L | L2 | Rejected-Finance Amount quoted is higher. so rejecting price bid |
| 3 | L3₹16.7 LRejected-Finance | ₹16.7 L | L3 | Rejected-Finance Amount quoted is higher. so rejecting price bid |
| Sl No | Description | Qty | Unit | VITHUN ASSOCIATES L3 | DIVYA DARSHANI AND CO L1 | SRI SAKTHIVEL AND CO L2 |
|---|---|---|---|---|---|---|
| 1.00 | Supply and Delivery of 90 mm PVC pipes using 6 kg/cm2 including cost and conveyance of all materials to site. | 2,950 | M | 145 ₹4.3 L | 133.5 ₹3.9 L | 135 ₹4.0 L |
| 2.00 | Supply and Delivery of 63 mm PVC pipes using 6 kg/cm2 including cost and conveyance of all materials to site. | 2,660 | M | 75 ₹2.0 L | 69.4 ₹1.8 L | 70 ₹1.9 L |
| 3.00 | Supply and Delivery of 80mm dia GI PIPES ( MEDIUM) AS PER ISI 1239/PART I/2004 including cost and conveyance of all materials to site. | 30 | M | 750 ₹22,500 | 691 ₹20,730 | 710 ₹21,300 |
| 4.00 | Supply and Delivery of 50mm dia GI PIPES ( MEDIUM) AS PER ISI 1239/PART I/2004 including cost and conveyance of all materials to site. | 30 | M | 475 ₹14,250 | 436 ₹13,080 | 449 ₹13,470 |
| 5.00 | Supply and delivery, fixing of 5000 liter HDPE tank as per IS 12701/1996 including loading and un loading, transporting and labour charges including all charges | 1 | No | 46,050 ₹46,050 | 43,286 ₹43,286 | 43,563 ₹43,563 |
| 6.00 | Earth work excavation and depositing on bank with initial lead of 10 meters and initial lift of 2 meters in hard stiff block cotton hard red earth murrains, gravel, stony earth mixed with small size boulders and hard gravel soil etc., complete as per standard specification (ss 20B) | 2,275 | M3 | 265 ₹6.0 L | 231 ₹5.3 L | 250 ₹5.7 L |
| 7.00 | Plain Cement Concrete 1:4:8 mix (One Cement and Four Sand and eight aggregate) including cost and using 40mm metal including Cost and Conveyance of all materials to site and all labour charges etc., complete complying with standard specification. | 0.5 | M3 | 5,425 ₹2,712.50 | 4,700 ₹2,350 | 5,132 ₹2,566 |
| 8.00 | Supplying and erecting centering to sides and soffits including supports and strutting with necessary including cost and conveyance of all materials to site. complete as per standard specification | 24 | M2 | 530 ₹12,720 | 436 ₹10,464 | 497 ₹11,928 |
| 9.00 | Plain Cement Concrete 1:3:6 Mix (one part cement, three part sand and six part of aggrigate) 20 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. | 12 | M3 | 6,210 ₹74,520 | 5,407 ₹64,884 | 5,873 ₹70,476 |
| 10.00Lowering PVC rigid pipes and specials to trench and laying to proper gradient and alignment jointing with PVC couplers with cement paste and testing to the required pressure including conveyance of water for filling during testing etc., complete complying with standard specification. | ||||||
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
10 Feb 2026, 3:00 pmClosed
Executive Officer, Muthur TP
16, Kangeyam Road, Muthur
Replacement Of Cauvery Main Pipe line and Bore at Udaiyam Road From Malaiyathapalayam Four Road In Muthur Town Panchayat.
2026_DTP_653258_1
460/2025/Udaiyam Road
Open Tender
Pipe Laying Works
90 days
Muthur TP
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹40,000
25 Mar 2026
9 Feb 2026
10 Feb 2026
9 Feb 2026
10 Feb 2026
9 Feb 2026
Supply and Delivery of 90 mm PVC pipes using 6 kg/cm2 including cost and conveyance of all materials to site.
Supply and Delivery of 63 mm PVC pipes using 6 kg/cm2 including cost and conveyance of all materials to site.
Supply and Delivery of 80mm dia GI PIPES ( MEDIUM) AS PER ISI 1239/PART I/2004 including cost and conveyance of all materials to site.
Supply and Delivery of 50mm dia GI PIPES ( MEDIUM) AS PER ISI 1239/PART I/2004 including cost and conveyance of all materials to site.
Supply and delivery, fixing of 5000 liter HDPE tank as per IS 12701/1996 including loading and un loading, transporting and labour charges including all charges
Earth work excavation and depositing on bank with initial lead of 10 meters and initial lift of 2 meters in hard stiff block cotton hard red earth murrains, gravel, stony earth mixed with small size boulders and hard gravel soil etc., complete as per standard specification (ss 20B)
Plain Cement Concrete 1:4:8 mix (One Cement and Four Sand and eight aggregate) including cost and using 40mm metal including Cost and Conveyance of all materials to site and all labour charges etc., complete complying with standard specification.
Supplying and erecting centering to sides and soffits including supports and strutting with necessary including cost and conveyance of all materials to site. complete as per standard specification
Plain Cement Concrete 1:3:6 Mix (one part cement, three part sand and six part of aggrigate) 20 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site.
Lowering PVC rigid pipes and specials to trench and laying to proper gradient and alignment jointing with PVC couplers with cement paste and testing to the required pressure including conveyance of water for filling during testing etc., complete complying with standard specification.
2" PVC Pipe
2" GI Pipe
3" PVC Pipe
3" GI Pipe
Refilling with excavated excess earth work including all labour charges etc., complete complying with standard specification.
Exterior Emulsion paint Two coats with good quality of approved Emulsion paint including cost of all materials to site and all labour charges for mixing applying and proper curring etc., Complete as per Standard Specifications
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.76 MB
Tendernotice20udaiyamrd.pdf
Tender Documents • 0.74 MB
BOQ_783334.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid