Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.2 LAdmitted-Finance | -9.27% | ₹1.2 L | L1 | Admitted-Finance |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
16 Jun 2026, 6:00 pmClosed
EXCUTIVE OFFICER MUNICIPAL BOARD KUSHALGARH
EXCUTIVE OFFICER MUNICIPAL BOARD KUSHALGARH
Muncipal Board Kushalgarh Plika Building Repair and Color Work Yearly Contrac
2026_DLB_565298_1
EXCUTIVE OFFICER KUSHALGARH/01/2026-27/04
Open Tender
Civil Works
Percentage
365 days
EXCUTIVE OFFICER MUNICIPAL BOARD KUSHALGARH
Muncipal Board Kushalgarh Plika Building Repair and Color Work Yearly Contrac
2 documents required · 2 mandatory
₹500
EXCUTIVE OFFICER MUNICIPAL BOARD KUSHALGARH
₹40,000
Yes
1 Jul 2026
5 Jun 2026
19 Jun 2026
5 Jun 2026
16 Jun 2026
5 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. | 1 | Cum | - | - |
| 2 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-incharge In cement mortar | 1 | Cum | - | - |
| 3 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. For thickness of tiles 10 mm to 25 mm | 1 | Sqm | - | - |
| 4 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead : Of area beyond 3 sq. metres | 1 | Each | - | - |
| 5 | Dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. | 1 | Sqm | - | - |
| 6 | Carriage of materials by manual labour including loading, unloading and stacking for lead less than 0.5 Km Earth | 1 | Cum | - | - |
| 7 | Earth filling with available surplus soil excavated from foundations and taken only from outside of building plinth in layers not exceeding 20cm in depth, consolidating each deposited layer including ramming and watering and consolidation with lead up to 50 m and lift upto 1.5 m. | 1 | Cum | - | - |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size). | 1 | Cum | - | - |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 1 | Cum | - | - |
| 10 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). | 1 | Cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
BOQ_1006071.xls
BOQ • 0.31 MB
doc.pdf
PDF • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .