| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹4.7 LAccepted-AOC | L-1 | Accepted-AOC Work Awarded to L1 bidder. | |
| 2 | Rejected-Technical KHALARI RANCHI JHARKHAND PIN 829205 | RANCHI | RANCHI | JHARKHAND | 829205 | - | Rejected-Technical Disqualified due to Non-compliance of Confirmatory Documents. | |
| 3 | Rejected-Technical AT PO DAKRA KHALARI DIST RANCHI JHARKHAND PIN 829210 | RANCHI | JHARKHAND | 829210 | - | Rejected-Technical Disqualified due to Non-compliance of Confirmatory Documents. |
Tender Value
₹4.3 L
EMD Value
₹5,500
Closing Date
21 May 2025, 9:00 amClosed
Project Engineer (EnM), Ashok
Project Engineer (EnM), Ashok
Repairing /reconditioning of 04Nos NFLP Starter, 3.3 KV Grade for Controlling of different Pump-motor Sets installed in different places in Mines under Ashok OCP, Piparwar Area.
2025_CCL_335240_1
PO(AK)/PE(EnM)/e-NIT/25-26/13
Open Tender
Electrical and Maintenance Works
Item Rate
15 days
Ashok OCP, Piparwar Area Chatra, Jharkhand-829201
2 documents required · 2 mandatory
₹5,500
7 Jul 2025
10 May 2025
22 May 2025
11 May 2025
21 May 2025
11 May 2025
11 May 2025 - 18 May 2025
Amount
Supply of HT Control Fuse
Supply of Bushing insulator with stud
Supply of 72 SQMM Ammeter Scale
Supply of red push button 22.5mm dia with 01NO + 01NC element
Supply of Indicating Lamp 220 V , GYB
Supply of isolator limit switch
Supply of Motor Protection Relay to prevent 3 phase over current, under current, phase loss, phase imbalance, phase reversal, locked rotor; rated Voltage 110V, Rated current 0.5-60A,110 V to 220 V
Supply of Resin cast CT 100/5A
Supply of Post insulator
Supply of Holding/closing coil 220V
Supply of Auxiliary Contractor 2 NO+ 2 NC.220 V
Repairing of Isolator Set with required materials (a) Repairing of operating Mechanism -01 No (b) Repairing of moving Contact Set- 03 No (c) Repairing of Fixed Contact- 03 No
Checking & fixing of Vacuums interrupted tube with required materials
Complete denting and Welding of Starter with providing Locking System
Complete wiring with ferrule, Lugs Tapes etc& All circuit Checking
Complete painting of Starter in & out
Labour Cost on Supplying Item Si No- 01 to 11 X @15%
Total impact of GST for the purpose of CTC
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .