Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.1 LAccepted-AOC NEAR JAMIA MASJID HOSPITAL ROAD UDHAMPUR J K 182101 | UDHAMPUR | JAMMU AND KASHMIR | 182101 | L1 | Accepted-AOC Lowest and reasonable | |
| 2 | L2₹15.9 L+₹3.7 L (30.1%)Rejected-Finance B 56 LANE NO 4A SECTOR 7 VASHNAVI ENCLAVE CHANNI HIMAT JAMMU 180015 | JAMMU | JAMMU AND KASHMIR | 180015 | L2 | Rejected-Finance Other than Lowest | |
| 3 | L3₹19.0 L+₹6.7 L (54.9%)Rejected-Finance 88 197 B CHAMAN GANJ KANPUR 208001 | KANPUR | KANPUR NAGAR | UTTAR PRADESH | 208001 | L3 | Rejected-Finance Other than Lowest |
Tender Value
₹22.5 L
EMD Value
₹45,000
Closing Date
1 Jul 2024, 6:00 pmClosed
HQ CWE (AF) Jammu
Headquarters, CWE (AF) Jammu Near Gurdwara Sahib and Mandir Airforce Station Satwari, Jammu Pin 180 003
REPAIR REPLACEMENT MAINTAINANCE OF CENTRAL AC PLANT (V-5 LAB, I SECTION,BASE SAFETY, NACC,WSA,NEW ATC) AND REPAIR REPLACEMENT SERVICING TO AHU, COOLING TOWER, CONTROL PANEL,DE HUMIDIFIER SYSTEM, HOT WATER GENERATOR ALONG WITH CERTAIN ALLIED WORKS
2024_MES_650969_2
CWEAFJ-39/2023-24
Open Tender
Civil Works
Item Rate
365 days
GE (AF) Udhampur
All as Per Tender Documents
9 documents required · 9 mandatory
₹500
GE (AF) Udhampur
₹45,000
Yes
19 Sept 2024
10 Jun 2024
3 Jul 2024
10 Jun 2024
1 Jul 2024
17 Jun 2024
Amount
M &L for Maintenance / servicing / repairing/ cleaning /welding works for AC plant package type capacity 3X10 = 30 TR package plant, condenser Air cooled type-06 Nos, Compressor 5.0 TR -06 Nos, Thermometer / pressure gauge/ complete duct / AHU package complete system, Connection tubes, PCB & sensor system, humidifier system (heating)/ hot water generator and the following works/maintenance carried out this scope work & and replacement of unsv parts paid separately mentioned & complete all as specified and directed Engr-in-Charge ( IT Section)
M & L for Maintenance / servicing / repairing/ cleaning / welding works/ for AC plant package type 11 x 3= 33 TR , condenser water cooled type-06 Nos, Compressor-06 Nos, Mono block pump 2 HP-02 Nos , Cooling tower motor 2 HP-01 No, Thermometer,pressure gauge,complete duct / AHU package complete system, Connection tubes, PCB & sensor system, humidifier system (hot water generator) and the following works/maintenance carried out this scope work & any other Major parts changed paid seperatly mentioned & complete all as specified and directed Engr-in-Charge( Base Safty)
M & L for Maintenance / servicing / repairing/ cleaning / welding works / for AC plant Cheller type 26 x 3= 78 TR plant, condenser water cooled type-06 Nos, Compressor-06 Nos, Mono block pump 2 HP-02 Nos , Mono block pump 5 HP-4Nos, Cooling tower motor 3 HP-01 No, Thermometer,pressure gauge,complete duct / AHU package complete system, Connection tubes, PCB & sensor system, humidifier system (hot water generator) and the following works/maintenance carried out this scope work & any other Major parts changed paid seperatly mentioned & complete all as specified and directed Engr-in-Charge (NACC Room) .
M&L for Maintenance / servicing / repairing/ cleaning / welding works/ for AC plant Cheller type 13 x 3= 39 TR plant, condenser water cooled type-06 Nos, Compressor-06 Nos, Mono block pump 2 HP-02 Nos , Mono block pump 5 HP-4Nos, Cooling tower motor 3 HP-01 No, Thermometer,pressure gauge,complete duct / AHU package complete system, Connection tubes, PCB & sensor system, humidifier system (hot water generator) and the following works/maintenance carried out this scope work & any other Major parts changed paid seperatly mentioned & complete all as specified and directed Engr-in-Charge (V-5 Lab)
M&L for Maintenance / servicing / repairing/ cleaning / welding works/ for AC plant Cheller type 39 x 3= 117 TR plant, condenser water cooled type-9 Nos, Compressor-9 Nos, Mono block pump 10 HP-04 Nos , Mono block pump 5 HP-2Nos, Cooling tower motor 5 HP-01 No, Thermometer,pressure gauge,complete duct / AHU package complete system, Connection tubes, PCB & sensor system, humidifier system (hot water generator) and the following works/maintenance carried out this scope work & any other Major parts changed paid seperatly mentioned & complete all as specified and directed Engr-in-Charge (WSA)
M&L for Routine/ Maint/ servicing/ repairing/ cleaning/welding works/for AC plant cheller type 52x3=156 TR plant, condenser water cooled type-12 Nos, compressor-12 Nos,Mono block pump 10HP-04 Nos, mono block pump 5HP-02 Nos, cooling tower motor 5 HP -01 No, Thermometer, pressure guage/ complete duct/ AHU package complete system, Connection tubes, PCB & sensor system, humidifier system (hot water generator) and the following works/ maintenance carried out this scope work and any other major parts changed paid separately mentioned and complete all as specified and directed by Engr-in-Charge (New ATC bldg). (Note :1 :- Activities in srl item no. 01 to 06 shall be carried out in srl item No (6.01 to 6.29)
(i) Above all attending to complaint/break down calls when called upon. Repair/replacement of microprocessor control if installed. Reporting the healthiness of the plant and suggesting improvements if any)
(ii)The work will be carried out either by Voltas personnel or its authorized sub- contractors as directed by Voltas.
(iii) This scheme does not cover damage to equipment / ancillaries or failure due to environmental conditions and due to contaminated / hard water, there itmes measured and paid separatly under respetive schedule.
(iv)Each plant will be tested in the presence of GE, Engineer-in- Charge and ref of the user unit.
(v) The test results shall be recorded and shall be preserved duly signed by the contractor, GE, Engineer-in- Charge and ref of the user unit.
(vi)The contractor shall get the sample of all the materials approved from Engr-in-charge.
(vii)The material procured and brought at site by the contractor shall be got approved from Engr-in- Charge.
(viii)Check the earth connection and fuses.
(ix) Clean the condenser and other equipments.
(x)Clean the controls.
(xi)Check starting and running current and voltage while running.
(xii)Check the insulation resistance valve.
(xiii)Check leak LP and HP cut-outs i.e. 5 lbs/inch2 for LP and 150 lbs/inch2 for HP.
(xiv)Check expansion valves.
(xv) Check for entire system with the help of water & soap.
(xvi)Clean the drip tray with water.
(xvii) Check the condition of blower fans, shafts and its direction of rotation.
(xviii) Check the ducting condition.
(xix) Check the working of the plants and limits of vibration and noise
(xxx)Check suction and delivery of the compressor and its efficiency.
(xxi)Dismantle the weather make chamber by removing duct connections and opening the return air box, clean the evaporator coil, drip tray, ducting and repair the return air box (if required) , paint the system and re-install the same.
(xxii)Check the service valves for wear.
(xxiii)Clean the contacts of LP/HP switches.
(xxiv) Check and adjust the alignment of belts and their tension.
(xxv) Check the wiring and all the connections including meggering.
(xxvi) Check thermostatic switch and clean the contacts
(xxvii) water cooled system/water line clening & paintng incl cooling tower
(xxviii)All pump any size overhuling and repairing /replacement of unserviceable gland and cupling complete
(xxix) Cooling tower cleaning with Scrapper
Taking out residual refrigerant gas from AC plant 10x 3= 30 TR into empty cylinder of the following capacity AC plant and depositing the same in AGE E/M store yard for further reuse complete of the under mention AC plant all as specified and directed by Engr-In-Charge, location-IT section (Note:- (i) Empty cylinder will be arranged temporary by the contractor (ii) All accessories and T&P require for transfer of gas into cylinder will be arrangement by the contractor at his own cost)
All as above srl Items No.07 but 11x 3= 33TR, (location-Base safety)
All as above srl Items No.07 but 26x 3= 78 TR, (location-NACC)
All as above srl Items No.07 but 13x 3= 39TR, (location-V-5 lab)
All as above srl Items No.07 but 39x 3= 117TR, (location-WSA)
All as above srl Items No.07 but 48x 3= 144TR, (location-New ATC)
Carrying out pressure leak testing by Nitrogen gas of the system of AC plant capacity 10 x3 = 30TR (location-IT section) for leak proof valve joints seal & other connected control etc including identifying & rectifing of the leaks defects ( if any ) and maintaining constant pressure complete all as specified and directed by Engr-In-Charge. (Note:- the arrangement of T&P and Nitrogen gas shall be contractor responsibility)
All as above srl Items No.13 but 11 x 3= 33 TR, (location-Base safety)
All as above srl Items No.13 but 26 x 3= 78 TR, (location-NACC)
All as above srl Items No.13 but 13 x 3= 39 TR, (location-V-5 lab)
All as above srl Items No.13 but 39 x 3= 117 TR, (location-WSA)
All as above srl Items No.13 but 48 x 3= 144 TR, (location-New ATC)
M& L for Cleaning of AC plants 10x 3= 30 TR cooling coil after dismantling front portion of AHU by applying high air pressure followed by descaling solution and then washing with water pressure using jet pump and reassembling thereafter complete all as specified and directed by Engr-In-Charge Location IT Section. (Note:- Including servicing of AC duct cleaning etc setting of grills louvers and positions of proportioning dampers & also minor repair to duct insulation complete for the following AC plant)
All as above srl Items No.19 but 11 x 3= 33 TR, (location-Base safety)
All as above srl Items No.19 but 26 x 3= 78 TR, (location-NACC)
All as above srl Items No.19 but 13 x 3= 39 TR, (location-V-5 lab)
All as above srl Items No.19 but 39 x 3= 117 TR, (location-WSA)
All as above srl Items No.19 but 48 x 3= 144 TR, (location-New ATC)
M&L R-22/407 & 410 Gas Charging- Ductable& Packaged include welding work
M&L N2 Gas For Flushing, leakage testing & Vaccummissing
M&L Motorized Dampers for Ductable AC
M&L Motorized Dampers for Packaged AC
M&L the following spare parts of central heating plants (IT section, V-5 lab, NACC, WSA, New ATC and base safety) complete all as specified and directed Engr-in- charge.
M & L for PLC circuit chiler AC plant as per existing size
M&L PCB circuit Packaged type AC plant as per existing size
M&L Blower motor IDU Packaged Acplant cap 2 HP RPM 440 V
M&L Condensor fan motor ODU Ductable & Packged AC
M&L wire mess air filter AHU ductable AC plant as per existing size
M&L Air filter - Packaged AC plant as per existing size
M&L single phase preventer as per existing size
M&L all powder coated Grill as per exising size
M&L all powder coated Diffusers as per existing size
M&L HP-LP Switch Ductable AC plant as per existing size
M&L HP-LP Switch Packaged AC plant as per existing size
M&L Sensor for ductable AC plant as per existing size
M&L Sensor for Packaged AC pla nt as per existing size
M&L Expension valve 13.5 TR as per existing size
M&L fan assy for delta coolig tower of 30 TR to 156 TR AC plant
M&L V- Belt B-67
M&L V- Belt B-68
M&L V- Belt B-70
M&L V- Belt B-67124
Supply and fixing submersible cable copper 10 sqmm 3 core flat type double coated PVC insulated multi stranded FRLSH, IS marked complete all as direction Engr-in-Charge. Make :- (Finolex/ Havells/ RR cable/KEI)
Supply and fixing submersible cable copper 6 sqmm 3 core flat type double coated PVC insulated multi stranded FRLSH, IS marked complete all as direction Engr-in-Charge. Make :- (Finolex/ Havells/ RR cable/KEI)
M&L Expension valve 5.5 TR as per existing size
M&L foam insulation Nitrile rubber 13 mm as per existing size
M&L Canvass connection fire proof as per existing size
M&L any size copper piping, foam insulation, supporters, nut bolts, painting of pipe (required) angle bracket complete.
M&L MCCB 4 Pole, Microprocessor Based 630 A, Breaking capacity 36 KA, 415 V, 50 Hz with OL, SC, protection, complete all specified and directed.
M&L MCCB 4 Pole, Microprocessor Based 250A, Breaking capacity 36 KA, 415 V, 50 Hz with OL, SC, protection, complete all specified and directed.
M&L MCCB 4 Pole, Microprocessor Based 100 A, Breaking capacity 36 KA, 415 V, 50 Hz with OL, SC, protection, complete all specified and directed.
M&L MCCB 4 Pole, Microprocessor Based 160A, Breaking capacity 36 KA, 415 V, 50 Hz with OL, SC, protection,complete all specified and directed.
M&L Heating element 3000 watts for hot water generator as per existing size
M&L Power contactor 32 Amps 3 pole as per sample
M&L Power contactor 40 Amps 3 pole as per sample
M&L over load relay 10-14 Amps
M&L over load relay 13-22 Amps
M&L water pressure meter /guage as per existing model
M&L temperature meter /guage as per existing model
M&L condenser safety valve
M&L GM gate Valve glope type 20mm
Supply and fixing PVC Fill media fan AHU of control A.C. Plant with high quality PVC Media used for waste water treatment appilcation repairing high surface area for trickling filters fixed filim Anaerobic digestor contact filtes including very high surface area ,chemical and weather resitant double edge folded ,simple supporting easy to install etc all as specifed and as directed by engineer -in -charge Make WTT/MM Aqua,Greentack Engineers ,Disha cooling system
M&L for taking down/ dismentling the old/ UNSV duct of central AC plant and M&L to assy / eroction of GI sheet with C&SS , rectangular/ boxed, incls all accessories such as corner, cleat, carrage bolt, gasket and appropriate sealant on longitudinal joints etc complete of size 26 gauge. In laid Wool installation not less than 30 mm thick over all surrounding the duct and 15 mm thick cement randering work over / around the complete duct with chicken wire mess of suitable size all is specified and directed. Note:- the inner size of duct is not less than existing.
M&L of lagging to chiler water pipes used in AC plant plumbing all rund with 25mm thick foam insulation bounded mineral wool pre sections SNAP ON pipe sections of dencity 144 Kg/cum conforming to IS-9842 for 120 mm dia MS pipe including alluminium foil of 01 mm complete all as specified and directed.
Supply and Replacement of Cast iron Butterfly Valve , SS dise with hand lever operated, lining test pressure PN 1.6 ISI marked of size 80/100/150 mm dia including welding work all fittings such as nuts , bolts, washers and rubber gasket etc complete in all respect all as specified.
M&L for repairing/ servicing and rewinding of motor 3 phase 400-440 volt complete, disconnecting the electric supply, removing of pully and fan and opening of both end covers, taking out bearings and rotor, checking of rotor field winding, quality copper winding wire insulating material, varnishing binding of winding etc encluding re-assembling, replacing rusted nuts, bolts, washer, checking and adjusting the alignment, connecting electric connection complete all as specified and directed by Engr-in-Charge for the following
Electric motor 3 phase 2 HP of AC plant
Electric motor 3 phase 5 HP of AC plant
Electric motor 3 phase 10 HP of AC plant
Discription all as per above srl item No 35 here-in before, but overhalling of monoblock pump, including removing of old gland packing, gland bolt, gland cup, ball b earing and supply and fixing of new gland packing, ball bearing, gland cup, gland bolt , cleaning of impeller/ replacement of impeller all as directed for the following:-
Monoblock pumping set 2 HP
Monoblock pumping set 5 HP
Monoblock pumping set 10 HP
ANIKET TRADERS
ASIA BUILDER
Bidder Name
ANIKET TRADERS
CITY TOP ELECTRICAL WORKS
ASIA BUILDER
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .