| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.5 CrAdmitted-Finance | -31.50% | ₹2.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.8 CrAdmitted-Finance ADARSH NAGAR HIRAPUR DHANBAD | DHANBAD | JHARKHAND | 818142 | -24.55% | ₹2.8 Cr | L2 | Admitted-Finance |
| 3 | L3₹3.2 CrAdmitted-Finance BHAGALPUR | BIHAR | 812001 | -13.50% | ₹3.2 Cr | L3 | Admitted-Finance |
| 4 | L4₹3.7 CrAdmitted-Finance | -0.01% | ₹3.7 Cr | L4 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical Not responded in confirmatory cycle |
Tender Value
₹3.7 Cr
EMD Value
₹4.6 L
Closing Date
15 Jan 2026, 6:55 pmClosed
AE(C), RJML AREA
AREA OFFICE RAJMAHAL AREA, DHANKUNDA
Construction of PCC Main Road from marriage hall 2 to sector-K (Gangi tola), Primary school to main entrance gate-02 and around sector-B, E and H at Dumaria rehab site under Rajmahal Area.
2025_ECL_350372_1
ECL/RJML/AGM/AE(C)/ e-Ten/25-26/400 Dt-31.12.2025
Open Tender
Civil Works - Roads
150 days
Dumaria rehab site
Please refer Tender documents.
5 documents required · 5 mandatory
₹4.6 L
18 Mar 2026
31 Dec 2025
17 Jan 2026
31 Dec 2025
15 Jan 2026
31 Dec 2025
31 Dec 2025 - 8 Jan 2026
Item Description/ Heading
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.
Granular Sub-Base with Graded Material (Table:-100-1): Plant Mix Method: Construction of granular sub-base by providing close graded material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401. For Grading II Material
Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavation earth lead upto 50m and for all lift, as directed by Engineer-incharge. All kinds of soil
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more.
Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete
Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Centering and shuttering including strutting, propping etc. and removal of form for : Suspended floors, roofs, landings, balconies and access platform
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.10 MB
Tendernotice_2.pdf
PDF • 1.32 MB
BOQ_363123.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid