Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹22,500
Closing Date
9 Sept 2026, 3:00 pm
Executive Engineer, PWD.
Office of the Executive Engineer, PWD., Buildings Construction and Maintenance Division, PWD Campus, Big Bazaar Street, Town Hall, Coimbatore-641 001
CONSTRUCTION OF TEMPORARY KITCHEN ARRANGEMENTS AND BIO MEDICAL WASTE ROOM IN GOVERNMENT HOSPITAL AT METTUPALAYAM
2026_PWD_696516_1
05/02N/CBE-DVN /2026-27
Open Tender
Civil Works - Buildings
Lump-sum
120 days
METTUPALAYAM
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹22,500
24 Aug 2026
24 Aug 2026
9 Sept 2026
24 Aug 2026
9 Sept 2026
24 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation by manual means for RR/Brick and Other step type footings for Load bearing structures in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. | 64.5 | m3 | 237.65 | ₹15,328.43 |
| 2 | PLAIN CEMENT CONCRETE 1:5:10 (One cement, five M - sand and ten aggregate) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers. | 6.35 | m3 | 5,249.45 | ₹33,334.01 |
| 3 | Refilling with foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 7.55 | m3 | 1,718.6 | ₹12,975.43 |
| 4 | Supply and filling in foundation and basement with Gravel with Lead in 5Km in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 15 | m3 | 487.75 | ₹7,316.25 |
| 5 | Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15cm thick well rammed with surface vibrator, watered and consolidated etc., complete complying with standard specification and as directed by the departmental officers. | 13.55 | m3 | 157.8 | ₹2,138.19 |
| 6Construction of BRICKWORK in cement mortar 1:6 (One cement and six M - sand) using best quality Fly ash Brick of size 230x110x70mm with class designation of 7.5 conforming to IS 13757-1993 or IS 12894-2002 for following including Cost of Mortar Plasticizer, curing, etc., complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally. other type of bond shall be done as directed by the Executive Engineer in charge. | |||||
| 6.01 | FOR FOUNDATION AND BASEMENT. | 15.7 | m3 | 7,353.95 | ₹1,15,457.01 |
| 6.02 | FOR SUPERSTRUCTURE IN GROUND FLOOR. | 32.5 | m3 | 7,446.85 | ₹2,42,022.63 |
| 7Brick partition walls of 11.50cm thickness using best quality Fly ash Brick of size 230x110x70mm with class designation of 7.5 conforming to IS 13757-1993 or IS 12894-2002 in Cement Mortar 1:3 (One Cement and Three CS Sand) using hoop iron reinforcement if found necessary including Cost of Mortar Plasticizer, curing etc. complete complying with standard specification and as directed by the departmental officers. (Hoop iron reinforcement will be measured and paid for separately) | |||||
| 7.01 | 11.50cm Thick FOR SUPERSTRUCTURE IN GROUND FLOOR. | 40 | m2 | 1,012.05 | ₹40,482 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
TenderDocument.pdf
Tender Documents • 0.47 MB
BOQ_837361.xls
BOQ • 0.48 MB
TenderCondition.pdf
Additional Documents • 1.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].