| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹16.8 LAccepted-Finance | 1 | Accepted-Finance Based on BOQ | |
| 2 | 2₹17.7 L+₹85,577.26 (5.09%)Rejected-Finance | 2 | Rejected-Finance Based on BOQ |
| Sl No | Description | Qty | Unit | P R Ramaraj L2 | I.Muthuramalingam L1 |
|---|---|---|---|---|---|
| 1.01 | Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete., | 46.04 | M3 | 277 ₹12,753.08 | 263.5 ₹12,131.54 Lowest |
| 1.02 | Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,l aying,curing etc complete., | 9.02 | M3 | 5,525 ₹49,835.5 | 5,262.2 ₹47,465.04 Lowest |
| 1.03 | Supply and Filling with u/s gravel including all labour charges for filling including watering ramming, consolidation and other incidental charges etc., complete | 21.97 | M3 | 417 ₹9,161.49 | 396.5 ₹8,711.11 Lowest |
| 1.04 | Brick work with cement mortar 1:5 mix using country bricks of size 83/4"x41/4"x2" for foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc ,complete. | 43.63 | M3 | 6,398 ₹2,79,144.74 | 6,093 ₹2,65,837.59 Lowest |
| 1.05 | Reinforced Cement concrete 1:11/2:3 mix using 20 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete., | 20.6 | M3 | 9,455 ₹1,94,773 | 9,005.4 ₹1,85,511.24 Lowest |
| 1.06 | Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc. | 2,500 | Kgs | 97 ₹2,42,500 | 91.93 ₹2,29,825 Lowest |
| 1.07 | Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., Below Basement | 49.11 | M3 | 575 ₹28,238.25 | 547.5 ₹26,887.73 Lowest |
| 1.08 | Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., | 101.07 | M2 | 1,150 ₹1,16,230.5 | 1,095 ₹1,10,671.65 Lowest |
| 1.09 | Finishing the top of the roof with one course of new machine pressed tiles of size 20x20x2 mmusing Cm 1:3 with water proofing compound 2% weight of cement used and the joints pointed with same | 50.47 | M2 | 1,391 ₹70,203.77 | 1,325.2 ₹66,882.84 Lowest |
| 1.10 | Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc | 380.57 | M2 | 296 ₹1,12,648.72 | 281.6 ₹1,07,168.51 Lowest |
Tender Value
₹17.5 L
EMD Value
₹17,520
Closing Date
7 Jul 2026, 3:00 pmClosed
Block DevelopmenPanchayat Union Offit Officer (VP)
Panchayat Union Office, Periyakulam
CONSTRUCTION OF NEW ANGANWADI BUILDING AT EAST STREET IN GULLAPURAM PANCHAYAT
2026_RDTN_681338_1
4915/2025/A4
Open Tender
Civil Works - Buildings
Item Rate
180 days
Periyakulam
as per tender document
4 documents required · 4 mandatory
₹0
₹17,520
17 Oct 2026
17 Jun 2026
7 Jul 2026
17 Jun 2026
7 Jul 2026
19 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete., | 46.04 | M3 | - | - |
| 1.02 | Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,l aying,curing etc complete., | 9.02 | M3 | - | - |
| 1.03 | Supply and Filling with u/s gravel including all labour charges for filling including watering ramming, consolidation and other incidental charges etc., complete | 21.97 | M3 | - | - |
| 1.04 | Brick work with cement mortar 1:5 mix using country bricks of size 83/4"x41/4"x2" for foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc ,complete. | 43.63 | M3 | - | - |
| 1.05 | Reinforced Cement concrete 1:11/2:3 mix using 20 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete., | 20.6 | M3 | - | - |
| 1.06 | Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc. | 2,500 | Kgs | - | - |
| 1.07 | Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., Below Basement | 49.11 | M3 | - | - |
| 1.08 | Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., | 101.07 | M2 | - | - |
| 1.09 | Finishing the top of the roof with one course of new machine pressed tiles of size 20x20x2 mmusing Cm 1:3 with water proofing compound 2% weight of cement used and the joints pointed with same | 50.47 | M2 | - | - |
| 1.1 | Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc | 380.57 | M2 | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
Tendernotice_2.pdf
PDF • 0.58 MB
BOQ_818801.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .