Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 LAccepted-AOC T P ROAD DURGAMANDIR ASANSOL BARDHAMAN 713303 WEST BENGAL INDIA | ASANSOL | BARDHAMAN | WEST BENGAL | 713303 | L1 | Accepted-AOC AS PER APPROVED TCR | |
| 2 | Rejected-Technical | - | Rejected-Technical as per NIT | |
| 3 | Rejected-Technical 1NO MOHISHILA COLONY ASANSOL BARDHAMAN WEST BENGAL 713303 | ASANSOL | BARDHAMAN | WEST BENGAL | 713303 | - | Rejected-Technical as per NIT |
| Sl No | Description | Qty | Unit | META ELECTRIC L1 |
|---|---|---|---|---|
| 1.00Item description | ||||
| 1.01 | Dismantling the coil from core for weighment | 1 | LS | 2,500 ₹2,500 Lowest |
| 1.02 | Gasket,nut bolts and other hardware items | 1 | LS | 1,800 ₹1,800 Lowest |
| 1.03 | Silver brazing electrode, DA/oxygen dove tail | 1 | LS | 3,500 ₹3,500 Lowest |
| 1.04 | Fitting of reformed coils in the limbs with required insulation and necessary coil connection | 1 | LS | 3,500 ₹3,500 Lowest |
| 1.05 | Assembling of transwitch | 1 | LS | 1,850 ₹1,850 Lowest |
| 1.06 | Drying of transformer at recommended temperature and testing | 1 | LS | 2,000 ₹2,000 Lowest |
| 1.07 | Cleaning and decarbonizing of old primary conductor | 1 | LS | 2,500 ₹2,500 Lowest |
| 1.08 | Cleaning and decarbonizing of old secondary conductor | 1 | LS | 3,500 ₹3,500 Lowest |
| 1.09 | Providing of EL grade new conductor | 96 | Kg | 876 ₹84,096 Lowest |
Tender Value
₹2.1 L
EMD Value
₹2,700
Closing Date
25 Jul 2025, 5:40 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
General Manager,SSA
Office of the General Manager,SSA
Complete rewinding of 315KVA,3.3KV/550V Prabhu make TSU of underground of Ningha colliery under Satgram-Sripur Area.
2025_ECL_339648_1
ECL/SSA/GM/E M/E-NIT/2025-26/33 Date 11.07.2025
Open Tender
Electrical and Maintenance Works
Fixed-rate
15 days
Ningha Colliery
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,700
12 Dec 2025
15 Jul 2025
26 Jul 2025
15 Jul 2025
25 Jul 2025
15 Jul 2025
15 Jul 2025 - 19 Jul 2025
Amount
Item description
Dismantling the coil from core for weighment
Gasket,nut bolts and other hardware items
Silver brazing electrode, DA/oxygen dove tail
Fitting of reformed coils in the limbs with required insulation and necessary coil connection
Assembling of transwitch
Drying of transformer at recommended temperature and testing
Cleaning and decarbonizing of old primary conductor
Cleaning and decarbonizing of old secondary conductor
Providing of EL grade new conductor
Less scrape value
Reinsulation of old primary conductor with DGC/nomex insualtion with class-F materials
Reinsulationof old secondary conductor with DGC/nomex
Reformation of primary coils as per original shape with class-F
Reformation of secondary coils as per original shape with class-F board glass fiber moulded cylinder of heavy sec plan spacers
Thinner and varnish including baking, drying out at recommended temperature
Transportation charges
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .