Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.5 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹14.2 L+₹70,751.26 (5.25%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L2₹14.2 L+₹70,751.26 (5.25%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L2₹14.2 L+₹70,751.26 (5.25%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹14.2 L
EMD Value
₹14,179
Closing Date
11 Aug 2026, 5:00 pmClosed
SE, BID, BURLA
O/O THE SE, BID, BURLA
Construction of right-side Guard wall with bed lining in between RD 1800m to RD 1977m of Lastala Distributary for the year 2026-27
2026_CEBBU_137301_1
BID-04(11 OF 12)/26-27
Open Tender
Civil Works - Canal
Percentage
45 days
BURLA
REFER DTCN
2 documents required · 2 mandatory
₹6,000
₹14,179
Yes
5 Oct 2026
1 Aug 2026
12 Aug 2026
1 Aug 2026
11 Aug 2026
1 Aug 2026
1 Aug 2026 - 11 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork exavation in all kind of soil including dressing and levelling the bed and depositing the excavated materials away from the work site with all leads, lifts, sundries, T&P required for the work etc complete as directed by the Engineer in Charge | - | Cum | 276.9 | - |
| 2 | Filling foundation and plinth with sand including cost, conveyance & royalty of all materials to the work site including watering & ramming with all leads, lifts, sundries & T&P etc . complete, as per direction of Engineer-in-Charge. | 57.55 | Cum | 714.6 | ₹41,125.23 |
| 3 | C.C. / R.C.C. works of M-15 grade with 20mm. and down grade black hard granite Crusher broken stone chips including hoisting and laying over prepared surface with ramming and including cost, conveyance and royalty of all materials and curing upto required period etc. complete and as per direction of the Engineer-in-Charge. | 197.1 | Cum | 5,879.8 | ₹11,58,908.58 |
| 4 | Rigid smooth centering & shuttering for cement concrete works including false work & dismantling after casting and clearing the debries from worksite with all leads,lifts, sundries including cost ,conveyance labour T&P etc. complete as directed by Engineer-in-charge | 518.99 | Sqm | 248.7 | ₹1,29,072.81 |
| 5 | Filling in foundation and Plinth with excavated materials incluiding watering ,ramming etc complete as per direction of Engineer in charge | 68.07 | Cum | 153.8 | ₹10,469.17 |
stage.html
html • 0.02 MB
finance_603713.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.93 MB
DTCN11.pdf
Tender Documents • 2.00 MB
BOQ_603713.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .