| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.8 LAccepted-AOC | ₹6.8 L Quoted ₹7.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹8.6 LRejected-AOC | ₹8.6 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SRI AYYAPPAN ENTERPRISES | MSC ENTERPRISES |
|---|---|---|---|---|---|
| 1.00 | Hiring and fixing Diesel/ Electric pump for dewatering pump including hire charges for dewatering pumps, operator cost, transporting and placing in position of pumps, including all accessories like delivery hose, suction pipe, dismantling of the same after completion of work with all lead, lift, labour, consumables, T&P, etc., complete. | 11.52 | Hrs | 7,326.72 ₹8,645.53 | 8,640 ₹10,195.20 |
| 2.00 | Engaging 1 No JCB for excavation in Toe Drain Dust Supression Pump Room West side to Stilling Pond including cost of labour, hire charges, lead, lift, etc., complete. | 0.64 | Day | 4,857.6 ₹5,731.97 | 5,760 ₹6,796.80 |
| 3.00 | Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 2m in sand, silt or other loose soil wet sand or silt not under water light block cotton soil sandy loan and ordinary soil including excavated earth. | 143.65 | M3 | 14,652.3 ₹17,289.71 | 15,083.25 ₹17,798.24 |
| 4.00 | R.R. Masonry in C.M 1:5 including cost of all materials, labours, lead, lift, curing, etc. complete. | 25.2 | M3 | 1,72,040.4 ₹2.0 L | 2,14,200 ₹2.5 L |
| 5.00 | Pointing the RR Masonry Wall with C.M 1:5, including cost of all materials, labours, lead, lift, curing, etc. complete. | 55.8 | M2 | 20,255.4 ₹23,901.37 | 27,342 ₹32,263.56 |
| 6.00 | Refilling with excavated soil other than sand complying with standard specification for filling in sides of drain with watering and consolidation including cost of labours, lead, lift, etc. complete. | 18.3 | M3 | 969.9 ₹1,144.48 | 1,098 ₹1,295.64 |
| 7.00 | Providing shuttering arrangements for supporting the reinforced cement concrete surfaces rate including cost of all materials, labour, lead, lift, tools etc., complete. | 95.8 | M2 | 55,564 ₹65,565.52 | 57,480 ₹67,826.40 |
| 8.00 | Providing PCC 1:4:8 cement concrete using OP/PP cement with 40mm size machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete | 25.5 | M3 | 1,64,220 ₹1.9 L | 1,78,500 ₹2.1 L |
| 9.00 | Providing RCC 1:1.5:3 using OP/PP cement with 12mm to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete - excluding cost of reinforcement and form work. | 17 | M3 | 1,86,150 ₹2.2 L | 2,04,000 ₹2.4 L |
| 10.00 | Supplying & providing Steel reinforcement including cutting, bending, tying & fixing in position as per specification including binding wires, cost of all other materials, labours, lead, lift, etc. complete. | 1,209.75 | Kg | 1,24,604.25 ₹1.5 L | 1,45,170 ₹1.7 L |
Tender Value
Refer Docs
EMD Value
₹7,600
Closing Date
17 Nov 2025, 2:00 pmClosed
CE TTPS Thoothukudi
Office of the SE Civil TTPS Thoothukudi
Repair and Rectification Works to Drain leading from 595 E Road junction near 45 N Road to Stilling Pond area
2025_EB_619065_1
CE SE C TTPS 300 2025 26
Open Tender
Civil Works - Others
90 days
Tuticorin Thermal Power Station
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹7,600
Yes
16 Mar 2026
31 Oct 2025
18 Nov 2025
31 Oct 2025
17 Nov 2025
31 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_740064.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid