Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.4 LAdmitted-Fee/PreQual/Technical/Finance HARSH GAYATRI GREEN COLONY WARD NO 50 BILASPUR BILASPUR CHHATTISGARH 495006 | BILASPUR | BILASPUR | CHHATTISGARH | 495006 | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.7 L+₹30,056.40 (12.5%)Admitted-Fee/PreQual/Technical/Finance B 34 CMPDI COLONY NEAR SANT KABIR CHOUK GEVRA BASTI DISTT KORBA CHHATTISGARH | KORBA | KORBA | CHHATTISGARH | 495454 | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹2.7 L+₹33,068.07 (13.7%)Admitted-Fee/PreQual/Technical/Finance MIG 1 26 PT RAVI SHANKAR SHUKLA NAGAR KORBA KORBA KORBA CHHATTISGARH 495677 | KORBA | CHHATTISGARH | 495677 | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹2.8 L+₹36,079.73 (15.0%)Admitted-Fee/PreQual/Technical/Finance HOUSE NO 52WORD NO 09ANAMIKA RAJAK W O MANISH RAJAK TIWARIPARA SHRI LAXMI CONSTRUCTION WARD NO 09 TIWARIPARA DHELWADHI | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹3.5 L+₹1.1 L (44.4%)Admitted-Fee/PreQual/Technical/Finance NEAR GAYATRI MANDIR ADARSH NAGAR KUSMUNDA DIST KORBA 495454 | KORBA | KORBA | CHHATTISGARH | 495454 | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹6.0 L
EMD Value
₹7,600
Closing Date
31 Oct 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
STAFF OFFICER(CIVIL), SECL KUMSUNDA AREA
OFFICE OF THE STAFF OFFICER (CIVIL), SECL KUSMUNDA AREA P.O. KUSMUNDA COLLIERY 495454 DISTT. KORBA (CG) CONTACT No. 9142653810
Repair and maintenance of community hall Jamuna Nagar Kuchena of Kusmunda Area.
2026_SECL_367381_1
SECL/GM/KSM/CIVIL/e-Tender /26-27/70 dt. 18/10/2026
Open Tender
Civil Works - Others
Percentage
60 days
KUSMUNDA AREA, SECL
As per NIT and Tender Documents
3 documents required · 3 mandatory
₹7,600
2 Nov 2026
20 Oct 2026
2 Nov 2026
20 Oct 2026
31 Oct 2026
21 Oct 2026
20 Oct 2026 - 24 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Item Description / Heading | |||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 10 | cum | 187.5 | ₹1,875 |
| 1.02 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.8 | cum | 5,206.4 | ₹14,577.92 |
| 1.03 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) | 2.1 | cum | 6,660.3 | ₹13,986.63 |
| 1.04 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fllets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement: 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 2 | cum | 7,803.8 | ₹15,607.6 |
| 1.05 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete. | 16.6 | sqm | 278.1 | ₹4,616.46 |
| 1.06 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts | 34.5 | sqm | 663.15 | ₹22,878.68 |
| 1.07 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold twisted bars | 410 | kg | 90.2 | ₹36,982 |
| 1.08 | 12 mm cement plaster of mix : 1:6 (1 cement: 6 fine sand) | 230 | sqm | 226.55 | ₹52,106.5 |
| 1.09 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. | 167.45 | sqm | 106.95 | ₹17,908.78 |
stage.html
html • 0.03 MB
finance_380371.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 3.34 MB
Tendernotice_2.pdf
PDF • 14.04 MB
Tendernotice_3.pdf
PDF • 1.11 MB
BOQ_380371.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .