Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.0 LAdmitted-Finance | -5.50% | ₹7.0 L | L1 | Admitted-Finance |
| 2 | L2₹7.1 L+₹4,744.50 (0.68%)Admitted-Finance | -4.86% | ₹7.1 L+₹4,744.50 (0.68%) | L2 | Admitted-Finance |
| 3 | L3₹7.2 L+₹14,826.56 (2.12%)Admitted-Finance | -3.50% | ₹7.2 L+₹14,826.56 (2.12%) | L3 | Admitted-Finance |
| 4 | L4₹7.2 L+₹22,239.84 (3.17%)Admitted-Finance | -2.50% | ₹7.2 L+₹22,239.84 (3.17%) | L4 | Admitted-Finance |
| 5 | L5₹7.3 L+₹29,653.12 (4.23%)Admitted-Finance | -1.50% | ₹7.3 L+₹29,653.12 (4.23%) | L5 | Admitted-Finance |
Tender Value
₹7.4 L
EMD Value
₹15,000
Closing Date
9 Jun 2026, 4:00 pmClosed
Executive Eng. II
Construction office, P.U. Campus
Roof Treatment of S.B.I. Building(Main Branch) in Panjab University Campus, Sector-14, Chandigarh.
2026_PU_92623_1
6856/EE/Mtc.
Open Tender
Civil Works
Percentage
150 days
Panjab University Campus, Sector-14
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹15,000
12 Jun 2026
22 May 2026
10 Jun 2026
22 May 2026
9 Jun 2026
22 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Civil Work | |||||
| 1.01 | Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead upto 5km for all lifts, complete as per directions of Engineer-in-charge. (Ref:-1.1.18) | 46 | Cum | 178 | ₹8,188 |
| 215mm cement plaster on rough side of single or half wall of mix | |||||
| 2.01 | 1:4 (1cement :4 fine sand) (Ref:-13.2) | 100 | Sqm | 328 | ₹32,800 |
| 3 | Regrading terracing of mud phuska covered with tiles or brick, in cement by dismantling tiles or bricks, removing mud plaster preparing the surface of mud phaska to proper slope relaying mud plaster gobri leaping and tiles or bricks, grouted in cement mortar 1:3 (1 cement : 3 fine sand ) including replacing unserviceable tiles or bricks with new ones and disposal of unserviceable material to the dumping ground (the cost of the new tiles or brick excluded) within 50 metres lead. (Ref:-14.13) | 450 | Sqm | 491 | ₹2,20,950 |
| 3.01 | Flush pointing with cement mortar 1:3 (1 cement : 3 fine sand) mixed with 2% of integral water proofing compound by weight of cement for flat tile bricks on top of mud phaska : (Ref:-14.18.1) | 450 | Sqm | 102 | ₹45,900 |
| 4Providing and fixing APP (Atactic Polypropylene Polymer) modified prefabricated five layer 3 mm thick water proofing membrance, black finished reinforced with glass fibre matt consisting of a coat of bitumen primer for bitumen membrane @ 0.40 litre/sqm by the same membrance manufacture of density at 25°C, 0.87 - 0.89 kg/ litre and viscocity 70 - 160 cps. Over the primer coat the layer of membrane shall be laid using Butane torch and sealing all joints etc., and preparing the surface complete. The vital physical and chemical parameters of the membrane shall be as under : Joint strength in longitudinal and transverse direction at 23°C as 350/300 N/ 5 cm. Tear strength in longitudinal and transverse direction as 60/80N. Softening point of membrane not less than 150°C. Cold flexibility shall be upto -2°C when tested in accordance with ASTM, D - 5147. The laying of membrane shall be got done through the authorised applicator of the manufacture of membrane. | |||||
| 4.01 | 3mm Thick (Ref:-14.90.1) | 450 | Sqm | 533 | ₹2,39,850 |
| 5 | Removing mortar/Mud from bricks/tiles and cleaning bricks including stacking within a lead of 50 m (stacks of cleaned bricks shall be measured) (Ref:-15.8.3) | 7,742 | Nos. | 5 | ₹38,710 |
| 6 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. (Ref:-15.56) | 450 | Sqm | 39 | ₹17,550 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.67 MB
BOQ_113354.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .