Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1 for B1₹1.3 LAccepted-AOC | L1 for B1 | Accepted-AOC being L1 for BOQ1 | |
| 2 | L1₹3.1 LAccepted-AOC | L1 | Accepted-AOC being L1 for BOQ2 and 3 | |
| 3 | L3Rejected-AOC | L3 | Rejected-AOC Not being L1 |
Tender Value
₹4.9 L
EMD Value
₹12,200
Closing Date
25 Mar 2019, 3:00 pmClosed
SE P and W
sarni
Various L T electrical works during AOH or COH of unit No11 STPS Sarni
2019_MPPGC_6900_2
STPS/WT2591
Open Tender
Electrical Works
Item Wise
30 days
Sarni
As per NIT
5 documents required · 5 mandatory
₹500
Yes
Payable To
₹12,200
Yes
30 Jan 2020
12 Mar 2019
29 Mar 2019
12 Mar 2019
25 Mar 2019
12 Mar 2019
BTG AREA
Clean out conveyor, Vacuum pump of generator, stirrer for dosing fan/ pump.
A/H Guide Bearing & Support Brg, Oil Vapour extractor, Hydrazine & Amonia dosing, Cooling Fan HPSU-1, circulation pump HPSU-2 .
ID LOP, Cooling Fan HPSU-2,CF circulation HPSU-1 etc.
Coal Feeder, AC Scanner, DC scanner, FD/PA/Mill/BFP motor LOP, COLTC ,Compr. Air motor at clarified, AC SOP
APH main drive, ID Hydraulic coupling, Control Fluid HPSU main motor, DC SOP,hot well make up pump
Seal air fan motor, AOP, EOP
AC/DC JOP
Vacuum Pump
DMCW SG, Boiler fill pump
DMCW TG
HP Dozing GSC Exhauster MOT Lub oil Trasf.
BOP AREA & Common Areas
Sulphuric acid dosing pump, Antiscalant dosing pump, CMT- SBA Tank.
Acid dosing pump (UF), NaOCl dosing pump (UF), DM plant STP.
Degasser Blower, Lime dosing pump.
Flash Mixer, Clariflocculator Mechanism
AC Condset motor , mixed air blowers
CST, N-pit, Jockey pump
DM feed pump
CT Make Up Pumps, AC chilled & conde. Water motor
Service Water pump Motor
Hydrant pump, Spray pump
ESP/APH backwash pump
Alkali Unloading Pump, EQT/FMR Blower
Switchyard AC Condensate Water pump, Sump oil Pump, Drain oil motor
Cooling Tower Fan, Filter Backwash Pump
Description of Work / Item(s)
Overhaul work of 6.6 KV / 415V LT Switchgears of BTG & BOP AREA of Unit-11
Cleaning, tightness, checking & overhauling work of various 415 V bus/MCC and all motor modules in MCCs during AOH/COH of U#11
Cleaning, tightness, checking and overhaul work of various 6.6KV switchgear / panels during AOH/COH
Description of Work / Item(s)
Overhaul Work related with electrical equipments installed in ESP of Unit No. 11, STPS, Sarni.
Cleaning work of shaft insulator and replacement of defective insulator if any ,with complete painting of housing inside and outside
Dismantling, removal & testing of shaft insulator heater, refitting ,replacing the defective if any.
Dismantling, removal & testing of hopper heater & support insulator heater, refitting, replacement of the defective if any.The work includes cleaning of heater pockets & packing/sealing.
Overhauling & painting of diconnecting boxes of HVR transformer
Complete overhauling work of emitting & collecting, gas distribution rapping motors inculding disconnection, shifting & re-installation .
Repairing ,painting of rapping motor covers by standard quality paint.
Cleaning of support insulators and support insulator boxes.work include opening and closing of box covers and their repairing & painting
TAPASYA ENGINEERING
CONTRACTO CONSTRUCTION CO
CONTRACTO CONSTRUCTION CO
S D PATANKAR
S D PATANKAR
CONTRACTO CONSTRUCTION CO
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .