Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.4 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹22.8 L+₹34,621.33 (1.54%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹24.6 L+₹2.2 L (9.78%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹25.7 L+₹3.2 L (14.4%)Admitted-Finance | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SAIRAM CONSTRUCTIONS L4 | Vinoth Constructions L1 | R Raja L2 | G S Senthilmurugan L3 |
|---|---|---|---|---|---|---|---|
| 1.00Rejuvenation of MI Tank ,ReConstruction of Weir and ReConstruction of Sluice @ Karuvampakkam Panchayat. | |||||||
| 1.01 | Clearing the Scrub jungle without uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification | 5,760 | Sqm | 7.21 ₹41,505.87 | 6.3 ₹36,288 Lowest | 6.39 ₹36,827.39 | 6.91 ₹39,813.4 |
| 1.02 | Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete | 450 | cum | 65.25 ₹29,362.73 | 57.02 ₹25,659 Lowest | 57.9 ₹26,053 | 62.59 ₹28,165.41 |
| 1.03 | Extra Watering and Consolidation by Power Roller includung hire charges | 450 | cum | 47.23 ₹21,251.48 | 41.27 ₹18,571.5 Lowest | 41.9 ₹18,856.04 | 45.3 ₹20,384.91 |
| 1.04ReConstruction of Weir @ Eri in Karuvampakkam Panchayat. | |||||||
| 1.05 | Earthwork excavation for foundation in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size of boulders hard gravelly soil inclusive of shoring to full depth strutting and bailing out w | 90.73 | cum | 271.69 ₹24,650.74 | 237.4 ₹21,539.3 Lowest | 241.07 ₹21,872.15 | 260.61 ₹23,645.57 |
| 1.06 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed | 25.54 | cum | 5,517.44 ₹1,40,915.47 | 4,821.07 ₹1,23,130.13 Lowest | 4,895.52 ₹1,25,031.7 | 5,292.46 ₹1,35,169.41 |
| 1.07Providing steel centring for RCC slabs,beams or plain surfaces including strutting 3m height usingMS sheet ,BG .10 gauge thick of size 90 x60cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists of size 10cm 6.50cm | |||||||
| 1.08 | For Centering without strutting(up to basement) | 83.1 | sqm | 563.92 ₹46,862.17 | 492.75 ₹40,947.52 Lowest | 500.36 ₹41,579.94 | 540.93 ₹44,951.28 |
| 1.09 | for centering With Strutting | 81.28 | sqm | 1,127.85 ₹91,671.65 | 985.5 ₹80,101.44 Lowest | 1,000.72 ₹81,338.56 | 1,081.86 ₹87,933.58 |
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
22 Sept 2026, 3:00 pmClosed
BDO (BP)
Bdo Office Olakkur
Olakkur/14th CFC (Saving)-2026-27
2026_RDTN_704883_1
Olakkur/14th CFC (Saving)-2026-27
Open Tender
Civil Works
Works
90 days
Bdo Office Olakkur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹25,000
Yes
26 Sept 2026
16 Sept 2026
22 Sept 2026
16 Sept 2026
22 Sept 2026
16 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Rejuvenation of MI Tank ,ReConstruction of Weir and ReConstruction of Sluice @ Karuvampakkam Panchayat. | |||||
| 1.01 | Clearing the Scrub jungle without uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification | 5,760 | Sqm | 7 | ₹40,296.96 |
| 1.02 | Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete | 450 | cum | 63.35 | ₹28,507.5 |
| 1.03 | Extra Watering and Consolidation by Power Roller includung hire charges | 450 | cum | 45.85 | ₹20,632.5 |
| 1.04 | ReConstruction of Weir @ Eri in Karuvampakkam Panchayat. | - | - | - | - |
| 1.05 | Earthwork excavation for foundation in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size of boulders hard gravelly soil inclusive of shoring to full depth strutting and bailing out w | 90.73 | cum | 263.78 | ₹23,932.76 |
| 1.06 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed | 25.54 | cum | 5,356.74 | ₹1,36,811.14 |
| 1.07 | Providing steel centring for RCC slabs,beams or plain surfaces including strutting 3m height usingMS sheet ,BG .10 gauge thick of size 90 x60cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists of size 10cm 6.50cm | - | - | - | - |
| 1.08 | For Centering without strutting(up to basement) | 83.1 | sqm | 547.5 | ₹45,497.25 |
| 1.09 | for centering With Strutting | 81.28 | sqm | 1,095 | ₹89,001.6 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
Package1.pdf
Tender Documents • 1.14 MB
BOQ_847311.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .