Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹80,933.83Admitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.2 L+₹37,795.50 (46.7%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹99,000
EMD Value
₹2,970
Closing Date
10 Jul 2026, 6:00 pmClosed
office of the executive engineer rew ang
office of the executive engineer rew ang
C/O CONCRETE PATH FHO SUHAIL AH SHEIKH TO MOHD AFZAL WANI AND CROSSING NHO AB GANI DAR AND OTHERS BLOCK HILLER SHAHABAD
2026_RDPR_314415_14
ENIT44of2026-27
Open Tender
Civil Works
Percentage
30 days
anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
office of the executive engineer rew ang
₹2,970
13 Jul 2026
3 Jul 2026
11 Jul 2026
3 Jul 2026
10 Jul 2026
3 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix) | - | cum | - | - |
| 0.0 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil. | 1 | cum | - | - |
| 0.0 | providing and laying of dry stone solling hand packed nallah stone boulders in foundation i/c carriage.of 10kms | 1 | cum | 1 | ₹1 |
| 0.0 | Providing and laying in position specified grade of cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level, 1:3:6 mix (1 cement : 3coarse sand : 6 graded stone aggregate 40 mm nominal size)with 20% plum | - | cum | 1 | - |
| 0.0 | Providing and laying in position specified grade of Reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level, 1:1.5:3 mix (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | cum | 1 | - |
| 0.0 | Reinforcment for RCC work include straightening cutting, bending, binding and placing in position all complete MT steel bars at all levels. | - | kg | 1 | - |
| 0.0 | Centering and shuttering including strutting, propping etc. and removal of form work for: (a) Foundations, footings, bases for columns | 1 | cum | - | - |
| 0.0 | Centering and shuttering including strutting, propping etc. and removal of form work for: (b) Suspended floors, roofs, landings, balconies and access platforms | - | sqm | - | - |
| 0.0 | carriage of materials by M.T | - | - | - | - |
| 0.0 | crushed stone aggregates 40mm15km, | - | cum | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.34 MB
BOQ_1018055.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .