Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.6 LAccepted-AOC 19 LAKE TEMPLE ROAD KOLKATA 700029 | KOLKATA | WEST BENGAL | 700029 | L1 | Accepted-AOC L1 | |
| 2 | L2₹35.9 L+₹26,472 (0.74%)Rejected-Finance D S 185 186 SECTOR D LDA COLONY KANPUR ROAD LUCKNOW LUCKNOW UTTAR PRADESH 226012 | LUCKNOW | UTTAR PRADESH | 226012 | L2 | Rejected-Finance L2 | |
| 3 | L3₹48.6 L+₹13.0 L (36.6%)Rejected-Finance 3 4 JEEVAN DEEP BUILDING 10 PARLIAMENT STREET NEW DELHI 1 PH 011 43573493 9899713006 | L3 | Rejected-Finance L3 | |
| 4 | L4₹53.6 L+₹18.0 L (50.6%)Rejected-Finance E 2 216 GROUND FLOOR SHIV RAM PARK NEAR LUCKY GARDEN NANGLOI NEW DELHI 110041 | WEST DELHI | DELHI | 110041 | L4 | Rejected-Finance L4 | |
| 5 | L5₹54.5 L+₹18.9 L (53.0%)Rejected-Finance PLOT NO 37 BADANPUR OLD SER NO 34658 NEAR SAI BARAT PALACE PAWAN BHUMI SHAKTI NAGAR JABALPUR MADHYA PRADESH 482001 | JABALPUR | MADHYA PRADESH | 482001 | L5 | Rejected-Finance L5 |
Tender Value
₹49.9 L
EMD Value
₹99,808
Closing Date
3 Sept 2022, 6:00 pmClosed
AGM (E-E), Gaya Airport, Gaya
AGM (E-E), AAI, Gaya Airport, Gaya
Annual Operation and Comprehensive Maintenance Contract of 3x350TR AC plant for the year 2022 2025 at Gaya Airport Gaya
2022_AAI_125570_1
AAI/GY/AGM (E)/ 3x350TR AC plant /eNIT-05/22-23/
Open Tender
Electrical Works
Works
1095 days
Gaya Airport
Please refer Tender documents.
16 documents required · 16 mandatory
₹1,120
Yes
₹99,808
Yes
5 Jun 2024
12 Aug 2022
5 Sept 2022
13 Aug 2022
3 Sept 2022
13 Aug 2022
13 Aug 2022 - 18 Aug 2022
Amount
Annual comprehensive maintenance contract of 3 x 350 TR (TRANE MAKE) Centrifugal type Central A.C. plant, 03 Nos. of 100 HP Chiller pumps, 03 Nos. of 60 HP Condenser Pumps, 10 Nos. of AHUs, AHU panels, 01 No. of Control Panel, 02 Nos. of LT panels, FCUs & 03 Nos. Cooling towers and all related installations comprising checks, quarterly, half yearly and annual servicing & over hauling, attending breakdown, supply and replacement of defective parts and consumables as per the need basis at site to keep the plant serviceable and as per special cum particular specifications as required. Note :- 3 nos Cooiling Tower ( Advance Cooling Make ) for 3X350 TR AC plant will under DLP during first Year of AMC.
(a) 1st Year
(b) 2nd Year
(c) 3rd Year
Operation and day to day maintenance of 3x350 TR (TRANE MAKE) A/C plant including AHU`s, FCU`s etc & maintaining the desired cooling level in Terminal Building on all days including saturday , Sundays and holidays and to keep all records, operation log books, maintenance log book etc as per special cum particular specification etc as required. (i) Operator (Skilled)-3Nos. (ii) Khallasi (Un-Skilled)-1 No.
Providing additional manpower for operation of HVAC plant required after operation of scheduled duty hrs in case of extension of watch hour or any other requirement etc complete as required by deploying (i) operator -01 Nos and (ii) Helper -01 Nos on hourly basis.
Anoop Refrigeration
SNOWMEX ENGINEERS LIMITED
Supertech Engineers
Zamzam Refrigeration and airconditioning
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .