Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical 50 FAROOQ AHMAD MATTA JAWAHAR NAGAR PARSI BAGH SRINAGAR JAMMU KASHMIR 190001 UDYAM JK 21 0015719 | SRINAGAR | JAMMU AND KASHMIR | 190001 | Accepted-Technical found ok |
| 2 | Accepted-Technical | Accepted-Technical found ok |
Tender Value
₹16.1 L
EMD Value
₹32,172
Closing Date
22 Jul 2026, 6:00 pmClosed
DC(Works)
FTR HQ BSF KMR
Providing and Supplying of Drinking water at FDL Button of 89 BN BSF Now 31 Bn Tangdhar under SHQ BSF Kupwara
2026_BSF_917650_1
122/NIT/BSF/FTRKMR/2026-27
Open Tender
Civil Works
Percentage
120 days
FDL Button
As Per NIT Specification
16 documents required · 16 mandatory
₹0
₹32,172
18 Aug 2026
16 Jul 2026
24 Jul 2026
16 Jul 2026
22 Jul 2026
16 Jul 2026
16 Jul 2026 - 22 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 47.7 | cum | 177.5 | ₹8,466.75 |
| 1.02 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. Ordinary rock | 3 | cum | 498.9 | ₹1,496.7 |
| 1.03 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources | 2.5 | Cum | 6,812 | ₹17,030 |
| 1.04 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.57 | cum | 9,045.75 | ₹14,201.83 |
| 1.05 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.81 | cum | 10,852.95 | ₹30,496.79 |
| 1.06 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.45 | cum | 11,505.5 | ₹5,177.48 |
| 1.07 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | 2.2 | Sqm | 392.15 | ₹862.73 |
| 1.08 | Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc | 21.6 | Sqm | 842.5 | ₹18,198 |
| 1.09 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform | 6 | Sqm | 927.25 | ₹5,563.5 |
| 1.1 | Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers | 7.2 | Sqm | 736.4 | ₹5,302.08 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.95 MB
BOQ_964351.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .