Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.2 LAccepted-AOC | ₹13.2 L Quoted ₹13.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹15.3 LRejected-AOC | ₹15.3 L | L2 | Rejected-AOC L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical BOQ NOT SATISFIED |
| Sl No | Description | Qty | Unit | MOHAN AGENCIES L1 | DUS ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00 | Operation of all required STP pumps in Sewage Treatment and sewage collection chamber pump including cost of all safety measures inspection of pipe lines etc, complete. | 730 | Operation | 1,299 ₹9.5 L | 1,450 ₹10.6 L |
| 2.00Provision of consumables such as Sodium Hypochlorite for (1 Litre/day) disinfection, Blower Oil (To be replaced once in am month ,Litre/month) and Blower belt (To be replaced once in Three months) for maintaining Air blowers etc., complete | |||||
| 2.01 | Sodium Hypochlorite 10-12% | 365 | day | 21 ₹7,665 | 30 ₹10,950 |
| 2.02 | Blower Oil | 12 | month | 500 ₹6,000 | 830 ₹9,960 |
| 2.03 | Blower belt | 6 | no | 1,099 ₹6,594 | 1,200 ₹7,200 |
| 2.04 | Cotton waste | 120 | kg | 10.2 ₹1,224 | 12 ₹1,440 |
| 3.00 | Clearing scrub jungle with and disposing off to a place at least 1Km away from the site as directed by the Engineer including all labours charges lead, lift, T&P etc, complete (One in three months) | 23,516 | M2 | 7.99 ₹1.9 L | 11 ₹2.6 L |
| 4.00 | Regular maintenance of the existing Tree plantation by watering alternate days, removal of weeds, growth and plugging oput of extra grass growth at the bottom of tree, the arte including labour charges, all lead, lift, tools and tackles such as water hoses/pipes etc, complete. | 60,242 | No | 2.39 ₹1.4 L | 3.1 ₹1.9 L |
Tender Value
Refer Docs
EMD Value
₹13,000
Closing Date
22 Dec 2025, 2:00 pmClosed
CE/NCTPS-II
Office of CE/CM/NCTPS-II Chennai-120
NCTPS II Civil Maintenance Circle Civil Project Division Operation and maintenance of 600KLD Sewage Treatment Plant at Vallur camp for the period of one year from 01.04.2026 to 31.03.2027 or from the date of commencement
2025_EB_629651_1
CE/NCTPS-II/SE/CM/38/2025-26
Open Tender
Civil Works
NCTPS-II
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹13,000
Yes
16 Mar 2026
6 Dec 2025
23 Dec 2025
6 Dec 2025
22 Dec 2025
6 Dec 2025
Operation of all required STP pumps in Sewage Treatment and sewage collection chamber pump including cost of all safety measures inspection of pipe lines etc, complete.
Provision of consumables such as Sodium Hypochlorite for (1 Litre/day) disinfection, Blower Oil (To be replaced once in am month ,Litre/month) and Blower belt (To be replaced once in Three months) for maintaining Air blowers etc., complete
Sodium Hypochlorite 10-12%
Blower Oil
Blower belt
Cotton waste
Clearing scrub jungle with and disposing off to a place at least 1Km away from the site as directed by the Engineer including all labours charges lead, lift, T&P etc, complete (One in three months)
Regular maintenance of the existing Tree plantation by watering alternate days, removal of weeds, growth and plugging oput of extra grass growth at the bottom of tree, the arte including labour charges, all lead, lift, tools and tackles such as water hoses/pipes etc, complete.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.15 MB
Spec38.pdf
Tender Documents • 0.59 MB
BOQ_752924.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid