| 1 | 1₹1.7 CrAccepted-AOC | ₹1.7 Cr | 1 | Accepted-AOC 1 |
| 2 | 2₹1.8 CrRejected-Finance BULANDSHAHAR | HATHRAS | UTTAR PRADESH | 203001 | ₹1.8 Cr | 2 | Rejected-Finance 2 |
| 3 | 3₹1.8 CrRejected-Finance ALIGARH UTTAR PRADESH | ALIGARH | UTTAR PRADESH | 202001 | ₹1.8 Cr | 3 | Rejected-Finance 3 |
Updated dates
Tender Value
₹2.0 Cr
EMD Value
₹12.6 L
Closing Date
17 Mar 2026, 12:00 pmClosed
SE BSRO PWD BULANDSHAHR
SE BSRO PWD BULANDSHAHR
New Construction work of Kandaula to Karanpur Road
2026_CEMRT_1123634_2
2571/96M/E-TENDER/BSRO/2025-26 DT 28.02.2026
Open Tender
Civil Works
365 days
HAUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹12.6 L
Yes
26 May 2026
11 Mar 2026
17 Mar 2026
11 Mar 2026
17 Mar 2026
11 Mar 2026
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 as per direction of E/I including cost of all material, labour, royalty, T&P and all other taxes as applicable but excluding cost of GST.
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 as per direction of E/I including cost of all material, labour, royalty, T&P and all other taxes as applicable but excluding cost of GST.
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401, as per direction of E/I including cost of all material, labour, royalty, T&P and all other taxes as applicable but excluding cost of GST.
Providing, laying and spreading Cement Treated Base material on a prepared sub base, cement @4% by weight to the spread material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of base. as per direction of E/I including cost of all material, labour, royalty, T&P and all other taxes as applicable but excluding cost of GST.
Providing and applying tack coat with Bitumen (VG10) using emulsion distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. as per direction of E/I including cost of all material, labour, royalty, T&P and all other taxes as applicable but excluding cost of GST.
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of Type C as per Technical Specification Clause 508. as per direction of E/I including cost of all material, labour, royalty, T&P and all other taxes as applicable but excluding cost of GST.
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510, as per direction of E/I including cost of all material, labour, royalty, T&P and all other taxes as applicable but excluding cost of GST.
Providing concrete for plain concrete grade M-10 in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203, as per direction of E/I including cost of all material, labour, royalty, T&P and all other taxes as applicable but excluding cost of GST.
Reinforced cement concrete grade M-20 in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204, as per direction of E/I including cost of all material, labour, royalty, T&P and all other taxes as applicable but excluding cost of GST.
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 as per direction of E/I including cost of all material, labour, royalty, T&P and all other taxes as applicable but excluding cost of GST.
Providing, laying & fixing reinforced concrete pipe NP3 for culvert in single row including cost of all material, labour and T&P etc. complete.Dia. of pipe- 350 as per direction of E/I including cost of all material, labour, royalty, T&P and all other taxes as applicable but excluding cost of GST.
Brick masonry work in cement mortar 1:4 in substructure complete excepting pointing and plastering as per drawing and technical specification Clauses 602, 603, 604, 1202 & 1204 as per direction of E/I including cost of all material, labour, royalty, T&P and all other taxes as applicable but excluding cost of GST.
Pointing with cement mortar (1:3) on brick work as per drawing and technical specification Clauses 613.3 and 1204 as per direction of E/I including cost of all material, labour, royalty, T&P and all other taxes as applicable but excluding cost of GST.
Plastering with cement mortar (1:4) 15 mm thick on brick work in substructure as per technical specification Clauses 613.4 & 1204 as per direction of E/I including cost of all material, labour, royalty, T&P and all other taxes as applicable but excluding cost of GST.
Reinforced cement concrete M15 grade Ordinary Kilometer Stone (Precast) of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 as per direction of E/I including cost of all material, labour, royalty, T&P and all other taxes as applicable but excluding cost of GST.
Reinforced cement concrete M15 grade 200 m stone (precast) of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 as per direction of E/I including cost of all material, labour, royalty, T&P and all other taxes as applicable but excluding cost of GST.
Maintainance Charge including Bituminous Work, Cement Concrete work, Earth Work, Earth Work on patri, Culvert, etc as per Direction of E/I for the period of Five Year from the actual completion of work and As per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO Maintainance of First Year @0.00%
Maintainance Charge including Bituminous Work, Cement Concrete work, Earth Work, Earth Work on patri, Culvert, etc as per Direction of E/I for the period of Five Year from the actual completion of work and As per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO Maintainance of Second Year @0.75%
Maintainance Charge including Bituminous Work, Cement Concrete work, Earth Work, Earth Work on patri, Culvert, etc as per Direction of E/I for the period of Five Year from the actual completion of work and As per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO Maintainance of Third Year @1.50%
Maintainance Charge including Bituminous Work, Cement Concrete work, Earth Work, Earth Work on patri, Culvert, etc as per Direction of E/I for the period of Five Year from the actual completion of work and As per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO Maintainance of Fourth Year @2.25%
Maintainance Charge including Bituminous Work, Cement Concrete work, Earth Work, Earth Work on patri, Culvert, etc as per Direction of E/I for the period of Five Year from the actual completion of work and As per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO Maintainance of Fifth Year @3.0%
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401, as per direction of E/I including cost of all material, labour, royalty, T&P and all other taxes as applicable but excluding cost of GST.
Providing, laying, spreading and compacting stone aggregates of sizes 53mm to 22.4mm to water bound macadam grade 3 specifications including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. as per direction of E/I including cost of all material, labour, royalty, T&P and all other taxes as applicable but excluding cost of GST.
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement grade M-30, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2, coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and technical specifications 1501. as per direction of E/I including cost of all material, labour, royalty, T&P and all other taxes as applicable but excluding cost of GST.
Maintainance Charge including Bituminous Work, Cement Concrete work, Earth Work, Earth Work on patri, Culvert, etc as per Direction of E/I for the period of Five Year from the actual completion of work and As per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO Maintainance of First Year @0.00%
Maintainance Charge including Bituminous Work, Cement Concrete work, Earth Work, Earth Work on patri, Culvert, etc as per Direction of E/I for the period of Five Year from the actual completion of work and As per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO Maintainance of Second Year @0.25%
Maintainance Charge including Bituminous Work, Cement Concrete work, Earth Work, Earth Work on patri, Culvert, etc as per Direction of E/I for the period of Five Year from the actual completion of work and As per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO Maintainance of Third Year @0.50%
Maintainance Charge including Bituminous Work, Cement Concrete work, Earth Work, Earth Work on patri, Culvert, etc as per Direction of E/I for the period of Five Year from the actual completion of work and As per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO Maintainance of Fourth Year @0.75%
Maintainance Charge including Bituminous Work, Cement Concrete work, Earth Work, Earth Work on patri, Culvert, etc as per Direction of E/I for the period of Five Year from the actual completion of work and As per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO Maintainance of Fifth Year @1%
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.50 MB
Tendernotice_2.pdf
PDF • 19.63 MB
BOQ_2093372.xls
BOQ • 1.08 MB
Download all tender documents and submit your bid