Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 CrAdmitted-Finance GRAM KAKNA POST JAITPUR SAHJANWAN DISTRICT GORAKHPUR UTTAR PRADESH | GORAKHPUR | UTTAR PRADESH | 273001 | ₹2.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.7 Cr+₹4.2 L (1.57%)Admitted-Finance GORAKHPUR | GORAKHPUR | GORAKHPUR | UTTAR PRADESH | ₹2.7 Cr+₹4.2 L (1.57%) | L2 | Admitted-Finance |
| 3 | L3₹2.8 Cr+₹14.1 L (5.25%)Admitted-Finance VILLAGE GOBINDAPUR POST SONHA DISTRICT BASTI | BASTI | UTTAR PRADESH | ₹2.8 Cr+₹14.1 L (5.25%) | L3 | Admitted-Finance |
| 4 | L4₹2.8 Cr+₹15.3 L (5.70%)Admitted-Finance | ₹2.8 Cr+₹15.3 L (5.70%) | L4 | Admitted-Finance |
| 5 | L5₹2.9 Cr+₹17.7 L (6.59%)Admitted-Finance | ₹2.9 Cr+₹17.7 L (6.59%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S ARPNA CONSTRUCTION L1 | M/s VIJENDRA PRATAP SINGH L2 | M/S BALA JI ENTERPRISES L3 | SANTOSH KUMAR SRIVASTAVA L4 | M/S MITTAL BROTHERS ENGINEERS AND L5 | M/S RUCHI CONSTRUCTION CO L6 | M/S PRABHAT TRADERS L7 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation of foundation for all structures of Campierganj Branch all type of soil including lead upto 30.00m, lift upto 3.5m , and its proper disposal and back filling as per direction given by Engineer incharge required for proper completion of work including cost of all T&P, labour etc. | 3,486.73 | Cum | - | - | - | - | - | - | - |
| 2.00 | Laying C.C- A 40 M-10 in foundation of all structures of campierganj branch with Cement (O.P.C.,43 grade). course sand of F.M. not less than 2.0 and hard stone ballest (20-40mm size) including lead up to 60.0 m.lift up to 3.0 m. mechanical mixing & mechanical vibration but excluding cost of Centering and shuttering required for proper completion of work including cost of all material T.&P. etc. | 89.44 | Cum | - | - | - | - | - | - | - |
| 3.00 | Laying C.C- A 20 M-15 with Cement (O.P.C.,43 grade). course sand of F.M. not less than 2.0 and crushed stone grit 4.75mm to 20mm size including lead up to 60.0 m.lift up to 3.0 m. mechanical mixing & mechanical vibration but excluding cost of Centering and shuttering required for proper completion of work including cost of all material T.&P. etc. | 865.07 | Cum | - | - | - | - | - | - | - |
| 4.00 | Laying C.C- A 20 M-20 with Cement (O.P.C.,43 grade). course sand of F.M. not less than 2.0 and crushed stone grit 4.75mm to 20mm size including lead up to 60.0 m.lift up to 3.0 m. mechanical mixing & mechanical vibration but excluding cost of Centering and shuttering required for proper completion of work including cost of all material T.&P. etc. | 359.07 | Cum | - | - | - | - | - | - | - |
| 5.00 | Laying C.C- A 20 M-25 with Cement (O.P.C.,43 grade). course sand of F.M. not less than 2.0 and crushed stone grit 4.75mm to 20mm size including lead up to 60.0 m.lift up to 3.0 m. mechanical mixing & mechanical vibration but excluding cost of Centering and shuttering required for proper completion of work including cost of all material T.&P. etc. | 846.13 | Cum | - | - | - | - | - | - | - |
| 6.00 | Laying R.C.C A-10-M-30 with cement (OPC-43 Grade)coarse sand of F.M not less than 2.5 and crused hard stone grit of size 4.75 to 20mm including lead up to 60m lift up to 3m mechnical mixing & mechnical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all meterial, T&P, Labour etc. | 49.15 | M³ | - | - | - | - | - | - | - |
| 7.00 | Cutting, Bending, Binding and placing TMT steel bars for reinforcement with cost of binding wire in all structures of campierganj branch required for proper completion of work including cost of all material,labour T.&P. etc. | 94.73 | MT | - | - | - | - | - | - | - |
| 8.00 | Laying and fixing joint filler board 20 mm. Thick as specified locations in different structures of campierganj branch required for proper completion of work including cost of all material,labour and T.&P.etc. | 17.16 | Sqm | - | - | - | - | - | - | - |
| 9.00 | Centering & Shuttering for C.C / R.C.C. work in different parts of structures in campierganj branch with all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour ,T.&P. etc. A-Upto 3.00m span | 512.36 | sqm | - | - | - | - | - | - | - |
| 10.00 | Centering & Shuttering for C.C / R.C.C. work in different parts of structures in campierganj branch with all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour ,T.&P. etc. B-Above 3.00m span | 1,987 | sqm | - | - | - | - | - | - | - |
Tender Value
₹3.5 Cr
EMD Value
₹7.1 L
Closing Date
24 Dec 2019, 1:00 pmClosed
S. E., Rapti Nahar Nirman Mandal-2 Basti U.P.
Superintending Engineer, Rapti Nahar Nirman Mandal-2 Basti U.P.
CONSTRUCTING H.R. OF ESCAPE CHANNEL AT KM. 29.000 ON CAMPIERGANJ BRANCH
2019_UPIDC_414035_1
06/SE/2019-20
Open Tender
Civil Works
Item Wise
90 days
Maharajganj
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
Treasury Challan
₹7.1 L
S. E., Rapti Nahar Nirman Mandal-2 Basti U.P.
17 Jan 2020
17 Dec 2019
24 Dec 2019
18 Dec 2019
24 Dec 2019
18 Dec 2019
19 Dec 2019
Amount
Earth work in excavation of foundation for all structures of Campierganj Branch all type of soil including lead upto 30.00m, lift upto 3.5m , and its proper disposal and back filling as per direction given by Engineer incharge required for proper completion of work including cost of all T&P, labour etc.
Laying C.C- A 40 M-10 in foundation of all structures of campierganj branch with Cement (O.P.C.,43 grade). course sand of F.M. not less than 2.0 and hard stone ballest (20-40mm size) including lead up to 60.0 m.lift up to 3.0 m. mechanical mixing & mechanical vibration but excluding cost of Centering and shuttering required for proper completion of work including cost of all material T.&P. etc.
Laying C.C- A 20 M-15 with Cement (O.P.C.,43 grade). course sand of F.M. not less than 2.0 and crushed stone grit 4.75mm to 20mm size including lead up to 60.0 m.lift up to 3.0 m. mechanical mixing & mechanical vibration but excluding cost of Centering and shuttering required for proper completion of work including cost of all material T.&P. etc.
Laying C.C- A 20 M-20 with Cement (O.P.C.,43 grade). course sand of F.M. not less than 2.0 and crushed stone grit 4.75mm to 20mm size including lead up to 60.0 m.lift up to 3.0 m. mechanical mixing & mechanical vibration but excluding cost of Centering and shuttering required for proper completion of work including cost of all material T.&P. etc.
Laying C.C- A 20 M-25 with Cement (O.P.C.,43 grade). course sand of F.M. not less than 2.0 and crushed stone grit 4.75mm to 20mm size including lead up to 60.0 m.lift up to 3.0 m. mechanical mixing & mechanical vibration but excluding cost of Centering and shuttering required for proper completion of work including cost of all material T.&P. etc.
Laying R.C.C A-10-M-30 with cement (OPC-43 Grade)coarse sand of F.M not less than 2.5 and crused hard stone grit of size 4.75 to 20mm including lead up to 60m lift up to 3m mechnical mixing & mechnical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all meterial, T&P, Labour etc.
Cutting, Bending, Binding and placing TMT steel bars for reinforcement with cost of binding wire in all structures of campierganj branch required for proper completion of work including cost of all material,labour T.&P. etc.
Laying and fixing joint filler board 20 mm. Thick as specified locations in different structures of campierganj branch required for proper completion of work including cost of all material,labour and T.&P.etc.
Centering & Shuttering for C.C / R.C.C. work in different parts of structures in campierganj branch with all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour ,T.&P. etc. A-Upto 3.00m span
Centering & Shuttering for C.C / R.C.C. work in different parts of structures in campierganj branch with all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour ,T.&P. etc. B-Above 3.00m span
Dewatering with all cost of power/P.O.L., machine,pumps,well point system & operate etc with assembling and dismantling of equipments etc. required for completion of work.
Earth work in Exvation for making diversion, in all type of soil including cost of all T.&P.,labour etc.
Earth work in filling for removal of diversion, in all type of soil including cost of all T.&P.,labour etc.
Providing and laying 10 to 20.mm size crushed stone grit (granite) in laying filter in required for proper complection of work including cost of all materials, labour, T.&P.etc.
Providing and laying 20 to 40.mm size crushed stone grit (granite) in laying filter in slopes required for proper complection of work including cost of all materials, labour, T.&P.etc.
Providing & Laying coarse sand for filter base required for proper complection of work including cost of all materials, labour, T.&P.etc.
PVC water stop seal 10mm thick for proper complition of work including cost of all material, labour, T&P etc
E/W in making canal section U/S and D/S i/c cost of all lead, lift ,dressing and manual campaction
S/F Draiange spout pipe 100mm dia in R.C.C slab for proper complition of work including cost of all material, labour, T&P etc
Brick on edge soling on Diversion Ramp with preparation of sub grade and filling joints with local earth, required for proper complection of work, including cost of all material, labour, T&P etc.
Brick on edge soling on Diversion Ramp with preparation of sub grade and filling joints with local earth, required for proper complection of work, including cost of all material, labour, T&P etc.
Carriage and laying stone boulder(Weight 20kg to 40kg and minimum diamension of 200 mm) for canal slop protection in required for proper completion of work including cost of all material,labour and T.&P.etc.
M/s VIJENDRA PRATAP SINGH
M/S BALA JI ENTERPRISES
SANTOSH KUMAR SRIVASTAVA
M/S MITTAL BROTHERS ENGINEERS AND
M/S RUCHI CONSTRUCTION CO
M/S PRABHAT TRADERS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
CampiarganjbidLot01.pdf
Tender Documents • 2.61 MB
BOQ_603997.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .