Loading…
Loading…
Tender Value
₹17.4 L
EMD Value
₹51,250
Closing Date
31 Aug 2026, 10:00 pm3d left
Directorate of Municipal Administration
S D Kerur
8904146760
Construction of compound wall surround the solid waste disposal unit of the Rabkavi Banahatti City Municipal Council
DMA/2025-26/OW/WORK_INDENT50298
DMA/2025-26/OW/WORK_INDENT50298
Open
Other Works
Electronic Documents, First(One Cover)
DMA City Municipal Council Rabkavi Banhatti
6 documents required · 6 mandatory
₹500
₹51,250
10 Aug 2026
10 Aug 2026
28 Aug 2026
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead By Mechanical means Dismantling Brick / Tile work / rubble masonry / pitching / etc by mechanical means (P.No.10, I.No.2.11.IIA, Vol-3, SR 2023-24)
Basic Rate
Area weightage @ 3%
Final Rate
Earth work excavation for pipeline trenches in all kinds of soils by mechanical means above 600 mm (Depth upto 1.50m not exceeding 1.5m in width) trench width as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and evelling the bottom of trench to the extent required, utilising the available excavated earth locally for the work etc., and All kinds of soils. Depth upto 1.50m (P.No.44, I.No.1.17.1, Vol-1, SR 2023-24)
Basic Rate
Area weightage @ 3%
Final Rate
Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5 m. Including cost of all labour complete as per specifications (P.No.35, I.No. 1.10, Vol-1 SR 23-24)
Basic Rate
Area weightage @ 3%
Final Rate
Loading and Unloading of Stone Boulder/Stone aggregates/ Sand/Kankar/Moorum. (Tipper 10 m3) (P.No.05, I.No.1.1B, Vol-3, S.R. 2023-24)
Basic Rate
Area weightage @ 3%
Final Rate
Cost of Haulage Excluding Loading and Unloading Case-1 : Surfaced Road Taking output 10 t load and lead 10 km = 100 t.km ( I. No. 1.4(i)A, Vol-3, SR 2023-24)
Basic Rate
Area weightage @ 3%
Final Rate
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.Cement Concrete Drain Wall 35% on finished rate of concrete per m3 (P.No.16, I.No.2.4.2, Vol-1, SR 2023-24
Basic Rate
Area weightage @ 3%
Final Rate
For wall ( Form work 35% )
For wall ( Form work 35% )
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification All other type of structures (P.No.90, I.No.2.11h, Vol-1, S.R. 2023-24)
Basic Rate
Area weightage @ 3%
Final Rate
Tonne
Providing 20 mm cement plaster of mix :1:4 (1 cement: 4 fine sand) to brick/stone masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. Page no.41, Item no.8.3.1 PWD SR 2023-24 Volume 2
Basic Rate
Area weightage @ 3%
Final Rate
Total Rs.
Add GST 18%
Total Rs.
Total Amount Rs.
Miscelellaneous & Rounding Off
Total Amount Rs.
Junior Engineer
CMC, Rabkavi-Banhatti
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
kw-1 Pkg-1 - 50298.doc
Tender Document • 1.02 MB
SWM COMPOUND.xlsx
Tender Document • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].