Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.1 LAccepted-AOC GURUGRAM | GURUGRAM | HARYANA | 122001 | L1 | Accepted-AOC LOWEST | |
| 2 | l2₹12.5 L+₹1.4 L (13.0%)Rejected-AOC N A | l2 | Rejected-AOC HIGHEST | |
| 3 | l3₹14.0 L+₹2.9 L (26.5%)Rejected-AOC ARAZI NO 1144 LOT NO 48D DAHELI SUJANPUR BHAWANI NAGAR DAHELI SUJANPUR BHAWANI NAGAR KANPUR KANPUR NAGAR UTTAR PRADESH 208013 | KANPUR NAGAR | UTTAR PRADESH | 208013 | l3 | Rejected-AOC HIGHEST | |
| 4 | l4₹14.3 L+₹3.2 L (29.4%)Rejected-AOC 1350 B SHYAM LAL BAGH NEAR NAND CINEMA HISAR 125001 | HISAR | HARYANA | 125001 | l4 | Rejected-AOC HIGHEST | |
| 5 | l5₹16.3 L+₹5.2 L (47.2%)Rejected-AOC | l5 | Rejected-AOC HIGHEST |
Tender Value
₹15 L
EMD Value
₹30,000
Closing Date
16 May 2022, 5:00 pmClosed
EXECUTIVE ENGINEER
MUNICIPAL CORPORATION HISAR
Providing and Fixing of High Mast of 12.5 mtr. Long in various places of Hisar City.
2022_HRY_220117_1
RECALL
Open Tender
Civil Works
Works
45 days
MUNICIPAL CORPORATION HISAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
Yes
₹30,000
Yes
17 Aug 2022
7 May 2022
17 May 2022
7 May 2022
16 May 2022
7 May 2022
Amount
Supply, installation, Testing and Commissioning of BJFL-200 Watt LED-I (White) Flood Light or equivalent model luminaire with ultra-sleek, light weight and secondary optics, made of pressure die-cast housing with IP66, with tolerance up to ±5% having more than 120 LPW as per latest amendments complete in all respect as per specification attach and entire satisfaction of Engineer-in-charge of work (with 5 years free replacement warrantee, mtc & defect liability period free of cost as per specification) Make:- Philips| Bajaj| Crompton|) (N.S.)
S/E of Automatic Timing Switch of make AMSons/L&T/Indoasian /C&D of cabinet fabrication from 22gauge sheet powder coated, mountable on wall/pillar pole, MS Pedestal connection from the bottom of cabinet with Power Control System in existing Almira on/off system with timer 24 Hours dial adjustable to operate the system as per required timing with 3 Nos. Contractors of 3 Phase 40/63Amp with Auto Manual system with Required petty material to complete the job including labour charges up to entire satisfaction of engineer of in charge. (N.S.)
Bidder Name
Amount
Royal Traders(GSTN-06BDLPK6716N1Z1)
pawan Kumar(GSTN-06AHFPA3096E1ZQ)
N D ELECTRICAL(GSTN-06COBPS6986J1Z7)
KANHA CONSTRUCTION COMPANY(GSTN-NA)
THE ROHINI COOP L&C SOCIETY LTD.(GSTN-NA)
THE ROHINI COOP L&C SOCIETY LTD.
pawan Kumar
KANHA CONSTRUCTION COMPANY
Royal Traders
THE ROHINI COOP L&C SOCIETY LTD.
KANHA CONSTRUCTION COMPANY
pawan Kumar
Royal Traders
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .