Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.6 CrAccepted-AOC 13TH FLOOR DN18 SALTEE TECH PARK SECTOR V SALT LAKE BIDHAN NAGAR KOLKATA 700091 | 24 PARAGANAS NORTH | WEST BENGAL | 700091 | ₹2.6 Cr | 1 | Accepted-AOC Accept |
| 2 | 2₹2.8 Cr+₹26.8 L (10.4%)Rejected-AOC 1 IIND PADMA TOWER RAJENDRA PLACE WEST DELHI CENTRAL DELHI DELHI 110008 | WEST DELHI | DELHI | 110008 | ₹2.8 Cr+₹26.8 L (10.4%) | 2 | Rejected-AOC Reject |
| 3 | 3₹3.1 Cr+₹51.2 L (20.0%)Rejected-AOC B 18 ARYA NAGAR OM PARISAR DURG CHHATTISGARH 491001 | DURG | CHHATTISGARH | 491001 | ₹3.1 Cr+₹51.2 L (20.0%) | 3 | Rejected-AOC Reject |
Tender Value
Refer Docs
EMD Value
₹5 L
Closing Date
12 Sept 2023, 3:00 pmClosed
AS PER BID DOC
Western Region Head QuartersII Plot No. -87, Sector-24, RAIPUR 492018
AS PER BID DOC
2023_NTPC_78022_1
NTPC/USSC-CPG1/9900260287
Open Tender
Miscellaneous Works
Works
180 days
Western Region Head QuartersII
As per tender documents
4 documents required · 4 mandatory
₹2,665
Yes
₹5 L
Yes
1 May 2024
26 Jul 2023
13 Sept 2023
26 Jul 2023
12 Sept 2023
28 Jul 2023
Amount
PART-A: SUPPLY
Supply of 20Mtr high mast complete set
Supply of 30Mtr high mast complete set
Supply of 45Mtr high mast complete set
Supply of Foundation Bolt for 20Mtr Mast
Supply of Foundation Bolt for 30Mtr Mast
Supply of Foundation Bolt for 45Mtr Mast
Supply of 500W LED Flood Lights (30 deg)
Supply of 500W LED Flood Lights (15 deg)
Supply of 50mm dia DWC HDPE pipe
Supply of 65mm dia DWC HDPE pipe
Supply of 100mm dia DWC HDPE pipe
Supply of 1.1KV AL Cable XLPE AR 3.5Cx35
Supply of 1.1KV AL Cable XLPE AR 3.5Cx70
Supply of 1.1KV AL Cable XLPE AR 3.5x120
Supply of 1.1KV AL Cable XLPE AR 3.5x240
Supply of 1.1KV AL Cable XLPE AR 4Cx6
Supply of standard LM Feeder pillar
Supply of MLDB (I/C- 125A, O/G- 32&63A)
Supply of End Termination 3.5Cx35 cable
Supply of End Termination 3.5Cx70 cable
Supply of End Termination 3.5Cx120 cable
Supply of End Termination 3.5Cx240 cable
Supply of End Termination 4Cx6 cable
PART-B: INSTALLATION, TESTING & COMMG.
Construction of foundation for 20M Mast
Construction of foundation for 30M Mast
Construction of foundation for 45M Mast
Shifting, Eerct., Test. & Commg 20M Mast
Shifting, Eerct., Test. & Commg 30M Mast
Shifting, Eerct., Test. & Commg 45M Mast
Dismantling of existing 30Mtr high mast
Shift, ETC of 500W LED Flood Light (30d)
Shift, ETC of 500W LED Flood Light (15d)
Shifting & Laying of 50mm dia DWC pipe
Shifting & Laying of 65mm dia DWC pipe
Shifting & Laying of 100mm dia DWC pipe
Shift & Laying- GI/ HDPE pipe upto 200mm
Cable Trench 750mm deep x 300mm wide
Laying of 1.1KV Cable: 3.5Cx35
Laying of 1.1KV Cable: 3.5Cx70
Laying of 1.1KV Cable: 3.5Cx120
Laying of 1.1KV Cable: 3.5Cx240
Laying of 1.1KV Cable: 4Cx6
Shifting ET&C of High Mast Feeder Pillar
Shifting ET&C of MLDBs
Making Cable End Termination: 3.5Cx35
Making Cable End Termination: 3.5Cx70
Making Cable End Termination: 3.5Cx120
Making Cable End Termination: 3.5Cx240
Making Cable End Termination: 4Cx6
Earthing with GI Pipe as per IS 3043
Earthing with 25x3 GI Flat (incl supply)
Amount Linked to Safety Aspects
Amount Linked to Safety Aspects
SURYA ROSHNI LIMITED
SG Associates
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .