| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.5 LAdmitted-Finance | ₹15.5 L | L1 | Admitted-Finance |
| 2 | L2₹16.0 L+₹56,641.67 (3.66%)Admitted-Finance PO DHAN SINGH WALA GONIANA DISTT BATHINDA | GONIANA | BATHINDA | PUNJAB | ₹16.0 L+₹56,641.67 (3.66%) | L2 | Admitted-Finance |
| 3 | L3₹16.8 L+₹1.4 L (8.80%)Admitted-Finance B 1 1769 PREM NAGAR KOTKAPURA | ₹16.8 L+₹1.4 L (8.80%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SURJIT SINGH AND SONS L3 | M/S H.S. CONSTRUCTIONS, BATHINDA L2 | P K TRADERS L1 |
|---|---|---|---|---|---|---|
| 1.00 | Screening the gravel collected from around the foundations. | 9.38 | Cum | 28.08 ₹263.39 | 26 ₹243.88 Lowest | 26 ₹243.88 Lowest |
| 2.00 | Stacking the gravel collected from around the foundations. | 9.38 | Cum | 19.44 ₹182.35 | 18 ₹168.84 Lowest | 18 ₹168.84 Lowest |
| 3.00 | Re-spreading of gravel in the yard area in 3'' thick layer after finishing of foundations. | 9.38 | Cum | 140.79 ₹1,320.61 | 130.36 ₹1,222.78 | 130 ₹1,219.4 Lowest |
| 4.00 | Earth Work in Excavation in foundation trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches , stacking the excavated soil clear from edge of excavation and subsequent filling around masonary in 15 cm layers with compaction including disposal of all surplus soil as directed with in lead of 30 metres. | 250.09 | Cum | 175.5 ₹43,890.8 | 200 ₹50,018 | 162 ₹40,514.58 Lowest |
| 5.00 | Earth filling under floors with surplus
ordinary soil or soil containing gravel or kankar upto 40% excavated from outside the building plinth in 15 cm layers including ramming, watering and consolidating lead upto 30 metres | 2.29 | Cum | 60.75 ₹139.12 | 56.25 ₹128.81 | 56 ₹128.24 Lowest |
| 6.00 | Earth filling under floors with surplus soil containing more than 40% taking outside the premises in 15 cm layers including ramming watering and consolidated lead upto 1000 metres | 13.55 | Cum | 315.32 ₹4,272.59 | 291.96 ₹3,956.06 | 291 ₹3,943.05 Lowest |
| 7.00 | Dismantling brick work tile, masonry or tile lining-In cement | 15.08 | Cum | 657.64 ₹9,917.21 | 608.93 ₹9,182.66 | 608 ₹9,168.64 Lowest |
| 8.00 | Dismantling concrete-Cement concrete plain1:2:4 mix | 0.39 | Cum | 1,316.25 ₹513.34 | 1,218.75 ₹475.31 | 1,218 ₹475.02 Lowest |
| 9.00 | Dismantling concrete-Reinforced cement concrete | 1.18 | Cum | 2,125.29 ₹2,507.84 | 1,967.86 ₹2,322.07 | 1,967 ₹2,321.06 Lowest |
| 10.00 | Dismantling cement conglomerate floors 25mm to 50mm thick including concrete base. | 30.25 | Sqm | 105.11 ₹3,179.58 | 100 ₹3,025 | 97 ₹2,934.25 Lowest |
Tender Value
₹18.4 L
EMD Value
₹36,750
Closing Date
4 Aug 2026, 3:00 pmClosed
Sr.Xen CWD PSTCL Patiala
Sr.Xen CWD PSTCL Patiala
Construction of 1 no. Addl. 20 MVA 66/11 KV TF plinth along with allied civil works and Extension in control room at 220 KV S/S Kakrala .
2026_POWER_172353_1
22/2026-27
Open Tender
Civil Works
Item Rate
225 days
220 KV SS Kakrala
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹36,750
Yes
6 Aug 2026
21 Jul 2026
5 Aug 2026
21 Jul 2026
4 Aug 2026
21 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Screening the gravel collected from around the foundations. | 9.38 | Cum | 26 | ₹243.88 |
| - | Stacking the gravel collected from around the foundations. | 9.38 | Cum | 18 | ₹168.84 |
| - | Re-spreading of gravel in the yard area in 3'' thick layer after finishing of foundations. | 9.38 | Cum | 130.36 | ₹1,222.78 |
| - | Earth Work in Excavation in foundation trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches , stacking the excavated soil clear from edge of excavation and subsequent filling around masonary in 15 cm layers with compaction including disposal of all surplus soil as directed with in lead of 30 metres. | 250.09 | Cum | 162.5 | ₹40,639.63 |
| - | Earth filling under floors with surplus
ordinary soil or soil containing gravel or kankar upto 40% excavated from outside the building plinth in 15 cm layers including ramming, watering and consolidating lead upto 30 metres | 2.29 | Cum | 56.25 | ₹128.81 |
| - | Earth filling under floors with surplus soil containing more than 40% taking outside the premises in 15 cm layers including ramming watering and consolidated lead upto 1000 metres | 13.55 | Cum | 291.96 | ₹3,956.06 |
| - | Dismantling brick work tile, masonry or tile lining-In cement | 15.08 | Cum | 608.93 | ₹9,182.66 |
| - | Dismantling concrete-Cement concrete plain1:2:4 mix | 0.39 | Cum | 1,218.75 | ₹475.31 |
| - | Dismantling concrete-Reinforced cement concrete | 1.18 | Cum | 1,967.86 | ₹2,322.07 |
| - | Dismantling cement conglomerate floors 25mm to 50mm thick including concrete base. | 30.25 | Sqm | 97.32 | ₹2,943.93 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.34 MB
Mainpage.pdf
Tender Documents • 0.55 MB
3techspec.pdf
Tender Documents • 2.61 MB
2TandC125Kakrala.pdf
Tender Documents • 0.64 MB
BOQ_350492.xls
BOQ • 0.42 MB
ApprovedDNITKakralaCR.pdf
Additional Documents • 7.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .