Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.4 LRejected-Finance 11 13 7 TASKAND ROAD CIVIL LINES PRAYAGRAJ | L1 | Rejected-Finance L1 | |
| 2 | L2₹29.4 L+₹522.89 (0.02%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹29.6 L+₹23,012.15 (0.78%)Rejected-Finance GRAM PO DUDHI SONBHADRA U P | L3 | Rejected-Finance L3 | |
| 4 | Not Admitted-Fee/PreQual/Technical M0 NO 211 AWAS VIKAS COLONY POLICE STATION KOTWALI KATRA TEHSIL SADAR DISTRICT MIRZAPUR | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹60,000
Closing Date
18 Mar 2021, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE K C P D-4, DUDHI SONEBHADRA
OFFICE OF EE K C P D-4, DUDHI SONEBHADRA
CONSTRUCTION OF V.R.B. AT KM. 1.600 of L.K.C
2021_UPIDC_568536_2
03/EE/2020-21
Open Tender
Civil Works - Buildings
Item Rate
180 days
DUDDHI SONEBHADRA
Please refer Tender Doc.
2 documents required · 2 mandatory
₹1,180
₹60,000
Yes
29 Dec 2021
12 Mar 2021
18 Mar 2021
12 Mar 2021
18 Mar 2021
12 Mar 2021
90 days
Amount
Site Clearence for constructing VRB including all leads and lifts, labour charges, T& P etc. required for proper completion of work and its disposal as per direction of Engineer-in-charge.
Earth work in excavation of foundation in all types of soil including all leads and lifts, labour charges, T& P etc. required for proper completion of work and its disposal as per direction of Engineer-in-charge.
Laying C.C. 1:2:4 (M–15) in foundation with cement, coarse sand of F.M. not less than 2.00 and hard stone ballast as obtained from the excavation of foundation including cost of all material, labour, T&P etc. required for proper completion of workas per direction of Engineer-in-charge.
Laying C.C. 1:1.5:3 (M–20) in foundation with cement, coarse sand of F.M. not less than 2.00 and hard stone ballast as obtained from the excavation of foundation including cost of all material, labour, T&P etc. required for proper completion of work as per direction of Engineer-in-charge.
Centering & shuttering for C.C./R.C.C. work in different parts of structure as below including cost of all materials, labour, T&P etc. required for proper completion of work as per direction of Engineer-in-charge.
Laying R.C.C. (M–25) with cement, coarse sand of F.M. not less than 2.00 and crushed hard stone grit including cost of all material, labour, T&P etc. required for proper completion of work but excluding cost of reinforcement, centering and shuttering. in construction of different parts of structure as per direction of Engineer-in-charge.
Carriage, Cutting, Bending, Binding and placing steel for reinforcement with cost of binding wire including cost of all materials, labour, T&P etc. required for proper completion of work as per direction of Engineer-in-charge.
Laying & Fixing joint filler board (18m.m. thick) including cost of all materials, labour, T& P etc. required for proper completion of work as per direction of Engineer-in-charge.
Providing and fixing PVC Pipe in drainage spout & weep hole including cost of all materials, labours, T&P etc, required for proper completion of work as per direction of Engineer-in-charge.
Laying 3 m.m. thick Polyplus Multyplast tar paper over bed block including cost of all materials, labours, T&P etc, required for proper completion of work as per direction of Engineer-in-charge.
Providing expansion joint in concrete including placing and fixing of angle iron & M.S. plate and filling with bitumen including cost of all materials, labours, T&P etc. required for proper completion of work as per direction of Engineer-in-charge.
Earth work in filling in embankment including all leads and lift, cost of soil, labour charges, manual compaction and T&P etc. with including proper dressing as per direction of Engineer-in-charge.
Supplying and laying coarse sand in ramp including cost of all materials, labour, T&P etc. required for proper completion of work as per direction of Engineer-in-charge.
Laying dry stone boulder pitching including cost of all materials, labours, T&P etc. required for proper completion of work as per direction of Engineer-in-charge.
Maa Vijaya Construction
PANKAJ KUMAR GUPTA
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .