| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-Finance 11 13 7 TASKAND ROAD CIVIL LINES PRAYAGRAJ | L1 | Accepted-Finance Lowest 1 bidder | |
| 2 | L2₹1.4 Cr+₹8.3 L (6.38%)Accepted-Finance GRAM PO DUDHI SONBHADRA U P | L2 | Accepted-Finance Second Lowest Bidder | |
| 3 | L3₹1.4 Cr+₹11.5 L (8.88%)Accepted-Finance | L3 | Accepted-Finance Third Lowest Bidder | |
| 4 | L4₹1.5 Cr+₹16.9 L (13.1%)Accepted-Finance | L4 | Accepted-Finance Fourth Lowest Bidder |
| Sl No | Description | Qty | Unit | a.k. construction L1 | PANKAJ KUMAR GUPTA L2 | PANDEY ENTERPRISES L3 | M/S S. S. ENTERPRISES L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work cutting in soil for making of Canal section including cost of labour charges, dressing of canal section required quantity for filling in embankment including lead up to 30 m and all lift, T&P, Labour, etc. required for proper completion of work as per directon of engineer- in- charge. | 1,746.43 | Cum | 120 ₹2,09,571.6 | 80 ₹1,39,714.4 | 70.19 ₹1,22,581.92 Lowest | 75.79 ₹1,32,361.93 |
| 2.00 | Excavating in canal other rock(Hard Rock) by blasting removing muck & stacking including all lift and lead up to 210 m etc for completion of work as per direction of engineer- in- charge. | 249.49 | Cum | 200 ₹49,898 Lowest | 475 ₹1,18,507.75 | 417.2 ₹1,04,087.23 | 450.49 ₹1,12,392.75 |
| 3.00 | Excavating in canal soft rock by blasting removing muck & stacking including all lift and lead up to 210 m etc for completion of work as per direction of engineer- in- charge. | 498.98 | Cum | 200 ₹99,796 Lowest | 385 ₹1,92,107.3 | 239 ₹1,19,256.22 | 239 ₹1,19,256.22 |
| 4.00 | Cutting Soil Used in Earth work filling by Power transport where execavated earth used from cutting section of canal with a lead up to 1 km including mechanical compaction with watering to bring it at OMC to achieve minimum 95% dry density of excavated earth with all lift and T&P etc required for proper completion of work as per direction of engineer-in charge. | 1,746.43 | Cum | 120 ₹2,09,571.6 | 97 ₹1,69,403.71 | 87 ₹1,51,939.41 Lowest | 87 ₹1,51,939.41 Lowest |
| 5.00 | Earth Work in Filling by power transport with lead up to 1.0 km including cost of excavation,loding,unloding,mechanical compaction with watering to bring it at OMC to Achieve minimum 95% Dry density of excavated earth and cost of labour charges,dressing etc with including all lift for proper completion of work as per direction of Engineer - in-charge. . | 27,296.27 | Cum | 200 ₹54,59,254 Lowest | 217.8 ₹59,45,127.61 | 236.9 ₹64,66,486.36 | 255.8 ₹69,82,385.87 |
| 6.00 | Earth work in excavation in foundation in all types of soil mixed with charri, bajari, kankar, soft rock, hard rocks etc. including wet earth work with slush with all lead and lift including back filling and disposal of surplus excavated earth including labours, T&P, taxes etc. for proper completion of the work. | 6,630.9 | Cum | 150 ₹9,94,635 Lowest | 180 ₹11,93,562 | 179.71 ₹11,91,639.04 | 179.98 ₹11,93,429.38 |
| 7.00 | Supplying and laying Sand on top of Pipe including cost of all material, labour, lead and lift, T&P, taxes etc. for proper completion of the work. | 354.19 | Cum | 800 ₹2,83,352 Lowest | 1,075 ₹3,80,754.25 | 1,062.07 ₹3,76,174.57 | 1,063.68 ₹3,76,744.82 |
| 8.00 | M-15 (1:2:4) cement concrete with OPC-43 grade cement, Kanhar river sand FM³ 2.5, coarse aggregate of dalla grit, 4.75-20mm. including cost of all material, labour, T&P, lead & lift, mechanical mixing & placing including cost of all labour, material, T&P, roylity and all taxes etc. for proper completion of work. | 341.58 | Cum | 6,500 ₹22,20,270 | 6,537.5 ₹22,33,079.25 | 6,455.31 ₹22,05,004.79 Lowest | 6,465.11 ₹22,08,352.27 |
| 9.00 | Reinforced cement concrete in M-25 with OPC-43 grade cement, Kanhar river sand FM³ 2.5, coarse aggregate of dalla grit, 4.75-20mm. including cost of all material, labour, T&P, lead & lift, mechanical mixing & placing including cost of all labour, material, T&P, roylity and all taxes etc. for proper completion of work. | 75.46 | Cum | 8,500 ₹6,41,410 Lowest | 9,095 ₹6,86,308.7 | 8,981.14 ₹6,77,716.82 | 8,994.79 ₹6,78,746.85 |
| 10.00 | Centering and shuttering for CC /RCC work including cost of labour, material, T&P, staging etc. required for proper completion of work. | 622.4 | Sqm. | 800 ₹4,97,920 Lowest | 925 ₹5,75,720 | 913.35 ₹5,68,469.04 | 914.73 ₹5,69,327.95 |
Tender Value
Refer Docs
EMD Value
₹3.2 L
Closing Date
11 Aug 2026, 2:00 pmClosed
Superintending Engineer
Office of KCC Pipri Sonbhadra UP
Construction of Canal from km. 0.300 to 0.750 ,0.800 to 1.080,1.260 to 1.430 , Pipe syphon at Km 0.850, at Km. 1.30, at Km. 1.650 on Karail Dy.
2026_UPIDC_1164248_4
03/SE/2026-27
Open Tender
Civil Works
Item Rate
120 days
Vill-Karail, Tahsil-Obra, Sonebhadra up
please refer tender document
2 documents required · 2 mandatory
₹2,360
₹3.2 L
1 Oct 2026
4 Aug 2026
11 Aug 2026
4 Aug 2026
11 Aug 2026
4 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work cutting in soil for making of Canal section including cost of labour charges, dressing of canal section required quantity for filling in embankment including lead up to 30 m and all lift, T&P, Labour, etc. required for proper completion of work as per directon of engineer- in- charge. | - | Cum | - | - |
| 2 | Excavating in canal other rock(Hard Rock) by blasting removing muck & stacking including all lift and lead up to 210 m etc for completion of work as per direction of engineer- in- charge. | - | Cum | - | - |
| 3 | Excavating in canal soft rock by blasting removing muck & stacking including all lift and lead up to 210 m etc for completion of work as per direction of engineer- in- charge. | - | Cum | - | - |
| 4 | Cutting Soil Used in Earth work filling by Power transport where execavated earth used from cutting section of canal with a lead up to 1 km including mechanical compaction with watering to bring it at OMC to achieve minimum 95% dry density of excavated earth with all lift and T&P etc required for proper completion of work as per direction of engineer-in charge. | - | Cum | - | - |
| 5 | Earth Work in Filling by power transport with lead up to 1.0 km including cost of excavation,loding,unloding,mechanical compaction with watering to bring it at OMC to Achieve minimum 95% Dry density of excavated earth and cost of labour charges,dressing etc with including all lift for proper completion of work as per direction of Engineer - in-charge. . | - | Cum | - | - |
| 6 | Earth work in excavation in foundation in all types of soil mixed with charri, bajari, kankar, soft rock, hard rocks etc. including wet earth work with slush with all lead and lift including back filling and disposal of surplus excavated earth including labours, T&P, taxes etc. for proper completion of the work. | 1 | Cum | - | - |
| 7 | Supplying and laying Sand on top of Pipe including cost of all material, labour, lead and lift, T&P, taxes etc. for proper completion of the work. | 1 | Cum | - | - |
| 8 | M-15 (1:2:4) cement concrete with OPC-43 grade cement, Kanhar river sand FM³ 2.5, coarse aggregate of dalla grit, 4.75-20mm. including cost of all material, labour, T&P, lead & lift, mechanical mixing & placing including cost of all labour, material, T&P, roylity and all taxes etc. for proper completion of work. | 1 | Cum | - | - |
| 9 | Reinforced cement concrete in M-25 with OPC-43 grade cement, Kanhar river sand FM³ 2.5, coarse aggregate of dalla grit, 4.75-20mm. including cost of all material, labour, T&P, lead & lift, mechanical mixing & placing including cost of all labour, material, T&P, roylity and all taxes etc. for proper completion of work. | 1 | Cum | - | - |
| 10 | Centering and shuttering for CC /RCC work including cost of labour, material, T&P, staging etc. required for proper completion of work. | 1 | Sqm. | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.07 MB
Tenderdocument03SE2026-27.pdf
Tender Documents • 3.91 MB
BOQ_2206946.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .