Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-Finance | L1 | Accepted-Finance FOUND OK | |
| 2 | L2₹2.0 L+₹2,108.10 (1.07%)Accepted-Finance | L2 | Accepted-Finance FOUND OK | |
| 3 | L3₹2.0 L+₹3,141.10 (1.59%)Accepted-Finance | L3 | Accepted-Finance FOUND OK |
Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
26 Jul 2021, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EDC-I ALIGARH
LAL DIGGI ALIGARH
Various work under deposit scheme and other related work under EDD-III, Aligarh
2021_DVVNL_602802_1
EDCA-06/2021-22
Open Tender
Electrical Works
Item Rate
60 days
EDD-III ALIGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
DVVNL AGRA
₹2,000
26 Jul 2021
13 Jul 2021
26 Jul 2021
13 Jul 2021
26 Jul 2021
13 Jul 2021
180 days
Amount
Cartage of following poles Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.).
PCC poles 8.5 Mtr.
ST pole 11 Mtr.
Cartage of line material viz Weasal Conductor, GI earth wire, Cross Arm, Angle, Channel, Insulator, Clamps & other line material from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.).
Erection of single support including complete H.T/L.T fittings as per RESPO manual and as per direction of Engineer incharge including the cost of labour, T & P and carrier etc. required for proper completion of work.
PCC poles 8.5 Mtr./ST Pole 11 Mtr.
Erection of 11 KV line double pole on PCC/ST pole including the work of complete line as per RESPO norm manual and as per direction of Engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work.
PCC poles 8.5 Mtr/ST Pole 11 Mtr.
Installation & fixing of 11 KV TPMO
Laying , sagging, stringing, binding and jumpering etc. of old line conductor on the newly erected pole as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work.
ACSR Weasal Conductor/Raccon Conductor
LT 3X50+1X35+1X16 bunch conductor
Drilling and cutting of tee off channel, V cross arms, Top channel, cross bracing angle, MS garding angle, Dropper chanel. as per specification of UPPCL construction manual including including loading and unloading at the both ends.
Making the plinth of ST pole 11 Mtr.
Chopping of tree branches which are touching to 11 KV/LT lines.
Fixing of earthing rod as per RESPO manual and as per direction of supervising engineer including the cost of labour
Erection and grouting of stay set including the work of nozzling etc. as per RESPO manual and also including the cost of arrangement of all grouting material, labour, T&P etc. required for proper completion of work
Providing and fixing of stay insulator.
Safe carriage & installation of transformer from Store Center or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends, including the work of dragging etc. and also including the cost of labour, T&P and carrier etc. required for proper completion of work. (Distance 0 to 50 Km..
16/25 KVA T/F
63 KVA T/F
Safe carriage of LT distribution box (three phase) from store centre Sarsol to pit site including loading and unloading at both ends mounting and fixing on pole also by making connections as per RESPO norms.
Safe carriage of XLPE cable of size 3x70/3x120/3x185 Sq. m.m. from store to respective site of work including loading unloading at both ends.
Laying of 3x70/3x120/3x185 Sq.mm. 11 KV under ground cable after digging trench of 600 mm. wide, 1500 mm deep, providing the fine sand cushion beneath and above the cable. The cable shall be duly protected by Ist class bricks, two on either side and third on top of the cable, laid in series one after the other. The work includes supplying of fine sand and bricks, filling and ramming of the left out soil, closing the trench and levelling. Spare cable shall be left and buried in the trench in the shape of rings at both ends. All material (except cable), labour, T&P carrier etc, required for proper completion of work will be arranged by the contractor at his own cost.
Providing & filling of 3x70/3x120/3x185 Sq.mm. 11 KV XLPE heat shrinkable cable jointing kits outdoor/indoor type including the cost of labour T&P carrier etc for proper completion of work.
SANJAY ELECTRICALS
M/S JITENDRA KUMAR
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .