Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Rejected-Technical | Rejected-Technical ALL DOCUMENTS ARE NOT SUBMITTED |
Tender Value
₹5.6 L
EMD Value
₹6,000
Closing Date
8 Dec 2022, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER VP
KARAMBAKUDI
Construction of Cremation shed, Construction of Compound wall adn Extension of pipe line at Soorakkadu Pothu BG in Mullankurichi Panchayat
2022_RDTN_269367_5
3678/2021/T4
Open Tender
Civil Works
Works
90 days
KARAMBAKUDI
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹6,000
Yes
2 Jan 2023
1 Dec 2022
8 Dec 2022
1 Dec 2022
8 Dec 2022
1 Dec 2022
Amount
Construction of Cremation shed, Construction of Compound wall adn Extension of pipe line at Soorakkadu Pothu BG in Mullankurichi Panchayat
Clearing the light jungle uprooting and all charges etc.
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20A for as per TWAD board officers foundation etc complete
Cement Concrete in 1 :4: 8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Refilling the basement with excavated earth othen than sand complying the including cost and conveyance of sand to worksite including all labour charges for filling etc complete
Filling with m- sand including cost and conveyance of sand to work site including all labour charges for filling etc complete
Brick Work in C m 1:5 mix using country brick of size 8 3/4 x 4 1/4 x2 3/4 including cost and conveyance of all materials to site and labour charges and etc,complete
Centering Shuttering and Scafollding for Soffits of slab of plan surface including shuttering 3 m high using Ms sheet of size 15X 25X 3 mm laid over w.joint of size 10X6.50 cm Spaced 75mm c/c complying with standard Specification
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification
R.C.C. 1:1.5:3-using 20mm ISS HBGS metal including cost and conveyance of materials and labour charges etc. complete
Ceiling Plastering with CM 1:3, 10mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Plastering with CM 1:5, 12mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
C.C. 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Colour washing two coats with best shell lime including cost and conveyace of all materials to work site and all labour charges etc. complete
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20A for as per TWAD board officers foundation etc complete
Filling with m- sand including cost and conveyance of sand to work site including all labour charges for filling etc complete
Cement Concrete in 1 :4: 8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification
R.C.C. 1:1.5:3-using 20mm ISS HBGS metal including cost and conveyance of materials and labour charges etc. complete
Brick Work in C m 1:5 mix using country brick of size 8 3/4 x 4 1/4 x2 3/4 including cost and conveyance of all materials to site and labour charges and etc,complete
Plastering with CM 1:5, 12mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Colour washing two coats with best shell lime including cost and conveyace of all materials to work site and all labour charges etc. complete
Earth work excavation in all soils with initial lead of 10m and lift of 2 M
Supply and delivery of following PVC pipes 63mm OD PVC 4 Ksc Pipes
Conveyance of the Lowering PVC rigid pipes and specials to trench and laying to proper grade and alignment, jointing with PVC couplers with cement paste.
Refilling exavated earth soil inculding all cost and conveyance etc. complete.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
U. SIVASAMY
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .