Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.9 LAccepted-AOC 403 GH MANSADEVI COMPLEX PANCHKULA 134109 HARYANA | PANCHKULA | HARYANA | 134109 | L1 | Accepted-AOC Lowest Bidder | |
| 2 | L2₹30.3 L+₹5.5 L (22.0%)Rejected-Finance HOUSE NO 251 E BLOCK ADARSH NAGAR BALLABHGARH FARIDABAD 121004 HARYANA | FARIDABAD | FARIDABAD | HARYANA | 121004 | L2 | Rejected-Finance Other than lowest bidder |
Tender Value
Refer Docs
EMD Value
₹70,000
Closing Date
30 Aug 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Col S S Babu
Headquarters 138 Works Engineers Pin-914138 C/o 56 APO
Repair/ Maint of Central Heating Plant installed at UG ops Room, Corps Offrs Mess and Signal Centre of Sector A under AGE E/M II of GE 865 EWS at Leh
2021_MES_464511_1
138WE/L-51/2021-22
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
GE 865 EWS
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE 865 EWS
₹70,000
Yes
20 Sept 2021
2 Aug 2021
6 Sept 2021
2 Aug 2021
30 Aug 2021
16 Aug 2021
60 days
Amount
Dismantling of burner assembly at HQ 14 Corps Offrs Mess CHS and removing of side cover of boiler capacity 1.5 lakh kilo cal/hr and complete servicing the boiler including exhaust outlet i.e chimney by removing the complete carbon/oil deposits with suitable coil shine chemical including repair to coil assembly by welding if there is any leakage found or any other repair required at site and reassembling/ testing the same, complete all as specified and directed by Engr-in-charge.
All as per srl item No 1 above but for 1 Lakh kilo cal/hr incl all filters of radiator assembly at Signal Centre complete all as specified and directed by Engr-in-charge.
All as per srl item No.1 above but for 0.60 Lakh kilo cal/hr at UG Ops Room complete all as specified and directed by Engr-in-charge.
M&L for rewinding of electric motor 3 phase 415 volts of capacity 3 HP with superior quality super enameled copper winding wire of appropriate size and gauge as existing including varnishing , cotton tape, PVC sleeves etc, complete all as specified and directed by Engr-in-Charge.
M&L for rewinding of electric motor 3 phase 415 volts of capacity 2 HP with superior quality super enameled copper winding wire of appropriate size and gauge as existing including varnishing , cotton tape, PVC sleeves etc, complete all as specified and directed by Engr-in-Charge.
S&F in sequence controller suitable for 0.6 to 1.5 lakh kilo cal/hr with burner rod assembly, complete all as specified and directed by Engr in Charge.
S&F in replacement of ignition rod suitable for 0.6 to 1.5 lakh kilo cal/hr burner rod assembly, complete all as specified and directed by Engr in Charge.
S&F in replacement of ignition Transformer electronic type suitable for 0.6 to 1.5 lakh kilo cal/hr burner rod assembly, complete all as specified and directed by Engr in Charge.
M & L for complete servicing of deisel pumps suitable for boiler of capacity 0.6 to 1.5 Lakh kilo cal/hr including replacement of bearings, seal etc as per site requirement complete all as directed by Engr-in-Charge.
S&F temp controller digital type DTC 503 with sensor suitable for 0.6 to 1.5 lakh kilo cal/hr LAL 2.25 burner rod assembly, complete all as specified and directed by Engr in Charge.
S&F in replacement of photo cell as per existing suitable for 0.6 to 1.5 lakh kilo cal/hr burner rod assembly, complete all as specified and directed by Engr in Charge.
S&F in replacement of burner nozzle suitable for 0.6 to 1.5 lakh kilo cal/hr complete all as specified and directed by Engr in Charge.
S&F in replacement of Electrode suitable for burner of capacity 0.6 to 1.5 lakh kilo cal/hr complete all as specified and directed by Engr in Charge.
S&F in replacement of pressure gauage 0 to 20 Kg/cm sq as per existing,complete all as specified and directed by Engineer-in-Charge.
S&F in replacement of thermostate assembly tail type as per existing suitable for 0 to 30 degree centrigrade temprature, complete all as specified and directed by Engr in Charge.
S&F in replacement of auto air pressure valve 3/8" as per existing, complete all as specified and directed by Engr in Charge.
S&F in replacement of High pressure fuel pipe 1.5 mtr as per existing,complete all as specified and directed by Engr in Charge.
M & L for replacement of burner complete assembly single phase 220 volts, Make Bentone Type ST-120, Model-ST-120K, or Equavelent Eco flame Capacity 02-5.6KG/hr, suitable for 1.5 Lac kilo cal/hr boiler complete all as specified and directed by Engr-in-Charge.
M & L for replacement of burner complete assembly single phase 220 volts, Make Bentone Type ST-120, Model-ST-120K, or Equavelent Eco flame Capacity 02-5.6KG/hr, suitable for 1 Lac kilo cal/hr boiler complete all as specified and directed by Engr-in-Charge.
M & L for replacement of burner complete assembly single phase 220 volts, Make Bentone Type ST-120, Model-ST-120K, or Equavelent Eco flame Capacity 02-5.6KG/hr, suitable for 0.6 Lac kilo cal/hr boiler complete all as specified and directed by Engr-in-Charge.
M &L for disconnecting the AHU any capacity complete shifting to out side of the building and replacing unserviceable parts cleaning inside and outside and testing complete all as specified and as directed by Engr-in-charge.
S&F in replacement of V - Belt, B-108 suitable for AHU motor complete all as specified and directed by Engr-in-charge.
Taking out the unservicable insulation from MS ERW pipe of size 80mm bore of pipe and providing for Insulation of MS Pipe with PUF slab 30 mm thick and applying bituminuous compound and GI cladding with 26 gauge GI sheet complete including complete earthwork for clearance around the pipe compete all as specifid and as directed.
Taking out the unservicable insulation from MS ERW pipe of size 50mm bore of pipe and providing for Insulation of MS Pipe with PUF slab 30 mm thick and applying bituminuous compound and GI cladding with 26 gauge GI sheet complete including complete earthwork for clearance around the pipe compete all as specifid and as directed.
Taking out the unservicable insulation from MS ERW pipe of size 40mm bore of pipe and providing for Insulation of MS Pipe with PUF slab 30 mm thick and applying bituminuous compound and GI cladding with 26 gauge GI sheet complete including complete earthwork for clearance around the pipe compete all as specifid and as directed.
Taking out the unservicable insulation from MS ERW pipe of size 32mm bore of pipe and providing for Insulation of MS Pipe with PUF slab 30 mm thick and applying bituminuous compound and GI cladding with 26 gauge GI sheet complete including complete earthwork for clearance around the pipe compete all as specifid and as directed.
Taking out the unservicable insulation from MS ERW pipe of size 25mm bore of pipe and providing for Insulation of MS Pipe with PUF slab 30 mm thick and applying bituminuous compound and GI cladding with 26 gauge GI sheet complete including complete earthwork for clearance around the pipe compete all as specifid and as directed.
Taking out the unservicable insulation from MS ERW pipe of size 20mm bore of pipe and providing for Insulation of MS Pipe with PUF slab 32 mm thick and applying bituminuous compound and GI cladding with 26 gauge GI sheet complete including complete earthwork for clearance around the pipe compete all as specifid and as directed.
M&L for 80mm dia MS ERW pipe heavy grade 'C' Class with insulation of MS pipe PUF Slab 40mm thick with and including applying bituminuous compound and GI cladding with 26 gauge GI sheet complete heavy grade class, 'C' with welded ends laid in ducts over the angle iron supports/ fixed on the walls including fittings complete all as specified and directed by Engr-in-Charge. (Note : The item rate is inclusive of cutting to any levels/shapes like elbows, tees, bends etc, welding joints wherever necessary as per the site requirement)
M&L for 50mm dia MS ERW pipe heavy grade 'C' Class with insulation of MS pipe PUF Slab 30mm thick with and including applying bituminuous compound and GI cladding with 26 gauge GI sheet complete heavy grade class, 'C' with welded ends laid in ducts over the angle iron supports/ fixed on the walls including fittings complete all as specified and directed by Engr-in-Charge. (Note : The item rate is inclusive of cutting to any levels/shapes like elbows, tees, bends etc, welding joints wherever necessary as per the site requirement)
All as per item No.30 above but of size 40mm
All as per item No.30 above but of size 32mm
All as per item No.30 above but of size 25mm
All as per item No.30 above but of size 20mm
Taking down old unserviceable PPR Pipe of size 20 to 40mm dia with complete all accessories
S&F PP-R pipes PN 16/SDR 7.4, 3 layer 40mm dia bore with all fittings conforming to IS-15801 and fixed complete to walls and ceiling or laid in floors or trenches including complete all fittings such as Tee, L Bend, Reducer, socket, Union etc complete all as specified & directed by Engr-in-Charge.
S&F PP-R pipes PN 16/SDR 7.4, 3 layer 32mm dia bore with all fittings conforming to IS-15801 and fixed complete to walls and ceiling or laid in floors or trenches including complete all fittings such as Tee, L Bend, Reducer, socket, Union etc complete all as specified & directed by Engr-in-Charge.
S&F PP-R pipes PN 16/SDR 7.4, 3 layer 25mm dia bore with all fittings conforming to IS-15801 and fixed complete to walls and ceiling or laid in floors or trenches including complete all fittings such as Tee, L Bend, Reducer, socket, Union etc complete all as specified & directed by Engr-in-Charge.
S&F PP-R pipes PN 16/SDR 7.4, 3 layer 20mm dia bore with all fittings conforming to IS-15801 and fixed complete to walls and ceiling or laid in floors or trenches including complete all fittings such as Tee, L Bend, Reducer, socket, Union etc complete all as specified & directed by Engr-in-Charge.
M&L for replacement of Cast iron Butterfly valve of size 80mm dia Class PN 1.6 with SG Iron Dice flanged ends (integrally cast) horizontal type, conforming to IS-14846 (ISI marked) with stainless steel spindle and iron wheel non rising type including jointing material complete such as rubber or fibre board insertion packing rings with requisite numbers of nuts, bolts & washers etc including taking out existing unserviceable valve complete all as specified and directed.
S&F in replacement of inlet/outlet forged brass ball valve 20 mm with Y Stainer for FCU, hot water for -25 to 90 degree temperature as per existing, including supply and fixing GI nipple of size 3/4 inch including welding work, cutting the existing rusty unserviceable MS/GI nipple complete including taking out existing unserviceable valve complete all as specified and directed.
S&F and replacement of Inlet/outlet forged brass ball valve 25 mm with Y Stainer for FCU, hot water for -25 to 90 degree temperature as per existing, including supply and fixing GI nipple of size 3/4 inch including welding work, cutting the existing rusty unserviceable MS/GI nipple complete including taking out existing unserviceable valve complete all as specified and directed.
S&F and replacement of Forged steel globe valve, bolted bonnet outside screw & yoke type rising stem for 25mm dia complete including taking out existing unserviceable valve complete all as specified and directed.
S&F and replacement of Forged steel globe valve, bolted bonnet outside screw & yoke type rising stem for 40mm dia complete including taking out existing unserviceable valve complete all as specified and directed.
S&F and replacement of Forged steel globe valve, bolted bonnet outside screw & yoke type rising stem for 50mm dia complete including taking out existing unserviceable valve complete all as specified and directed.
Supply and fixing gate valve confirming to ISO 9001- 2000 conforming to IS-15801 screwed down high pressure with crutch or butter fly handle screwed both ends for PP-R pipes or for union and fixed completely as specified for the size 40mm dia bore complete all as specified and directed bt Engr-in-Charge.
Supply and fixing gate valve confirming to ISO 9001- 2000 conforming to IS-15801 screwed down high pressure with crutch or butter fly handle screwed both ends for PP-R pipes or for union and fixed completely as specified for the size 32mm dia bore complete all as specified and directed bt Engr-in-Charge.
Supply and fixing gate valve confirming to ISO 9001- 2000 conforming to IS-15801 screwed down high pressure with crutch or butter fly handle screwed both ends for PP-R pipes or for union and fixed completely as specified for the size 25mm dia bore complete all as specified and directed bt Engr-in-Charge.
Supply and fixing gate valve confirming to ISO 9001- 2000 conforming to IS-15801 screwed down high pressure with crutch or butter fly handle screwed both ends for PP-R pipes or for union and fixed completely as specified for the size 20mm dia bore complete all as specified and directed bt Engr-in-Charge.
Brass flare nuts of size 20/15 mm bore and fix the brass valves/FCUs including taking out existing unserviceable valve complete all as specified and directed by Engr-in-charge.
S&F in replacement of FCU connection flexible pipe 20/16 mm as per existing, complete all as specified and directed by Engr-in-charge.
Material and labour for complete cleaning and checking the serviceability of fan coil unit of any capacity for having continuous sreviceability of FCU for any number of time as desired by Engr-in-Charge including replacement of minor spare part like Gasket, Teflon tape, flare nut, tightening of any loose glycol line connections, shifting FCU from one place to another place if required, heating up the freezed glycol line anywhere about the premices and cleaning with the chemical solution by pressure pump from inlet to outlet to have continuous flow of glycol fluid, repairing the insulation of pipe line of any size by providing shallow tape / GI wire as deemed fit, for fastening the insulation with pipe line, stopping any kind of leakage from any size of pipe line, tightening the loose electrical connections as related with FCU / Heating system, cleaning the air filter including radiator of FCU to the entire satisfaction of Engineer-in- Charge all as directed at site.
S&F in replacement of fan coil unit duel shaft electric motor 1/12 HP, 30 watt 930 RPM, 3 speed as per existing, complete all as specified and directed.
Supply and fixing radiator unit of FCU including connecting with the unit and making it leakproof of capacity 1.5 TR consisting of copper coils covered with aluminium finsing as per existing size of capacity 3000 kilo cal/hr including dismantling the existing unserviceable complete all as specified and directed by Engr-in-charge.
Supply and fixing radiator unit of FCU including connecting with the unit and making it leakproof of capacity 2.5 TR consisting of copper coils covered with aluminium finsing as per existing size of capacity 4500 kilo cal/hr including dismantling the existing unserviceable complete all as specified and directed.
Welding the leakage portion of MS pipe line including earhwork complete and materials as required for welding the pipe line of size 25 mm to 80 mm including testing on full pressure complete all as specified and directed.
M&L for cleaning of MS overhead POL storage tank of capacity 2000 Ltr including all type of T&P and chemical required for the same, including welding work to leakage surface including opening and refixing the existing insulating materials to the external surface of storage tank.
M&L for attending of complaint for day to day / daily complaints by employed skilled staff, checking the serviceability of fan coil unit of any capacity for having continuous sreviceability of FCU for any number of time as desired by Engr-in-Charge including replacement of minor spare part like Gasket, Teflon tape, flare nut, tightening of any loose glycol line connections, shifting FCU from one place to another place if required, heating up the freezed glycol line anywhere about the premices to have continuous flow of glycol fluid, repairing the insulation of pipe line of any size by providing shallow tape / GI wire as deemed fit, for fastening the insulation with pipe line, stopping any kind of leakage from any size of pipe line, tightening the loose electrical connections as related with FCU / Heating system, cleaning the air filter including radiator of FCU to the entire satisfaction of Engineer-in- Charge all as directed at site. Note :- (i) Attending any complaints of different nature in a single day in Corps HQ Complex Plant Room inside / outside will be considered as one job. (ii) Any kind of replacement of major items shall be measured and paid for separately under respective item of schedule 'A'. (iii) Any nature of complaint related with FCUs, radiators, bursting/cracking/leakage of MS pipe lines, replacement of valves etc will be completed round the clock by suitable trademen (welder with suitable T & P,(including portable heating materials)-01,Skilled mechanic of CHS-01, Plumber/Fitter with helper-each 01, Supervisor-01 as per descreation of Engineer-in- Charge. (iv) Job slip will be maintained by the contractor Supervisor under supervision of concerned JE E/M CHS, suitable communication shall be maintained through JE incharge round the clock. (v) Any dely in attending complaint will be directly reported to higher authorities and suitable penalities will be incured from the contractor (Minimum 1000/-Per job)
Supply and fixing and replacement of Chilled/Hot Water Fan coil Unit (FCU) vertical type Floor Mounting 2.5TR Capacity complete all as specified and directed by Engr-In-Charge. Make : Carrier/Zeco or equvalent ISI Marked.
Supply and fixing and replacement of Chilled/Hot Water Fan coil Unit (FCU) Wall Mounting 2TR Capacity complete all as specified and directed by Engr-In-Charge. Make : Universal/Carrier/Zeco or equvalent ISI Marked.
S & F in replacement of PVC flexible copper multistrand wire 3 core of 1.5 Sqmm as per existing, complete all as specified and directed
S&F in replacement of Soft Plug Top 6Amps with indicator as per existing complete all as specified and directed.
national engineering
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .