| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.2 LAccepted-AOC H NO 17 WATER TANK B D A COLONY TILA JAMALPURA BHOPAL M P | BHOPAL | BHOPAL | MADHYA PRADESH | ₹8.2 L | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹8.5 LRejected-Finance UJJAIN | MADHYA PRADESH | 456001 | ₹8.5 L | L2 | Rejected-Finance L2 Bidder |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Shree Arihant Urja Consultant L2 | VARIANT ASSOCIATES L1 |
|---|---|---|---|---|---|
| 1.00Providing & rewinding, transportation, testing commisionning of 630 KVA 33/0.44 kv ETE make transformer at MPS Gaughat sewage pump house | |||||
| 1.01 | Disconnecting, discharging the 33 kv supply, opening the connection HV & LV side of 630 KVA 33/0.44 KV Electric transformer & equipment co.ltd. make transformer. | 1 | Job | 10,000 ₹10,000 | 25,000 ₹25,000 |
| 1.02 | Complete opening all radiators & drain out old oil, lifting transformer from plinth and loading, unloading & transportaiton of transformer up to work shop. | 1 | Job | 17,500 ₹17,500 | 50,000 ₹50,000 |
| 1.03 | Opening the top cover of transformer, lifting & tacking out core from tank. Dismantling the stamping of core and removing all damaged 3 phase coil HV & LV side of transformer. | 1 | Job | 17,500 ₹17,500 | 56,000 ₹56,000 |
| 1.04 | Manufacturing of new HV side coils using TPC copper conductor/Dual coat SE copper conductor & applying suitable class of insulation and complete heating & processing work of coil. | 210 | Kg. | 1,500 ₹3.1 L | 960 ₹2.0 L |
| 1.05 | Manufacturing of new LV side coils using TPC copper conductor/Dual coat SE copper conductor & applying suitable class of insulation and complete heating & processing work of coil. | 180 | Kg. | 925 ₹1.7 L | 940 ₹1.7 L |
| 1.06 | Filling of new fresh insulating transformer oil including filtration oil complete job | 1,160 | Lit. | 155 ₹1.8 L | 90 ₹1.0 L |
| 1.07 | Making arrange of silica jell breather including cutting and welding pipe | 1 | Job | 5,500 ₹5,500 | 25,000 ₹25,000 |
| 1.08 | Cleaning and painting of transformer including two coat of heat and testing insulation paint inside the tank. | 1 | Job | 12,500 ₹12,500 | 15,000 ₹15,000 |
| 1.09 | Replacing of all hardware materials like nut-bolt uper and bottom wall | 1 | Job | 12,000 ₹12,000 | 15,000 ₹15,000 |
Tender Value
₹9.5 L
EMD Value
₹19,040
Closing Date
3 Feb 2026, 5:30 pmClosed
EE PHE Maintenance Division
Rajasv Colony Dashara Maidan Ujjain
Providing, repairing and rewinding work of 630 KVA 33/0.44 KV ETE make transformer at MPS Gaughat sewage pump house
2026_UAD_475470_1
PHE/E-TENDER 23/2026
Open Tender
Civil Works - Water Works
60 days
Ujjain
Please refer Tender Document
4 documents required · 4 mandatory
₹2,000
₹19,040
30 Apr 2026
14 Jan 2026
5 Feb 2026
14 Jan 2026
3 Feb 2026
14 Jan 2026
Providing & rewinding, transportation, testing commisionning of 630 KVA 33/0.44 kv ETE make transformer at MPS Gaughat sewage pump house
Disconnecting, discharging the 33 kv supply, opening the connection HV & LV side of 630 KVA 33/0.44 KV Electric transformer & equipment co.ltd. make transformer.
Complete opening all radiators & drain out old oil, lifting transformer from plinth and loading, unloading & transportaiton of transformer up to work shop.
Opening the top cover of transformer, lifting & tacking out core from tank. Dismantling the stamping of core and removing all damaged 3 phase coil HV & LV side of transformer.
Manufacturing of new HV side coils using TPC copper conductor/Dual coat SE copper conductor & applying suitable class of insulation and complete heating & processing work of coil.
Manufacturing of new LV side coils using TPC copper conductor/Dual coat SE copper conductor & applying suitable class of insulation and complete heating & processing work of coil.
Filling of new fresh insulating transformer oil including filtration oil complete job
Making arrange of silica jell breather including cutting and welding pipe
Cleaning and painting of transformer including two coat of heat and testing insulation paint inside the tank.
Replacing of all hardware materials like nut-bolt uper and bottom wall
Providing & fixing of bucoiz relay.
Complete checking & testing of transformer only routine test.
Loading, unloading & transformer of repaired transformer up to site and installation of transformer at substation complete reconnection LV & HV side connection as per I.E. Rule complete checking testing & trail of transformer at site.
Providing cost of E.H.V. GR-II transformer oil for other 33/0.43 kv, 500 kva transformer
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
tender.pdf
Tender Documents • 1.28 MB
condition.pdf
Other Document • 0.65 MB
BOQ_558836.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid