Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.0 LAccepted-AOC PLOT NO 24 NEW AZAD NAGAR KANPUR NAGAR | ₹29.0 L | L1 | Accepted-AOC Lowest Quoted Amount |
| 2 | L2₹30.3 LRejected-Finance | ₹30.3 L | L2 | Rejected-Finance Not Lowest Quoted Amount |
| 3 | L3₹31.0 LRejected-Finance | ₹31.0 L | L3 | Rejected-Finance Not Lowest Quoted Amount |
| 4 | L4₹31.2 LRejected-Finance AMBEDKAR PURAM 6 140 AWAS VIKAS SECTOT 6 KANPUR NAGAR | ₹31.2 L | L4 | Rejected-Finance Not Lowest Quoted Amount |
| 5 | L5₹31.5 LRejected-Finance | ₹31.5 L | L5 | Rejected-Finance Not Lowest Quoted Amount |
| Sl No | Description | Qty | Unit | M/S SHIVAM CONSTRUCTION AND SUPPLIER L6 | M/S Usha Builders L1 | M/S Usha Builders L1 | M/S VINOD KUMAR L4 | M/s. Jay Enterprises L3 | Anandeshwar Construction L2 | SRI VAMDEVAY ENTERPRISES L7 | m/s satya bhan singh contractor L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Cutting of behaya/sarpat /gondi/ Elephant Grass, Bushes and other Weeds With it's Disposal etc. | 6,239.03 | M2 | 1.51 ₹9,420.94 | 1 ₹6,239.03 Lowest | 1 ₹6,239.03 Lowest | 2.48 ₹15,472.79 | 2.46 ₹15,348.01 | 1 ₹6,239.03 Lowest | 3 ₹18,717.09 | 5 ₹31,195.15 |
| 2.00 | Earth work excavation in foundation including lead up to 30m and lift up to 1.5m including back filling and dressing etc.complete. | 295.7 | M3 | 80 ₹23,656 | 50 ₹14,785 Lowest | 50 ₹14,785 Lowest | 82.5 ₹24,395.25 | 82 ₹24,247.4 | 90 ₹26,613 | 100 ₹29,570 | 80 ₹23,656 |
| 3.00 | Providing and laying Cement concrete (1:3:6) with cement , coarse sand , and 20mm to 40mm crushed stone grit including cost of all material, labour and T&P etc.complete | 24.62 | M3 | 4,550 ₹1,12,021 | 4,800 ₹1,18,176 | 4,800 ₹1,18,176 | 4,469.52 ₹1,10,039.58 | 4,442.43 ₹1,09,372.63 | 4,000 ₹98,480 Lowest | 4,500 ₹1,10,790 | 4,000 ₹98,480 Lowest |
| 4.00 | Centering and shuttering for CC work including cost of all material labour and T&P etc.complete. | 1,066.42 | M2 | 352 ₹3,75,379.84 | 350 ₹3,73,247 | 350 ₹3,73,247 | 350.63 ₹3,73,918.84 | 348.5 ₹3,71,647.37 | 400 ₹4,26,568 | 390 ₹4,15,903.8 | 250 ₹2,66,605 Lowest |
| 5.00 | Supplying of steel bars with bending,binding,cutting and placing of reinforcement including cost of wire including all material, labour and T&P etc.complete. | 6.46 | M.T | 55,577 ₹3,59,027.42 | 60,000 ₹3,87,600 | 60,000 ₹3,87,600 | 55,139.7 ₹3,56,202.46 | 54,805.52 ₹3,54,043.66 | 45,000 ₹2,90,700 Lowest | 85,000 ₹5,49,100 | 65,000 ₹4,19,900 |
| 6.00 | Providing and laying Cement concrete (1:1.5:3) with cement , coarse sand , and 10mm to 20mm stone grit including cost of all material, labour and T&P etc.complete. | 98.65 | M3 | 5,700 ₹5,62,305 | 6,000 ₹5,91,900 | 6,000 ₹5,91,900 | 5,632.28 ₹5,55,624.42 | 5,598.14 ₹5,52,256.51 Lowest | 6,000 ₹5,91,900 | 8,000 ₹7,89,200 | 6,200 ₹6,11,630 |
| 7.00 | Brick work in 1:4 cement mortar with cement , coarse sand , and M-150 bricks . including cost of all material, labour and T&P etc.complete. | 119.61 | M3 | 4,800 ₹5,74,128 | 5,000 ₹5,98,050 | 5,000 ₹5,98,050 | 4,820.15 ₹5,76,538.14 | 4,790.94 ₹5,73,044.33 Lowest | 5,500 ₹6,57,855 | 5,000 ₹5,98,050 | 5,300 ₹6,33,933 |
| 8.00 | 12.5 mm thick cement plaster in 1:4 cement coarse sand on Structure including cost of all material, labour and T&P etc. complete. | 2,605.2 | M2 | 120 ₹3,12,624 | 90 ₹2,34,468 Lowest | 90 ₹2,34,468 Lowest | 135.32 ₹3,52,535.66 | 134.5 ₹3,50,399.4 | 182 ₹4,74,146.4 | 155 ₹4,03,806 | 200 ₹5,21,040 |
| 9.00 | Finishing walls with Acrylic Smooth exterior paint of required shade for New work Including all cost of labour , material & T&P etc complete. | 2,614.22 | M2 | 138 ₹3,60,762.36 | 90 ₹2,35,279.8 | 90 ₹2,35,279.8 | 100.22 ₹2,61,997.13 | 99.61 ₹2,60,402.45 | 75 ₹1,96,066.5 | 60 ₹1,56,853.2 | 50 ₹1,30,711 Lowest |
| 10.00 | Supplying & Fabrication and fixing of Mild Steel/iron work in grill , gate , Railling , Door , Window Frames including cutting , drilling , welding , riveting and fixing hinges where necessary with fixing in position including cost of all material , labour , T&P etc required for proper completion of work with one coat of red oxide primer . | 164.91 | Kg | 99 ₹16,326.09 | 100 ₹16,491 | 100 ₹16,491 | 99.37 ₹16,387.11 | 98.77 ₹16,288.16 | 90 ₹14,841.9 | 90 ₹14,841.9 | 75 ₹12,368.25 Lowest |
Tender Value
₹38 L
EMD Value
₹76,000
Closing Date
16 May 2026, 12:00 pmClosed
S. E. I.W.C. Kanpur
Office of the S.E. IWC 98 Canal Colony Kanpur
Construction work of boundary wall of Silmi Inspection Building in Fatehpur district.
2026_UPIDC_1143601_1
02/SE/2026-27
Open Tender
Civil Works
Item Rate
365 days
Fatehpur
Technical and Financial Bid
2 documents required · 2 mandatory
₹2,720
₹76,000
S. E. I.W.C. Kanpur
22 Aug 2026
2 May 2026
16 May 2026
2 May 2026
16 May 2026
2 May 2026
5 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting of behaya/sarpat /gondi/ Elephant Grass, Bushes and other Weeds With it's Disposal etc. | 6,239.03 | M2 | - | - |
| 2 | Earth work excavation in foundation including lead up to 30m and lift up to 1.5m including back filling and dressing etc.complete. | 295.7 | M3 | - | - |
| 3 | Providing and laying Cement concrete (1:3:6) with cement , coarse sand , and 20mm to 40mm crushed stone grit including cost of all material, labour and T&P etc.complete | 24.62 | M3 | - | - |
| 4 | Centering and shuttering for CC work including cost of all material labour and T&P etc.complete. | 1,066.42 | M2 | - | - |
| 5 | Supplying of steel bars with bending,binding,cutting and placing of reinforcement including cost of wire including all material, labour and T&P etc.complete. | 6.46 | M.T | - | - |
| 6 | Providing and laying Cement concrete (1:1.5:3) with cement , coarse sand , and 10mm to 20mm stone grit including cost of all material, labour and T&P etc.complete. | 98.65 | M3 | - | - |
| 7 | Brick work in 1:4 cement mortar with cement , coarse sand , and M-150 bricks . including cost of all material, labour and T&P etc.complete. | 119.61 | M3 | - | - |
| 8 | 12.5 mm thick cement plaster in 1:4 cement coarse sand on Structure including cost of all material, labour and T&P etc. complete. | 2,605.2 | M2 | - | - |
| 9 | Finishing walls with Acrylic Smooth exterior paint of required shade for New work Including all cost of labour , material & T&P etc complete. | 2,614.22 | M2 | - | - |
| 10 | Supplying & Fabrication and fixing of Mild Steel/iron work in grill , gate , Railling , Door , Window Frames including cutting , drilling , welding , riveting and fixing hinges where necessary with fixing in position including cost of all material , labour , T&P etc required for proper completion of work with one coat of red oxide primer . | 164.91 | Kg | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.62 MB
TenderDocumentsLot01.pdf
Tender Documents • 1.88 MB
BOQ_2136305.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].