| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.9 LAdmitted-Finance 337 C INDIRA GANDHI ROAD KONNAGAR HOOGHLY 712235 | KONNAGAR | HOOGHLY | WEST BENGAL | 712235 | L1 | Admitted-Finance | ||
| 2 | L2₹10.0 L+₹12,454.70 (1.26%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹10.2 L+₹33,805.61 (3.42%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹9.9 L
EMD Value
₹20,000
Closing Date
21 Feb 2026, 12:00 pmClosed
D.G(M)/ROADS
15 N. Nellie Sengupta Sarani, 4th Floor, HUDCO Building, Kolkata-700087.
CONSTRUCTION OF BOUNDARY WALL ADJACENT TO STONE DUST STACK YARD AT THE RIGHT SIDE OF JYOTI BASU SRAMIK ABASH, PALMER BAZAR ROAD, UNDER ASPHALTUM PALMER BAZAR DEPARTMENT.
2026_KMC_999636_1
KMC/ASPH/PB/SM-06/25-26
Open Tender
CIVIL WORKS
Percentage
KOLKATA
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹20,000
1 Oct 2026
7 Feb 2026
23 Feb 2026
7 Feb 2026
21 Feb 2026
7 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BUILDING WORKS. (T)MISCELLANEOUS WORKS: A. SPECIAL
WORKS. III. EVENT MANAGEMENT : 5) Hire and labour charges for
100mm dia bamboo railing on 150mm dia Jhau/Eucalyptus or other
approved timber 1.4 m above G.L. and 0.60 m below G.L. including
tying strongly with coir ropes and boring holes for posts in any soil
/black top/concrete surface, packing the sides etc. including cost of
carriage of all materials and labour complete and maintaining
barricading for a period beyond 5(five) days ater the reported &
recorded time of completion of the entire ork to the satisfaction of
Engineer-in-Charge, including restoration to the damages of the
ground to its original condition as per direction of Engineer-in -Charge
after removing the barricade. [Cost of restoration will be paid
separately.] (100 mm. dia bamboo railing & 150mm. dia
Jhau/Eucalyptus/other approved timber posts @ 1.80m apart). (i)
Railing with 4 rows. | 126 | METER | 106 | ₹13,356 |
| 2 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT
2. Earth work in excavation of foundation trenches or drains, in all
sorts of soil (including mixed soil but excluding laterite or sandstone)
including removing, spreading or stacking the spoils within a lead of
75 m. as directed. The item includes necessary trimming the sides of
trenches levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding
1,500 mm. | 0.47 | CUBIC METER PERCENT | 11,927 | ₹5,635.51 |
| 3 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT
4. (A) Filling in foundation or plinth by silver sand in layers not
exceeding 150 mm as directed and consolidating the same by
thorough saturation with water, ramming complete including the cost
of supply of sand. (payment to be made on measurement of finished
quantity) | 0.16 | CUBIC METER PERCENT | 93,621 | ₹14,745.31 |
| 4 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES
ETC 3. Dismantling R.C. floor, roof, beams etc including cutting rods
and removing rubbish as directed within a lead of 75 m. including
stacking of steel bars.(a) In ground floor including roof. | 10.91 | CUBIC METER | 1,956 | ₹21,344.85 |
| 5 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES
ETC. 1. Dismantling all types of masonry excepting cement concrete
plain or reinforced, stacking serviceable materials at site and
removing rubbish as directed within a lead of 75 m. (a) In ground floor
including roof. | 36.75 | CUBIC METER | 447 | ₹16,427.25 |
| 6 | BUILDING WORKS(P) SOLING, EDGING AND
METALLING??(1)Brick soling with picked jhama bricks including
preparation of bed as necessary with brick joints properly filled in and
packed with powdered earth and including necessary cushion of
similar material below the soling (and in between layers when more
than one layer is used) completes as per direction.(a) Single brick flat
soling (thickness 75 mm.) | 63 | SQUARE METER | 339 | ₹21,357 |
| 7 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc B.
CONCRETE WORKS 1. Cement concrete with graded jhama khoa
(30 mm size) excluding shuttering In ground floor and foundation (b)
1:4:8 proportion | 4.73 | CUBIC METER | 4,373 | ₹20,662.43 |
| 8 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc
6?..Controlled Cement concrete with well graded stone chips (20 mm
nominal size) excluding shuttering and reinforcement with complete
design of concrete as per IS : 456 and relevant special publications,
submission of job mix formula after preliminary mix design after
testing of concrete cubes as per direction of Engineer-in charge.
Consumption of cement will not be less than 300 Kg of cement with Super plasticiser per cubic meter of controlled concrete but actual
consumption will be determined on the basis of preliminary test and
job mix foumula. In ground floor and foundation.[using concrete
mixture]M 25 Grade (i) Pakur Variety | 26.34 | CUBIC METER | 4,918 | ₹1,29,520.14 |
| 9 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc?36..Hire
and labour charges for shuttering with centering and necessary
staging upto 4 m using approved stout props and thick hard wood
planks of approved thickness with required bracing for concrete slabs,
beams and columns, lintels curved or straight including fitting, fixing
and striking out after completion of works (upto roof of ground
floor).(When the height of a particular floor is more than 4 m the
equivalent floor height shall be taken as 4 m and extra for works
beyond the initial 4 m ht. shall be allowed under 12 (e) for every 4 m
or part thereof).(b) Above 30 mm & upto 37 mm thick wooden
shuttering as per decision & direction of Engineer-In-Charge.Notes:-
For shuttering in shell roof, grid roof with vertical faces folded plate,
arched roof the rate in 36 (a), 36 (b) & 37 (c ) of subhead B above to
be increased by 100 % . For grid roof with splayed faces, rate is to be
increased by 150%.Notes:- For shuttering in shell roof, grid roof with
vertical faces folded plate, arched roof the rate in 36 (a), 36 (b) & 37
(c ) of subhead B above to be increased by 100 % . For grid roof with
splayed faces, rate is to be increased by 150%. | 172.23 | SQUARE METER | 348 | ₹59,934.3 |
| 10 | Supplying and laying factory made vertical kerb stone of cement
concrete M-20 (1:1.5:3) machanicaly vibrated size 500mm X 300mm
BUILDING WORKS ( C ) Brickworks,Concrete Works
etc.40..Reinforcement for reinforced concrete work in all sorts of
structures including distribution bars, stirrups, binders etc initial
straightening and removal of loose rust (if necessary), cutting to
requisite length, hooking and bending to correct shape, placing in
proper position and binding with 16 gauge black annealed wire at
every intersection, complete as per drawing and direction.(a) For
works in foundation and upto roof of ground floor/upto 4 m.(i) Tor
steel/Mild Steel.I. SAIL/ TATA/RINL. | 3.83 | MATRIC TON | 58,249 | ₹2,22,815.62 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
BOQ_2448748.xls
BOQ • 0.28 MB
FORM.pdf
Tender Documents • 0.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .