| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical 87 78 SALEM CAMP POST THOTTIL PATTY METTUR DAM 636456 | SALEM | TAMIL NADU | 636456 | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹4,300
Closing Date
23 Nov 2023, 2:00 pmClosed
Chief Engineer / MTPS I
Office of the CE / MTPS I / Mettur Dam
MTPS I Civil Circle - Improvement works by providing lean to roof shed using colour coated sheets structural members steel tubes and MS hollow rectangular sections eastside of security cum time office building for commissioning of Bio Metric
2023_EB_388094_1
CE / MTPS I / SE / CIVIL / SPN NO 50 / 2023-2024
Open Tender
Civil Works
Works
90 days
Mettur Thermal Power Station I / Mettur Dam
As per Tender Specification
2 documents required · 2 mandatory
₹0
₹4,300
Yes
27 Nov 2023
10 Nov 2023
24 Nov 2023
10 Nov 2023
23 Nov 2023
10 Nov 2023
Amount
Dismantling of the existing structural steel frame work consisting of MS angles of size 90x90x8mm, Medium flange channels MS hollow rectangular pipe sections of various sizes and MS plates of various sizes erected as vertical post (columns), truss rafters, purlins, stiffener and etc., including cost of gas cutting without damaging the existing structure, stacking at site for re use, transport charges, cost of oxygen gas, acetelene gas, hire charges of gas cutting machine , finishing the cutting sides neatly, charges for T&P, cost of all consumables, all labour charges, lead, lift etc., complete and as and as directed by the department engineer at site.
Dismantling of existing colour coated metal roofing near ID Fan 1-A OF sheet of 0.47mm thick over MS structural steel frame fixed with screws carefully without damaging the existing structure as directed by the department Engineer at site including cost of all materials required for dismantling, labour charges, scaffolding charges, safety appliances, lead, lift, etc, complete.
Earth work excavation in all types of soils except hard rock requiring blasting without damaging the nearby structure and dumping nearby the with head load of 10 m and lift of 2m .This rate is inclusive of all cost of materials ,lead ,lift etc., complete.,
Providing PCC 1:1.5:3 mix using 20 to 12mm HB stone for foundation concrete as directed by the department engineer at site, including Shuttering charges, cost of all materials, curing, lead and lift etc., complete
Transporting, fabrication and erection of MS structural steel supports of colums, rafters, purlins, flange plates using existing shed near ID Fan 1-A dismantled M.S angles of size 90x90x8mm ,Medium flange channels MCP 150 and MCP 100 MS hollow rectangular sections of various sizes such as 100x50x4mm , 80x40x4mm and MS plates etc., including cost of transporting charges, Welding rods, fabrication, erection charges, hire charges of welding machine charges for T&P, cost of all consumables, all labour charges, lead, lift etc., complete and as and as directed by the department engineer at site.
Excluding cost of M.S.STRUCTRUAL Steel
Including cost of M.S.STRUCTRUAL Steel
Transporting and fixing of colour coated metal roofing sheet of 0.47mm thick over MS structural steel frame with necessary screws for fixing as directed by the department Engineer at site including cost of all materials but excluding cost of colour coated sheet, labour charges, scaffolding charges, safety appliances, lead, lift, etc, complete.
Using Dismantled Color coated sheets
Using new color coated sheets
Providing Brick work in CM1:5 using 2nd Class ground moulded chamber burnt Bricks, including cost of all materials, all labour charges, all leads & lifts, disposing of debris, all T&P's, curing etc complete.
Plastering in CM 1:5, 12mm thick for brick work inner surfaces of all walls including cost of all materials, scaffolding charges, Labour charges, curing, Lead, Lift, T&P etc., complete
Painting two coats with enamel paint over one coat of red oxide primer of good and standard approved quality to the steel work after through scrapping the old paint and including cost of all materials, brushes, lead, lift, etc., Complete.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .