Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹2.5 L
EMD Value
₹4,998
Closing Date
7 Aug 2023, 10:00 amClosed
DFO SF DODA
forest complex doda
Afforestation works by means of planting of Naked root plants pit and Trench planting at VW Lot. Khabeel Top Trithloo under SF Rang Doda and Div. Doda under CAPEX 2023-24
2023_FD_218876_1
47 of 2023-24 dated 26-06-2023
Open Tender
Civil Works
Item Rate
30 days
Khabil Top
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Yes
DFO SF DODA
₹4,998
Yes
3 Oct 2023
27 Jun 2023
8 Aug 2023
27 Jun 2023
7 Aug 2023
27 Jun 2023
Amount
VW Lot. Khabeel Top Trithloo under SF Rang Doda & Div. Doda CAPEX by way of following operations:
Planting of Naked Root saplings in staggered pits 45cm x 45cm x 45cm along contours as well as on the flat surface. The rates includes the cost of digging of pits, refilling with clean surface soil, carriage of plants, raising of water harvesting structures, application of insecticide and pesticide, FYM, weeding and hoeing etc.
Trench Plantation:- Planting of Naked Root Plants in Trenches of size 90x45x45 cms (one plant in each trench) and a water harvesting structure around each plant.
Planting of Grass Slips in patches of size 45 x 45 x 15cm including cost of Grass slip etc.
sowing of Grass seed in patches of size 45 x 45 x 15cm of size within the closures including cost of seed.etc.
DRSM works:(The rate includes the cost of collection, carriage of stones to the work site, fashioning of stones to be used along the exposed faces The front face of the DRSM wrok is to be mandatorily done with fashioned stone of size not less than 9" in diameter, no DRSM structure shall be more than 15' to 20' in length and 1 meter in height (with a maximum volume of 10 cum for single DRSM structure), the proper foundation for DRSM should be excuated alongwith provision for apron formation and bumbering of all DRSM work is to be done on the bigges stone on the bottom or lower second row of the structure specifying the number of structure as well as year of establishement (in gree and yellow paint)
Pond Work:- Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. 2.6.1 All kinds of soil No 1/2 Lenght 7 Breath 7 Height 1 = qty. 24.50
Dry random rubble masonry with hard stone in foundation and plinth: 7.3.2 Without bond stone No 2 Length 7 Breath 0.40+0.60/2 height 1 qty = 7.00 No .2 length 5.40 Breath 0.40+0.60/2 length 1 qty = 5.40 total = 12.10
Carraige of stone at an avg. distance of 1Km HL S. No 1 Itme No. 2 quantitly 12.40 Total = 10.10
Providing 15mm thick palstering in 1:4 mix including curing complete
Carriage of stones from source to the site of work an avg lead of 1km by MT and 2km by H/L
Carriage of Sand from source to work site at an avg. distance of 2km by MT & 2km by HL
Carriage of Bajri from source to work site at an avg. distance of 40km by MT & 2km by HL
Carriage of cement from source to work site at an avg. distance of 40km by MT & 2km by HL.
IKHLAQ SALEEM
Manzoor Ahmed Ganie
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .