Construction of Ferro Cement Hut Jhopa (2)
2026_FORES_533401_1
137/2025-26
Open Tender
Civil Works
Percentage
Range Sarada
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Secretary, RREIS
₹32,880
Yes
29 Jan 2026
29 Jan 2026
9 Feb 2026
29 Jan 2026
9 Feb 2026
30 Jan 2026
Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per MoRT&H specification clause 301.In ordinary rock
Random rubble dry stone Kharanja (soling) under floor.
Providing, laying and compacting plain/ reinforced cement concrete of specified grade in foundation/ levelling course/ pile cap using concrete mixer and vibrater complete including cost of form work, as per drawing and technical specifications and as per clause 1100, 1500,1700,2100 of MoRT&H specification including all scaffolding material, labour, machinery. PCC Grade M -20
Random rubble masonry with hard stone in foundation and plinth Cement mortar 1:3 (1 cement : 3 coarse sand)
Providing, laying and compacting plain/ reinforced cement concrete of specified grade in foundation/ levelling course/ pile cap using concrete mixer and vibrater complete including cost of form work, as per drawing and technical specifications and as per clause 1100, 1500,1700,2100 of MoRT&H specification including all scaffolding material, labour, machinery. PCC Grade M -20
Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete.
Centring and shuttering with plywood or steel sheet upto two stories Centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for
Extra for shuttering in circular work (20% of respective centring and shuttering items).
Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto two stories excluding the cost of centring, shuttering, finishing and reinforcement: M-25 Grade Concrete (1:1:2 (1 cement : 1 coarse sand : 2 graded stone aggregate 20 mm nominal size) -As per design mix)
Cement plastering including T&P, scaffolding, material and complete 1:4 (1 cement : 4 fine/ coarse sand) labour, including cost of water, curing, racking of joints etc. with 20 mm cement plaster of mix :
Extra for plastering done on moulding cornices or architraves In two coats including neat finish to line and level:
Providing & Fixing in position, Under Deck insulation for metal deck using 1000 Gsm synthetic wool with fixed to deck using adhesive and chicken mesh.
Applying one coat of cement primer of approved brand and manufacture on wall surface :
New work (Two or more coats applied @ 3.28 ltr/10 sqm) over and including base coat of water proofing cement paint applied @2.20kg/10 sqm.
Providing and applying plaster of paris putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete
Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story height made with 40mm dia. M.S. tube 1.5 m centre to centre horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after .The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer-in-charge .The elevational area of the scaffolding shall be measured for payment purpose .The payment will be made once irrespective of duration of scaffolding. (To be used for maintenance work judicially . necessary deduction for scaffolding in the existing item to be done.)
Add 15 Loading & unloading
genrator and water cost
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
Biddocument.pdf
Other Document • 4.16 MB
BOQ_950536.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .