Loading…
Loading…
Tender Value
₹1.3 Cr
EMD Value
₹2.6 L
Closing Date
13 Jul 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Revenue
KARWAR
2 conditions · 2 needing a document upload
5.3.1The tenderer must have minimum average annual contractual turnover of V/N or "V";whichever is less, where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Appendix-5 along with the copies of Audited Balance Sheet duly certified by the Chartered Accountant / Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii) One similar work costing not less than the amount equal to 60% of advertised value of the tender. Similar work: Tenderer must have successfully completed similar work involving: Concrete works (PCC/RCC) for bridge, substructures, wing walls, or retaining walls, side drain wall, CWD wall etc. Work Done certificate shall be submitted along with the tender.
1 condition
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Drainage improvement works at Byndoor, LC-86 & Udayavara Cuttings under the DEN/UD section of the Karwar Region of KRCL.
KR-KW-OL-W-2026-26-RB
KR-KW-OL-W-2026-26-RB
Open
Works - General
8 Months
Navi Mumbai, Maharashtra
₹0
₹2.6 L
13 Jul 2026
20 Jun 2026
29 Jun 2026
74 items across 12 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | Above/ 103107.03 Below/P | ||
| — | 200.00 | — | — | ||
| Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual Means for foundations and floors of the bridges, retaining walls etc. including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in layers with approved material and consolidation of the layers by ramming and watering etc. including all lift, disposal of surplus soil up to a lead of 300m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer in charge. All kinds of soils. | — | — | — | 33,928.36 | |
| — | 50.00 | — | — | ||
| Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual Means for foundations and floors of the bridges, retaining walls etc. including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in layers with approved material and consolidation of the layers by ramming and watering etc. including all lift, disposal of surplus soil up to a lead of 300m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer in charge. Hard rock (blasting prohibited) | — | — | — | 48,388.12 | |
| — | 100.00 | — | — | ||
| Providing and fixing Weep Holes in Abutments, Wing walls and Return walls etc., of new bridges with 110mm dia UPVC pipe Type A ISI marked | — | — | — | 20,790.55 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
ANNEXURE-V.pdf
ATTACHMENT
TDC.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .