| 1 | H1₹10.9 CrAdmitted-Finance | ₹10.9 Cr | H1 | Admitted-Finance |
| 2 | H2₹9.6 CrAdmitted-Finance | ₹9.6 Cr | H2 | Admitted-Finance |
| 3 | Rejected-Technical GRAM DHATURIYA DISTRICT RAJGARH MP | - | - | Rejected-Technical Dis Quallfied |
| Sl No | Description | Qty | Unit | FATEH ENVIRO ENGINEERS PVT. LTD. H1 | Vinay Choudhary H2 |
|---|---|---|---|---|---|
| 1.01 | 1. Design and build 1 Nos. sewage treatment plant of installed capacity 1.7 MLD based on the
Rotating Media Bio Reactor (RMBR) technology. and all appurtenant structures and allied works.
2. Work of Providing, Laying, Jointing, Testing, Commissioning 250 mm Dia DI-k7 length 80 m with suitable joints including testing of joints, cost of pipes and jointing material complete with up-to-date amendments.
3. Construction of 1.0 No Interception and Diversion Structure at Outfall of major nalla
4. Construction of Drain of length 70 M
5. Construction of retaining wall structure of height 5 m and Length-110 M
6. Reuse Plan: - 1.0 No Sump capacity-16 Kl with 2 Nos pump and 140 MM HDPE PN-6 Dia Length-100 pipe with 1.0 No hydrant .
7. Construction of 1.0 Sewage Pumping station with Pump house including Boundary, Approach Road, Gate, site development & all necessary electrical and mechanical accessories. Job includes Pumps and requires associated works to complete the job in all respect.
8. Establishment of 1 Nos. of Electrical Substation & 19 KW Solar system and providing and laying of HT Feeder Connection up to Sewerage Treatment Plant/ Pumping Station (For 1 KM) | 1 | nos | 4,32,90,000 ₹4.3 Cr | 3,80,78,987 ₹3.8 Cr |
| 1.02 | Operation and Maintenance Cost next 10 Years | 1 | nos | - | - |
| 1.03 | 1st Year | 1 | nos | 19,17,000 ₹19.2 L | 17,38,800 ₹17.4 L |
| 1.04 | 2nd Year | 1 | nos | 20,07,000 ₹20.1 L | 18,43,128 ₹18.4 L |
| 1.05 | 3rd Year | 1 | nos | 21,24,000 ₹21.2 L | 19,53,716 ₹19.5 L |
| 1.06 | 4th Year | 1 | nos | 22,68,000 ₹22.7 L | 20,70,939 ₹20.7 L |
| 1.07 | 5th Year | 1 | nos | 24,03,000 ₹24.0 L | 21,95,195 ₹22.0 L |
| 1.08 | 6th Year | 1 | nos | 25,47,000 ₹25.5 L | 23,26,907 ₹23.3 L |
| 1.09 | 7th Year | 1 | nos | 27,09,000 ₹27.1 L | 24,66,521 ₹24.7 L |
| 1.10 | 8th Year | 1 | nos | 28,54,000 ₹28.5 L | 26,14,512 ₹26.1 L |
Tender Value
₹4.5 Cr
EMD Value
₹2.2 L
Closing Date
6 Mar 2026, 5:30 pmClosed
CHIEF MUNCIPAL OFFICER
NAGAR PARISHAD UDAIPURA
Interception And Diversion of Nallahs with STP works Project of UDAIPURA town under SBM 2.0 (2nd Call)
2026_UAD_483258_1
1357
Open Tender
Civil Works - Others
365 days
UDAIPURA
Please refer Tender documents.
3 documents required · 3 mandatory
₹15,000
₹2.2 L
Udaipura
11 May 2026
18 Feb 2026
9 Mar 2026
18 Feb 2026
6 Mar 2026
18 Feb 2026
25 Feb 2026
1. Design and build 1 Nos. sewage treatment plant of installed capacity 1.7 MLD based on the Rotating Media Bio Reactor (RMBR) technology. and all appurtenant structures and allied works. 2. Work of Providing, Laying, Jointing, Testing, Commissioning 250 mm Dia DI-k7 length 80 m with suitable joints including testing of joints, cost of pipes and jointing material complete with up-to-date amendments. 3. Construction of 1.0 No Interception and Diversion Structure at Outfall of major nalla 4. Construction of Drain of length 70 M 5. Construction of retaining wall structure of height 5 m and Length-110 M 6. Reuse Plan: - 1.0 No Sump capacity-16 Kl with 2 Nos pump and 140 MM HDPE PN-6 Dia Length-100 pipe with 1.0 No hydrant . 7. Construction of 1.0 Sewage Pumping station with Pump house including Boundary, Approach Road, Gate, site development & all necessary electrical and mechanical accessories. Job includes Pumps and requires associated works to complete the job in all respect. 8. Establishment of 1 Nos. of Electrical Substation & 19 KW Solar system and providing and laying of HT Feeder Connection up to Sewerage Treatment Plant/ Pumping Station (For 1 KM)
Operation and Maintenance Cost next 10 Years
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th Year
7th Year
8th Year
9th Year
10th Year
NPV of O&M taking Discount factor at 11% (Cost in INR)(B)
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th Year
7th Year
8th Year
9th Year
10th Year
Power Consuption @ 6.5 Rs per unit
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th Year
7th Year
8th Year
9th Year
10th Year
NPV of Power Consumption taking discount factor at 11% (Cost in INR) ©
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th Year
7th Year
8th Year
9th Year
10th Year
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
ModelAnnexureE.pdf
Other Document • 2.18 MB
LWMtEnderDocs.pdf
Tender Documents • 2.06 MB
BOQ_567985.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid