Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-I₹45.5 LAccepted-AOC | ₹45.5 L | L-I | Accepted-AOC Accept |
| 2 | L-II₹45.9 LRejected-AOC | ₹45.9 L | L-II | Rejected-AOC Accept |
Tender Value
₹45.5 L
EMD Value
₹91,100
Closing Date
12 Dec 2022, 2:00 pmClosed
EE PWRD STTRD
O/O EE PWRD STTRD
Construction of Sahitya Sabha Satabarkhi Road (L-1.606 Km)(Prime Ministers visit programme) in PWD Sivasagar and Thowra Territorial Road Division under SOPD-G for the year 2022-23, Sivasagar LAC.Pkg. No. EE/ STTRD/ SOPD-G/22-23/ SIVASAGAR/05
2022_PWD_27997_4
STTRD/TB/NIT/11/2022-23 /Pt-IV/A-39/2099
Open Tender
Civil Works – Roads
Item Rate
45 days
Sivasagar
Please refer Tender documents.
4 documents required · 4 mandatory
₹900
₹91,100
Yes
7 Jan 2023
5 Dec 2022
13 Dec 2022
5 Dec 2022
12 Dec 2022
5 Dec 2022
Amount
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm in thick ness as per Technical Specification Clause 201.0 i) By Manual Means A) In area of non-thorny jungle
Construction of embankment with approved materials obtained from borrow pits with a lift upto 1.5m, transporting to site, spreading, grading to required slope and compaction to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000m as per Technical Specification Clause 301.5. (i) Private Land
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with 80-100 kn static roller to achieve the desired density, complete as per technical Specification Clause 401. ii) For Grading II Material
WBM. Grading II(Using stone screening Type-A 13.2 mm) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing packing, rolling rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405 By Manual Means
WBM. Grading III(Using stone screening Type-A 13.2 mm) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing packing, rolling rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per Technical Specification Clause 405 By Manual Means
M/s. PIONEER CONSTRUCTION
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .