Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹17.1 LAccepted-AOC 00 VIDYUT NAGAR MEERANPUR SADDARALI TANDA AMBEDKAR NAGAR UTTAR PRADESH 224238 | AMBEDKAR NAGAR | UTTAR PRADESH | 224238 | 1 | Accepted-AOC L-1 BIDDER | |
| 2 | 2₹21.0 L+₹1.9 L (9.97%)Rejected-AOC | 2 | Rejected-AOC L-2 BIDDER | |
| 3 | 3₹21.5 L+₹2.4 L (12.5%)Rejected-AOC | 3 | Rejected-AOC L-3 BIDDER | |
| 4 | Rejected-Technical | - | Rejected-Technical TECHNICALLY not QUALIFIED |
Tender Value
₹16.7 L
EMD Value
₹20,000
Closing Date
24 Aug 2020, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE OMC IV CTPS Parichha Jhansi
Office Of SE OMC IV CTPS Parichha Jhansi
Routine Maintenance, Preventive Maintenance and overhauling of various capacities LT motors ranging from fractional KW to170KW LT motors along with Round the clock Routine, preventive, breakdown Maintenance of their feeder module/breaker
2020_RVUNL_497880_1
T-06/OMC-IV CTPS/EMD-II/PTPP/2020-21
Open Tender
Electrical Works
Lump-sum
365 days
Office Of SE OMC IV CTPS Parichha Jhansi
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Dy CAO PTPP Parichha Jhansi
₹20,000
12 Apr 2021
31 Jul 2020
26 Aug 2020
31 Jul 2020
24 Aug 2020
31 Jul 2020
31 Jul 2020 - 24 Aug 2020
120 days
Amount
Routine Maintenance of 0.4 KV LT motors of Unit-5, Unit-6 and Common Auxiliaries (BOP). As per scope of work at Part-A(I) Sl. No. 1 to 28.
Round the clock Routine , preventive & Breakdown Maintenance of complete 0.4KV switchgears system of main plant & 0.4 KV switchgears system BOP area U#5&6 of 2x250 MW, PTPP, Parichha Jhansi as per scope of work at Part-A(II) Sl. No. 1 to 12.
OVERHAULING OF LT MOTORS upto 1 KW AS PER SCOPE OF WORK AT PART-B-I SL. NO. 1 TO18.)
OVERHAULING OF LT MOTORS above 1KW upto 5 KW AS PER SCOPE OF WORK AT PART-B-I SL. NO. 1 TO18.)
OVERHAULING OF LT MOTORS above 5KW upto 10 KW AS PER SCOPE OF WORK AT PART-B SL. NO. 1 TO18.
OVERHAULING OF LT MOTORS above 10KW upto 20 KW AS PER SCOPE OF WORK AT PART-B-I SL. NO. 1 TO18.
OVERHAULING OF LT MOTORS above 20KW upto 40 KW AS PER SCOPE OF WORK AT PART-B-I SL. NO. 1 TO18.
OVERHAULING OF LT MOTORS above 40KW upto 55 KW AS PER SCOPE OF WORK AT PART-B-I SL. NO. 1 TO18.
OVERHAULING OF LT MOTORS above 55KW upto 70 KW AS PER SCOPE OF WORK AT PART-B-I SL. NO. 1 TO18.
OVERHAULING OF LT MOTORS above 70KW upto 90 KW AS PER SCOPE OF WORK AT PART-B-I SL. NO. 1 TO18.
OVERHAULING OF LT MOTORS above 90KW upto 110 KW AS PER SCOPE OF WORK AT PART-B-I SL. NO. 1 TO18.
OVERHAULING OF LT MOTORS above 110KW upto 140 KW AS PER SCOPE OF WORK AT PART-B-I SL. NO. 1 TO18.
OVERHAULING OF LT MOTORS above 140KW upto 170 KW AS PER SCOPE OF WORK AT PART-B-I SL. NO. 1 TO18.
Breakdown Maintenance of RC Feeder motor eddy current clutch assembly as per scope of work Part B-(II) Sl. No. 1 to 6.
REPAIR OF MOTOR TERMINAL PLATE AND LEADS OF LT MOTORS upto 5 KW (AS PER SCOPE OF WORK AT PART-B-III Sl. No. 1 to 2)
REPAIR OF MOTOR TERMINAL PLATE AND LEADS OF LT Motors above 5 KW upto 20 KW (AS PER SCOPE OF WORK AT PART-B-III Sl. No. 1 to 2)
REPAIR OF MOTOR TERMINAL PLATE AND LEADS OF LT Motors above 20 KW upto 55 KW (AS PER SCOPE OF WORK AT PART-B-III Sl. No. 1 to 2)
REPAIR OF MOTOR TERMINAL PLATE AND LEADS OF LT Motors above 55 KW upto 70 KW (AS PER SCOPE OF WORK AT PART-B-III Sl. No. 1 to 2)
REPAIR OF MOTOR TERMINAL PLATE AND LEADS OF LT Motors above 70 KW upto 110 KW (AS PER SCOPE OF WORK AT PART-B-III Sl. No. 1 to 2)
REPAIR OF MOTOR TERMINAL PLATE AND LEADS OF LT Motors above 110 KW upto 135 KW (AS PER SCOPE OF WORK AT PART-B-III Sl. No. 1 to 2)
REPAIR OF MOTOR TERMINAL PLATE AND LEADS OF LT Motors above 135 KW upto 170 KW (AS PER SCOPE OF WORK AT PART-B-III Sl. No. 1 to 2)
SHIFTING OF LT MOTORS above 5 KW upto 20 KW (AS PER SCOPE OF WORK AT PART-B-IV Sl. No. 1
SHIFTING OF LT MOTORS above 5 KW upto 20 KW (AS PER SCOPE OF WORK AT PART-B-IV Sl. No. 2
SHIFTING OF LT MOTORS above 5 KW upto 20 KW (AS PER SCOPE OF WORK AT PART-B-IV Sl. No. 3
SHIFTING OF LT MOTORS above 20 KW upto 40 KW (AS PER SCOPE OF WORK AT PART-B-IV Sl. No. 1
SHIFTING OF LT MOTORS above 20 KW upto 40 KW (AS PER SCOPE OF WORK AT PART-B-IV Sl. No. 2
SHIFTING OF LT MOTORS above 20 KW upto 40 KW (AS PER SCOPE OF WORK AT PART-B-IV Sl. No. 3
SHIFTING OF LT MOTORS above 40 KW upto 70 KW (AS PER SCOPE OF WORK AT PART-B-IV Sl. No. 1
SHIFTING OF LT MOTORS above 40 KW upto 70 KW (AS PER SCOPE OF WORK AT PART-B-IV Sl. No. 2
SHIFTING OF LT MOTORS above 40 KW upto 70 KW (AS PER SCOPE OF WORK AT PART-B-IV Sl. No. 3
SHIFTING OF LT MOTORS above 70 KW upto 90 KW (AS PER SCOPE OF WORK AT PART-B-IV Sl. No. 1
SHIFTING OF LT MOTORS above 70 KW upto 90 KW (AS PER SCOPE OF WORK AT PART-B-IV Sl. No. 2
SHIFTING OF LT MOTORS above 70 KW upto 90 KW (AS PER SCOPE OF WORK AT PART-B-IV Sl. No. 3
SHIFTING OF LT MOTORS above 90 KW upto 135 KW (AS PER SCOPE OF WORK AT PART-B-IV Sl. No. 1
SHIFTING OF LT MOTORS above 90 KW upto 135 KW (AS PER SCOPE OF WORK AT PART-B-IV Sl. No. 2
SHIFTING OF LT MOTORS above 90 KW upto 135 KW (AS PER SCOPE OF WORK AT PART-B-IV Sl. No. 3
SHIFTING OF LT MOTORS above 135 KW upto 170 KW (AS PER SCOPE OF WORK AT PART-B-IV Sl. No. 1
SHIFTING OF LT MOTORS above 135 KW upto 170 KW (AS PER SCOPE OF WORK AT PART-B-IV Sl. No. 2
SHIFTING OF LT MOTORS above 135 KW upto 170 KW (AS PER SCOPE OF WORK AT PART-B-IV Sl. No. 3
Modification of existing eddy current drive into variable frequency driven RC feeders in Unit#5&6 of 2x250 MW, PTPP Parichha Jhansi as per scope of work sl. No. 1 to 10.
Overhauling of 0.4 KV Switchgear bus bar (large) as per scope of work Part-D(I) Sl. No. 1to 7.
Overhauling of 0.4 KV LT motor modules (Up to 30 KW) as per scope of work Part-D(II) Sl. No. 1 to 9.
Overhauling of 0.4 KV SFU Units as per scope of work Part-D(III) Sl. No. 1 to 4.
Overhauling of 0.4 KV LT breaker as per scope of work Part-D(IV) Sl. No. 1 to 19.
Refurbishment Of Damaged Modules/SFU With Supply Of Required Essential Material Like PVC Sheet Screw Nut Bolt Tape etc And Sealing Of Cable Entries.
M/S MADHU CONSTRUCTION
VISION ENGINEERING COMPANY
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .