Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 CrAdmitted-Finance 201 BANSI PLAZA 581 M G ROAD PALASIA INDORE MADHYA PRADESH 452001 | INDORE | MADHYA PRADESH | 452001 | ₹3.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.6 Cr+₹3.6 L (1.00%)Admitted-Finance 11 1 ALAKHNANDA NAGAR BEHIND BIRLA HOSPITAL M L NAGAR UJJAIN UJJAIN MADHYA PRADESH 456010 INDIA UDYAM MP 23 0000265 23ABDCS7267C1ZG R M MII STATUS AS VERIFIED | UJJAIN | MADHYA PRADESH | 456010 | ₹3.6 Cr+₹3.6 L (1.00%) | L2 | Admitted-Finance |
| 3 | L3₹3.8 Cr+₹17.5 L (4.89%)Admitted-Finance | ₹3.8 Cr+₹17.5 L (4.89%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SANATAN SUSTAINABLE SOLUTIONS PRIVATE LIMITED L2 | SWAAHA RESOURCE MANAGEMENT PRIVATE LIMITED L1 | Raheja Solar Food Processing L3 |
|---|---|---|---|---|---|---|
| 1.00 | FOR NAINI LOCATION AT PRAYAGRAJ (U.P): Planning & Design, Supply, Construction, Installation& Commissioning of Recycling Facility for MRF with Operation & Maintenance of one (01) years period in Prayagraj City (10 Tonnes per Day capacity) Take all necessary approvals for Pre-construction and during Constructional activities.Construction of Recycling facility for DRY waste through MRF providing all necessary Utility services as per finalized layout in conformity to SWM Waste Management Rules, 2016 and & other applicable laws. | 1 | per unit | 52,18,850 ₹52,18,850 | 46,16,675 ₹46,16,675 Lowest | 50,18,125 ₹50,18,125 |
| 2.00 | FOR NAINI LOCATION AT PRAYAGRAJ (U.P): Operation & Maintenance services of Material Recovery Facility Plant for processing DRY Waste | 1 | per unit | 1,28,84,029 ₹1,28,84,029 Lowest | 1,33,07,448 ₹1,33,07,448 | 1,37,82,714 ₹1,37,82,714 |
| 3.00 | FOR JHUNSI LOCATION AT PRAYAGRAJ (U.P):Planning & Design, Supply, Construction, Installation& Commissioning of Recycling Facility for MRF with Operation & Maintenance of one (01) years period in Prayagraj City (10 Tonnes per Day capacity)Take all necessary approvals for Pre-construction and during Constructional activities.Construction of Recycling facility for DRY waste through MRF providing all necessary Utility services as per finalized layout in conformity to SWM Waste Management Rules, 2016 and & other applicable laws | 1 | per unit | 52,18,850 ₹52,18,850 | 46,16,675 ₹46,16,675 Lowest | 50,18,125 ₹50,18,125 |
| 4.00 | FOR JHUNSI LOCATION AT PRAYAGRAJ (U.P): Operation & Maintenance services of Material Recovery Facility Plant for processing DRY Waste | 1 | per unit | 1,28,84,029 ₹1,28,84,029 Lowest | 1,33,07,448 ₹1,33,07,448 | 1,37,82,714 ₹1,37,82,714 |
Tender Value
Refer Docs
EMD Value
₹7.3 L
Closing Date
10 Dec 2021, 3:00 pmClosed
Environment Engineer
1 Sarojini Naidu marg Nagar Nigam Prayagraj
Design Supply Installation and Commissioning of 02 Existing Material Recovery Facility MRF Plant at Naini and Jhunsi for Processing of Dry Waste including O and M Services for a period of One year in Prayagraj City
2021_NNAMC_649912_1
Environment Department
Open Tender
Solid Waste Management
Piece-work
365 days
Nagar Nigam Prayagraj
as per tender docs
2 documents required · 2 mandatory
₹11,800
as per tender docs
₹7.3 L
Yes
17 Dec 2021
1 Dec 2021
10 Dec 2021
1 Dec 2021
10 Dec 2021
1 Dec 2021
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .